Solar panels and EV chargers in Elk Grove

Elk Grove's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Elk Grove Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Elk Grove's code says

Elk Grove code What Elk Grove's code adds
EV charger permit
  • Approved, all permits issued, when the application meets the city checklist and all applicable laws and health and safety standards.
    Applies: EV charging station applications that do not need a minor conditional use permit or a parking reduction permit; the Building Official decides.
    § 16.07.300 · code text
    If the Building Official determines that the permit application is incomplete, he or she shall, within thirty (30) days of receipt of an application or resubmitted application or application materials, issue a written correction notice to the applicant, detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.
Solar permit process
  • Administrative, nondiscretionary review; a permit issues when a complete application meets the checklist and standard plan; only 1 inspection.
    Applies: Small residential rooftop solar energy systems eligible for expedited review.
    § 16.05.060 · code text
    The Building Department shall issue a building permit, the issuance of which is nondiscretionary, on the same day for over-the-counter applications or within one (1) to three (3) business days for electronic applications upon receipt of a complete application that meets the requirements of the approved checklist and standard plan.
Review time
  • Same day for over-the-counter applications, or within 1 to 3 business days for electronic applications.
    Applies: A complete application for a small residential rooftop solar system that meets the approved checklist and standard plan.
    § 16.05.060 · code text
    The Building Department shall issue a building permit, the issuance of which is nondiscretionary, on the same day for over-the-counter applications or within one (1) to three (3) business days for electronic applications upon receipt of a complete application that meets the requirements of the approved checklist and standard plan.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Elk Grove?

Elk Grove's code: Administrative, nondiscretionary review; a permit issues when a complete application meets the checklist and standard plan; only 1 inspection. (Small residential rooftop solar energy systems eligible for expedited review.) (§ 16.05.060); Approved, all permits issued, when the application meets the city checklist and all applicable laws and health and safety standards. (EV charging station applications that do not need a minor conditional use permit or a parking reduction permit; the Building Official decides.) (§ 16.07.300).

General information, not legal advice.