Skip to content

City of Industry · Zoning · ROS

City of Industry ROS zoning: height, setbacks and lot size

In City of Industry's ROS zone, buildings can be up to 55 ft tall and the front setback is 30 ft from the front of the curb (City of Industry code, read October 2026).

Key points

  • Maximum building height: 55 ft
  • Minimum front setback: 30 ft from the front of the curb
  • Minimum side setback: None required
  • Minimum rear setback: None required

ROS (Recreation and Open Space Zone) is a zoning district in City of Industry. Every value below was read from the City of Industry Municipal Code and links to its section (read October 2026). State laws such as the ADU and SB 9 rules can allow more on a residential lot. General information, not legal advice — read the code text and check with the city before you build.

Development standards in ROS

The general rule for a typical lot in this zone. Zoning tables often attach notes, such as rules for corner lots, lots next to a residential zone, or new subdivisions only. Open “code text” under a value to see the table cell or sentence it was read from.

Maximum building height
55 ft
§ 17.26.030 · code text
Table row “Maximum height”, column “Maximum height”: • 55 feet.
Minimum front setback
30 ft from the front of the curb
§ 17.26.030 · code text
Table row “Front setbacks”, column “Front setbacks”: • 30 feet from front of curb of any street or highway, whether improved or not, to any habitable structure.
Minimum side setback
None required
§ 17.26.030 · code text
Table row “Rear and side setbacks”, column “Rear and side setbacks”: • None.
Minimum rear setback
None required
§ 17.26.030 · code text
Table row “Rear and side setbacks”, column “Rear and side setbacks”: • None.

Not on this page

We did not find a general stories, lot size, lot coverage, FAR, density limit for ROS in the zoning tables we read. The code may still set one elsewhere — check the City of Industry Municipal Code.

Other City of Industry zoning districts

Who this affects

HomeownersArchitects and designersDevelopersReal estate agents

Frequently asked questions

What is the maximum building height in City of Industry's ROS zone?

55 ft — City of Industry Municipal Code § 17.26.030.

What is the minimum front setback in City of Industry's ROS zone?

30 ft from the front of the curb — City of Industry Municipal Code § 17.26.030.

What is the minimum side setback in City of Industry's ROS zone?

None required — City of Industry Municipal Code § 17.26.030.

What is the minimum rear setback in City of Industry's ROS zone?

None required — City of Industry Municipal Code § 17.26.030.

General information, not legal advice.

Ask about a City of Industry property in ROS

Ask GoCodebook what you can build at a specific address and get an answer that cites the section.

Ask your question

More on City of Industry