Solar panels and EV chargers in Pomona

A small rooftop solar system that meets the approved checklist and standard plan is processed in 3 business days.

Key points

  • Rooftop solar: A small rooftop solar system that meets the approved checklist and standard plan is processed in 3 business days.

Each rule below links to the section of the Pomona Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Pomona's code says

Pomona code What Pomona's code adds
EV charger permit
  • You may apply electronically, with the required permit processing and inspection fees.
    § 75-5 · code text
    The applicant may submit an application and related documentation for an electric vehicle charging station by electronic submittal, with all required permit processing and inspection fees, as specified on the city's website.
  • City approval and all needed permits are required before the station is turned on or used.
    Applies: Applies after a completed application.
    § 75-5 · code text
    A completed application does not authorize an applicant to energize or utilize the electric vehicle charging station until approval and all necessary permits are granted by the city.
  • The city approves and issues all needed permits once the checklist, laws and health and safety standards are met.
    Applies: Applies when the application and documents meet the city checklist and all laws and health and safety standards.
    § 75-6 · code text
    Upon confirmation by the director of development services that the permit application and supporting documents meet the requirements of the city adopted checklist, and is consistent with all applicable laws and health and safety standards, the director of development services shall, consistent with Government Code section 65850.7, as may be amended, approve the application, and issue all necessary permits.
Review time
  • The permit is issued within 3 business days.
    Applies: Applies to small home rooftop solar that meets the approved checklist and standard plan.
    § 74-300 · code text
    For an application for a small residential rooftop solar energy system that meets the requirements of the approved checklist and standard plan, the building division shall issue a building permit or other non-discretionary permit within three business days.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Pomona?

A small rooftop solar system that meets the approved checklist and standard plan is processed in 3 business days.

General information, not legal advice.