Skip to content

Riverside · Building on your lot

Building on your lot in Riverside

Riverside sets its own limits on accessory structures and home businesses, and has a separate chapter on fences, walls and landscape materials. Accessory structure height and size depend on the zone, the stories and the lot size.

Key points

  • Accessory height: In single-family zones, accessory structures are limited to 20 feet for 1 story and 30 feet for 2 stories (city rule).
  • Home businesses: Home offices may not have customer or client visits, and home instruction is limited to 1 pupil at a time (city rule).
  • Fences: The city has its own chapter on fences, walls and landscape materials.

Each rule below is marked Riverside code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.

Sheds, garages and other accessory structures

Riverside code In single-family zones, accessory structures are limited to 20 feet for 1 story and 30 feet for 2 stories (city rule).

All 13 Riverside rules on sheds, garages and other accessory structures, with the code text →

Running a business from home

Riverside code Home offices may not have customer or client visits, and home instruction is limited to 1 pupil at a time (city rule).

All 4 Riverside rules on running a business from home, with the code text →

Lot splits under SB 9

Riverside code About equal lots; none smaller than 40% of the original lot area. At least 1,200 square feet, or 40% of the original lot, whichever is greater.

All 6 Riverside rules on lot splits under SB 9, with the code text →

Solar panels and EV chargers

Riverside code What Riverside's code adds
EV charger permit
  • Building permit approval is nondiscretionary when the application meets the approved checklist and standards.
    Applies: EV charging stations with no specific, adverse impact on public health or safety.
    § 16.23.060 · code text
    The Building Official shall implement an administrative review process to expedite approval of electric vehicle charging stations and hydrogen fueling stations.
Solar permit process
  • Expedited permit review; only 1 inspection.
    Applies: Applies to small residential rooftop solar systems eligible for expedited review.
    § 16.22.060 · code text
    Only one inspection shall be required and performed by the Building and Safety Division for small residential rooftop solar energy systems eligible for expedited permit review.

Swimming pools

Riverside code An enclosure that meets state pool safety rules and separates the pool or spa from the home. Removable mesh fencing that meets ASTM F2286.

All 9 Riverside rules on swimming pools, with the code text →

Building in a flood zone

Riverside code What Riverside's code adds
Floodplain permit
  • You need a development permit for development, including manufactured homes, in any special flood hazard area.
    § 16.18.090 · code text
    Application for a development permit, including manufactured homes, within any area of special flood hazard established in Section 16.18.030 shall be made on forms furnished by the City of Riverside.
Height of the lowest floor
  • The lowest floor must be at or above the base flood elevation.
    Applies: New or substantially improved homes in AE, AH or A1-30 Zones.
    § 16.18.100 · code text
    In AE, AH, A1-30 Zones, elevated to or above the base flood elevation.
  • The lowest floor must be at least as high above the highest adjacent ground as the flood map depth number.
    Applies: New or substantially improved homes in an AO Zone where a depth number is given.
    § 16.18.100 · code text
    In an AO Zone, elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or elevated at least two feet above the highest adjacent grade if no depth number is specified.
  • The lowest floor must be at least 2 feet above the highest adjacent ground.
    Applies: New or substantially improved homes in an AO Zone where no depth number is given.
    § 16.18.100 · code text
    In an AO Zone, elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or elevated at least two feet above the highest adjacent grade if no depth number is specified.
  • The lowest floor must be at or above the base flood elevation.
    Applies: New or substantially improved homes in an unnumbered A Zone.
    § 16.18.100 · code text
    In an A Zone, without BFE's specified on the FIRM [unnumbered A zone], elevated to or above the base flood elevation; as determined under Section 16.18.055.

Grading and erosion control

Riverside code What Riverside's code adds
Steepest cut or fill slope
  • Cut and fill slopes may be no steeper than 2:1.
    Applies: Unless a soils or geology report shows a steeper slope is stable and the Public Works Director approves.
    § 17.28.010 · code text
    The slope of cut surfaces shall be no steeper than is safe for the intended use and shall be no steeper than two horizontal to one vertical (2:1) unless the owner furnishes a soils engineering or an engineering geology report, or both, stating that the site has been investigated and giving an opinion that a cut at a steeper slope will be stable

Building on a hillside

Riverside code Graded pad area may be at most 27,000 square feet. Graded pad area may be at most 21,000 square feet.

All 9 Riverside rules on building on a hillside, with the code text →

Noise and construction hours

Riverside code Noise may not exceed 45 dBA. Noise may not exceed 55 dBA.

