Monte Sereno · Building on your lot
Grading and erosion control in Monte Sereno
Monte Sereno's own rules on grading and erosion control, with the code text for every value.
Each rule below links to the section of the Monte Sereno Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Monte Sereno's code says
| Erosion control plan |
|
|---|---|
| When a grading permit is needed |
|
| Grading without a permit |
|
| Rainy-season limits |
|
Who this affects
Frequently asked questions
What are the grading rules in Monte Sereno?
Monte Sereno's code: An engineered grading permit is needed when grading exceeds 1,000 cubic yards. (Counts all grading on the parcel combined.) (§ 9.04.080); A registered civil engineer's final erosion control plan is needed; staged projects need interim plans before each rainy season. (Exempt only if under one-half acre disturbed, slopes under 10%, grading under 50 and storage under 150 cubic yards, at least 100 feet from a watercourse.) (§ 9.04.120).
General information, not legal advice.
Ask about a specific Monte Sereno property
Ask GoCodebook how Monte Sereno's grading and erosion control rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in Monte Sereno
All building on your lot rules in Monte Sereno
Fences and walls in Monte Sereno
Sheds, garages and other accessory structures in Monte Sereno
Lot splits under SB 9 in Monte Sereno
Solar panels and EV chargers in Monte Sereno
Tree removal in Monte Sereno
Swimming pools in Monte Sereno
Pets, chickens and bees in Monte Sereno
Monte Sereno Municipal Code — full text