Grading and erosion control in Adelanto

Adelanto's own rules on grading and erosion control, with the code text for every value.

Each rule below links to the section of the Adelanto Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Adelanto's code says

Adelanto code What Adelanto's code adds
Erosion control plan
  • An approved erosion control plan is needed before building, grading or other permits where the Public Works Director expects erosion.
    Applies: Not required when no land is disturbed, such as work inside an existing building.
    § 17.93.050 · code text
    A Soil Erosion and Sediment Control Plan shall be submitted and approved in accordance with the provisions of this chapter prior to the issuance of building permits, soil erosion and sediment control permits, grading permits or any other permit where, in the opinion of the Director of Public Works, erosion can reasonably be expected to occur.
Grading without a permit
  • Exempt: fire-code clearing around buildings, septic or well work under a valid permit, and routine soil tests.
    Applies: Exempt from the erosion control chapter; septic and well work still follow its land-clearing and winter rules, and no sediment may enter a stream.
    § 17.93.100 · code text
    The following work is exempted from all provisions of this chapter except Sections 17.93.030, General Provisions, and 17.93.140, Appeals:
Rainy-season limits
  • October 15–April 15: land clearing over 1 acre or major grading over 1,000 cubic yards needs Public Works Director approval.
    Applies: During that period, disturbed ground must be protected by mulch or similar means.
    § 17.93.080 · code text
    The Director of Public Works shall only authorize the following between October 15 and April 15 when it is found that such projects comply with the provisions and are consistent with the purposes of this chapter:

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

What are the grading rules in Adelanto?

Adelanto's code: Exempt: fire-code clearing around buildings, septic or well work under a valid permit, and routine soil tests. (Exempt from the erosion control chapter; septic and well work still follow its land-clearing and winter rules, and no sediment may enter a stream.) (§ 17.93.100); An approved erosion control plan is needed before building, grading or other permits where the Public Works Director expects erosion. (Not required when no land is disturbed, such as work inside an existing building.) (§ 17.93.050).

General information, not legal advice.