All 4 Riverside rules on noise and construction hours, with the code text →

Outdoor lighting

Riverside code What Riverside's code adds
Fixture height
  • Freestanding pole lights may be no taller than 14 feet.
    Applies: Within 50 feet of a residentially zoned property or a home.
    § 19.590.070 · code text
    Freestanding pole lights shall not exceed a maximum height of 14 feet within 50 feet of a residentially zoned property or residential use.
Shielding
  • Lights must be aimed and shielded so light does not shine onto neighboring properties.
    § 19.590.070 · code text
    All lights shall be directed, oriented, and shielded to prevent light from shining onto adjacent properties, onto public rights-of-way, and into driveway areas in a manner that would obstruct drivers' vision.

Garage and yard sales

Riverside code What Riverside's code adds
Hours
  • Sales are allowed only from 7:00 a.m. to 5:00 p.m.
    Applies: Friday through Sunday only.
    § 5.49.060 · code text
    Yard sale operations are limited to the hours between 7:00 a.m. and 5:00 p.m. and may only occur on Friday through Sunday.
How long a sale may last
  • A sale may last no more than 3 days in a row.
    § 5.49.060 · code text
    A single yard sale may be up to three consecutive days long (Fri.-Sun.).
Sales per year
  • No more than 4 sales.
    Applies: Per person on a lot, per calendar year; each separate address on a split parcel gets 4.
    § 5.49.060 · code text
    Not more than four yard sales may be conducted by any person upon a lot within any one calendar year.

Family child care homes

CA state law California law
Zoning
A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning
Business license or fee
A city or county may not charge a business license, fee or tax to run a family child care home
Local rules
Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone
Small home
Up to eight children, counting the provider's own children under 10 who live there
Large home
7 to 14 children, counting the provider's own children under 10 who live there

Home alarm permits and false alarms

Riverside code Penalty amounts are set by City Council resolution; pay within 30 calendar days of the invoice A higher penalty may be set for each additional false alarm in a calendar year and for non-permitted alarms

All 6 Riverside rules on home alarm permits and false alarms, with the code text →

Signs on homes

Riverside code Real estate signs may be displayed without permits Address signs required by and conforming with the Building Code

All 11 Riverside rules on signs on homes, with the code text →

Trash and recycling carts

Riverside code Solid waste must not be placed in organic recyclable containers Remove containers no later than 8:00 p.m. on collection day

All 3 Riverside rules on trash and recycling carts, with the code text →

Other Riverside rules on this

Riverside's code also has these chapters. We have not summarized their values on this page yet; read them in the library.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

How tall can a fence be in Riverside?

The city has its own chapter on fences, walls and landscape materials. Riverside also has a related rule: Fences, walls and landscape materials (Ch. 19.550).

Do I need a permit for solar panels or an EV charger in Riverside?

Riverside's code: Expedited permit review; only 1 inspection. (Applies to small residential rooftop solar systems eligible for expedited review.) (§ 16.22.060); Building permit approval is nondiscretionary when the application meets the approved checklist and standards. (EV charging stations with no specific, adverse impact on public health or safety.) (§ 16.23.060).

What are the rules for building in a Riverside flood zone?

Riverside's code: You need a development permit for development, including manufactured homes, in any special flood hazard area. (§ 16.18.090); The lowest floor must be at or above the base flood elevation. (New or substantially improved homes in AE, AH or A1-30 Zones.) (§ 16.18.100).

What are the grading rules in Riverside?

Riverside's code: Cut and fill slopes may be no steeper than 2:1. (Unless a soils or geology report shows a steeper slope is stable and the Public Works Director approves.) (§ 17.28.010).

What are the outdoor lighting rules for homes in Riverside?

Riverside's code: Lights must be aimed and shielded so light does not shine onto neighboring properties. (§ 19.590.070); Freestanding pole lights may be no taller than 14 feet. (Within 50 feet of a residentially zoned property or a home.) (§ 19.590.070).

What are the garage sale rules in Riverside?

Riverside's code: No more than 4 sales. (Per person on a lot, per calendar year; each separate address on a split parcel gets 4.) (§ 5.49.060); Sales are allowed only from 7:00 a.m. to 5:00 p.m. (Friday through Sunday only.) (§ 5.49.060).

Can I run a family child care home in Riverside?

California law sets this for every city, including Riverside: Zoning: A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning (Health & Safety Code § 1597.45(a)); Business license or fee: A city or county may not charge a business license, fee or tax to run a family child care home (Health & Safety Code § 1597.45(b)); Local rules: Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone (Health & Safety Code § 1597.45(e)); Small home: Up to eight children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(c)); Large home: 7 to 14 children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(b)).

General information, not legal advice.

Ask about a specific Riverside property

Ask GoCodebook how these rules apply to your address and get an answer that cites the section.

Ask your question

More on Riverside