Buellton · Building on your lot
Grading and erosion control in Buellton
A permit is needed for cuts or fills over 3 ft deep and/or over 30 cubic yards in 12 months.
Key points
- Grading: A permit is needed for cuts or fills over 3 ft deep and/or over 30 cubic yards in 12 months.
Each rule below links to the section of the Buellton Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Buellton's code says
| When a grading permit is needed |
|
|---|---|
| Steepest cut or fill slope |
|
| Grading without a permit |
|
Who this affects
HomeownersContractorsDesigners
Frequently asked questions
What are the grading rules in Buellton?
A permit is needed for cuts or fills over 3 ft deep and/or over 30 cubic yards in 12 months.
General information, not legal advice.
Ask about a specific Buellton property
Ask GoCodebook how Buellton's grading and erosion control rules apply to your situation and get an answer that cites the section.
Ask your question