Perris · Building on your lot
Solar panels and EV chargers in Perris
Perris's own rules on solar panels and EV chargers, with the code text for every value.
Each rule below links to the section of the Perris Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Perris's code says
| EV charger permit |
|
|---|---|
| Solar height and setbacks |
|
| Review time |
|
| Solar permit process |
|
Who this affects
Frequently asked questions
Do I need a permit for solar panels or an EV charger in Perris?
Perris's code: Electronic submittal by email, internet or fax; electronic signatures accepted. (Small residential rooftop solar permit applicants.) (§ 16.12.215); The building official approves applications meeting the city checklist, laws and safety standards, and issues all needed permits. (The charging station may not be energized or used until the city approves it.) (§ 16.25.040).
General information, not legal advice.
Ask about a specific Perris property
Ask GoCodebook how Perris's solar panels and EV chargers rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in Perris
All building on your lot rules in Perris
Fences and walls in Perris
Sheds, garages and other accessory structures in Perris
Running a business from home in Perris
Lot splits under SB 9 in Perris
Noise and construction hours in Perris
Group homes and residential care in Perris
Parking spaces required for homes in Perris
Signs on homes in Perris
Perris Municipal Code — full text