Mission Viejo · Building on your lot

Solar panels and EV chargers in Mission Viejo

Mission Viejo issues small rooftop solar permits the same day over the counter or within 1 to 3 business days for complete electronic applications.

Key points

  • Rooftop solar: Mission Viejo issues small rooftop solar permits the same day over the counter or within 1 to 3 business days for complete electronic applications.

Each rule below links to the section of the Mission Viejo Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Mission Viejo's code says

Mission Viejo code What Mission Viejo's code adds
EV charger permit
  • The building division approves applications meeting the city checklist, laws and health and safety standards, and issues all needed permits.
    Applies: Electric vehicle charging stations.
    § 8.15.060 · code text
    The building division shall implement an expedited, streamlined permitting process for electric vehicle charging stations and adopt a checklist of all requirements with which electric vehicle charging stations shall comply with in order to be eligible for expedited review.
  • Electronic submittal is available.
    § 8.15.050 · code text
    Electronic submittal of the required permit application and associated supporting documents by electronic means shall be made available to all electric vehicle charging station permit applicants.
Solar permit process
  • Administrative, nondiscretionary review; permit issued when the application meets the checklist and standard plan; only one inspection.
    Applies: Small residential rooftop solar systems.
    § 8.14.060 · code text
    The city's building division shall implement an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems.
Review time
  • Permit issued the same day.
    Applies: Small residential rooftop solar; over-the-counter applications meeting the checklist and standard plan.
    § 8.14.060 · code text
    For applications that meet the requirements of the approved checklist and standard plan, the building division shall issue a building permit or other nondiscretionary permit the same day for an over-the-counter application, or within one to three business days of receipt of a complete electronic application.
  • Permit issued within 1 to 3 business days.
    Applies: Small residential rooftop solar; complete electronic applications meeting the checklist and standard plan.
    § 8.14.060 · code text
    For applications that meet the requirements of the approved checklist and standard plan, the building division shall issue a building permit or other nondiscretionary permit the same day for an over-the-counter application, or within one to three business days of receipt of a complete electronic application.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Mission Viejo?

Mission Viejo issues small rooftop solar permits the same day over the counter or within 1 to 3 business days for complete electronic applications.

General information, not legal advice.