Grading and erosion control in Newport Beach

Newport Beach's own rules on grading and erosion control, with the code text for every value.

Each rule below links to the section of the Newport Beach Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Newport Beach's code says

Newport Beach code What Newport Beach's code adds
Erosion control plan
  • A grading and erosion control plan is required.
    Applies: Within the Newport Bay drainage catchment area, unless the Building Official waives it in writing.
    § 15.10.060 · code text
    Within the Newport Bay drainage catchment area, a grading and erosion control plan is required unless waived in writing by the Building Official.
Grading without a permit
  • Excavation for footings of a building, retaining wall or other structure under a valid building permit (not fill made from it, or an excavation left unsupported or unstable); excavation less than two feet deep, or not creating a cut slope greater than four feet in height and steeper than two horizontal to one vertical, and less than fifty (50) cubic yards on one site; fill not exceeding fifty (50) cubic yards on any one site, placed on natural undisturbed terrain flatter than five horizontal to one vertical or less than three feet deep and not intended to support structures
    Applies: only when the work does not create an adverse erosion, drainage, groundwater or slope condition
    § 15.10.030 · code text
    An excavation which (a) is less than two feet in depth; or (b) does not create a cut slope greater than four feet in height and steeper than two horizontal to one vertical; and (c) is less than fifty (50) cubic yards on one site
Rainy-season limits
  • Rainy season: October 15 to May 15. The Building Official may require erosion control for work extending into it.
    Applies: Grading projects whose completion extends into the rainy season.
    § 15.10.060 · code text
    The Building Official may require that grading operations and project designs be modified to provide for erosion control, including erosion protection devices, if project completion will extend into the rainy season (October fifteenth through May fifteenth) or if delays occur which incur weather-generated problems.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

What are the grading rules in Newport Beach?

Newport Beach's code: Excavation for footings of a building, retaining wall or other structure under a valid building permit (not fill made from it, or an excavation left unsupported or unstable); excavation less than two feet deep, or not creating a cut slope greater than four feet in height and steeper than two horizontal to one vertical, and less than fifty (50) cubic yards on one site; fill not exceeding fifty (50) cubic yards on any one site, placed on natural undisturbed terrain flatter than five horizontal to one vertical or less than three feet deep and not intended to support structures (only when the work does not create an adverse erosion, drainage, groundwater or slope condition) (§ 15.10.030); A grading and erosion control plan is required. (Within the Newport Bay drainage catchment area, unless the Building Official waives it in writing.) (§ 15.10.060).

General information, not legal advice.