What Inglewood's code says

Inglewood code What Inglewood's code adds
EV charger permit
  • Applications and supporting documents may be submitted electronically, with electronic signatures.
    Applies: Applies to EV charging station installation.
    § 11-174 · code text
    The expedited, streamlined permitting process and checklist incorporates the recommendations contained in the most current version (which may change from time to time) of the "Plug-In Electric Vehicle Infrastructure Permitting Checklist"
  • The Building Official approves the application and issues all needed ministerial permits.
    Applies: Application meets the checklist, laws and IWP interconnection policies. The station may not be powered until IWP approves it.
    § 11-174 · code text
    then the Building Official shall, consistent with Government Code Section 65850.7, approve the application and issue all necessary ministerial permits.
Solar permit process
  • Administrative approval and all required permits once the complete application meets the checklist.
    Applies: Small rooftop solar systems eligible for expedited review. Connecting to the grid needs separate utility approval.
    § 11-171 · code text
    Upon confirmation by the Building Official of the application and supporting documentation being complete and meeting the requirements of the checklist, the Building Official shall administratively approve the application and issue all required permits or authorizations.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Inglewood?

Inglewood's code: Administrative approval and all required permits once the complete application meets the checklist. (Small rooftop solar systems eligible for expedited review. Connecting to the grid needs separate utility approval.) (§ 11-171); Applications and supporting documents may be submitted electronically, with electronic signatures. (Applies to EV charging station installation.) (§ 11-174).

General information, not legal advice.

Ask about a specific Inglewood property

Ask GoCodebook how Inglewood's solar panels and EV chargers rules apply to your situation and get an answer that cites the section.

Ask your question

More on building on your lot in Inglewood