Skip to content

Salinas · Building on your lot

Building on your lot in Salinas

Salinas sets its own limits on fence heights, accessory structures and home businesses in residential districts, and fast-tracks rooftop solar permits. Fence height depends on the yard and, in corner side yards, on the setback.

Key points

  • Front fences: Fences in residential and agricultural front yards are limited to 3 feet, measured from the top of the nearest street curb.
  • Side and rear: Interior side and rear fences are limited to 8 feet; in corner side yards, 3 feet within 10 feet of the line, otherwise 8.
  • Accessory structures: Accessory structures in R districts are limited to 12 feet, or 15 feet with a pitched roof.
  • Home businesses: Home businesses need a permit, may use at most 25% of floor area, and generally allow no customers and only resident workers.
  • Home instruction: Home instruction is limited to 2 students per hour and 6 per day, or 5 and 35 with conditional use approval.
  • Rooftop solar: Complete rooftop solar applications meeting the checklist get permits within 3 business days, and inspections are scheduled within 2 business days.

Each rule below is marked Salinas code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.

Fences and walls

Salinas code Fences in residential and agricultural front yards are limited to 3 feet, measured from the top of the nearest street curb. Interior side and rear fences are limited to 8 feet; in corner side yards, 3 feet within 10 feet of the line, otherwise 8.

All 6 Salinas rules on fences and walls, with the code text →

Sheds, garages and other accessory structures

Salinas code Accessory structures in R districts are limited to 12 feet, or 15 feet with a pitched roof.

All 3 Salinas rules on sheds, garages and other accessory structures, with the code text →

Running a business from home

Salinas code Home businesses need a permit, may use at most 25% of floor area, and generally allow no customers and only resident workers. Home instruction is limited to 2 students per hour and 6 per day, or 5 and 35 with conditional use approval.

All 8 Salinas rules on running a business from home, with the code text →

Solar panels and EV chargers

Salinas code Complete rooftop solar applications meeting the checklist get permits within 3 business days, and inspections are scheduled within 2 business days.

All 4 Salinas rules on solar panels and EV chargers, with the code text →

Building in a flood zone

Salinas code A development permit is required before construction or development begins in any special flood hazard area. At least 2 feet above FIRM depth number, over the highest nearby grade; at least 2 feet if none given.

All 4 Salinas rules on building in a flood zone, with the code text →

Park and impact fees for new homes

Salinas code What Salinas's code adds
How the park fee is set
  • Set by city council resolution.
    Applies: Anyone who builds pays a park fee, along with street tree and sewer trunk line fees.
    § 9-41 · code text
    Every person who constructs buildings shall pay a development fee for park fee, street tree fee, storm sewer trunk line fee, and sanitary sewer trunk line fee in accordance with fees as adopted by resolution of the city council.

Noise and construction hours

Salinas code What Salinas's code adds
Leaf blowers and equipment
  • Power saws, sanders, drills, grinders, lawn or garden tools may not be used from 10:00 p.m. to 7:00 a.m.
    Applies: Home power tools that create a noise disturbance across a home or business property line.
    § 5-12.03 · code text
    Operating or permitting the operation of any mechanically-powered saw, sander, drill, grinder, lawn or garden tool, or similar tool between the hours of 10:00 p.m. and 7:00 a.m. so as to create a noise disturbance across a residential or a commercial property line.
Quiet hours
  • 10:00 p.m. to 7:00 a.m.
    Applies: Home devices that create a noise disturbance across a home or business property line.
    § 5-12.03 · code text
    Noise generated from residential devices between the hours of 10:00 p.m. and 7:00 a.m. in such a manner as to create a noise disturbance across a residential or a commercial property line or at any time to violate the provisions of this section.

Outdoor lighting

Salinas code What Salinas's code adds
Light at the property line
  • one-half footcandle maximum
    Applies: At an R or NU district property line
    § 37-50.480 · code text
    Illumination at an R or NU (NE, NG-1, and NG-2) district property line shall not exceed one-half footcandle maximum.
Shielding
  • Lights need cutoff optics, no light above the fixture; lamps must not be visible from neighbors or public rights-of-way.
    § 37-50.480 · code text
    Outdoor lighting shall employ cutoff optics that allows no light emitted above a horizontal plane running through the bottom of the fixture.

Garage and yard sales

Salinas code What Salinas's code adds
Permit
  • Yes, a permit is required for a garage, patio or backyard sale.
    § 15A-1 · code text
    the person conducting such sale shall first obtain a permit therefor conforming to the regulations as provided in this chapter.

Family child care homes

CA state law California law
Zoning
A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning
Business license or fee
A city or county may not charge a business license, fee or tax to run a family child care home
Local rules
Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone
Small home
Up to eight children, counting the provider's own children under 10 who live there
Large home
7 to 14 children, counting the provider's own children under 10 who live there

Affordable units in new housing (inclusionary)

Home alarm permits and false alarms

Salinas code An audible alarm sounding over 30 minutes is a nuisance; police may disconnect it at the user's cost Fees are established by resolution

All 3 Salinas rules on home alarm permits and false alarms, with the code text →

Signs on homes

Salinas code At most 32 square feet Remove within 10 days after the election

All 11 Salinas rules on signs on homes, with the code text →

Trash and recycling carts

Salinas code Organic waste goes in the separate receptacle from the exclusive franchisee, not in the garbage receptacle Carts and bins must not stay at the curb after the day of collection

All 4 Salinas rules on trash and recycling carts, with the code text →

Historic homes

Salinas code A certificate of approval is required before altering or demolishing a historic resource The community development director may approve or conditionally approve; otherwise it goes to the board

All 7 Salinas rules on historic homes, with the code text →

Other Salinas rules on this

Salinas's code also has these chapters. We have not summarized their values on this page yet; read them in the library.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

What park or impact fees apply to a new home in Salinas?

Salinas's code: Set by city council resolution. (Anyone who builds pays a park fee, along with street tree and sewer trunk line fees.) (§ 9-41).

What are the noise rules and construction hours in Salinas?

Salinas's code: 10:00 p.m. to 7:00 a.m. (Home devices that create a noise disturbance across a home or business property line.) (§ 5-12.03); Power saws, sanders, drills, grinders, lawn or garden tools may not be used from 10:00 p.m. to 7:00 a.m. (Home power tools that create a noise disturbance across a home or business property line.) (§ 5-12.03).

What are the outdoor lighting rules for homes in Salinas?

Salinas's code: Lights need cutoff optics, no light above the fixture; lamps must not be visible from neighbors or public rights-of-way. (§ 37-50.480); one-half footcandle maximum (At an R or NU district property line) (§ 37-50.480).

What are the garage sale rules in Salinas?

Salinas's code: Yes, a permit is required for a garage, patio or backyard sale. (§ 15A-1).

Can I run a family child care home in Salinas?

California law sets this for every city, including Salinas: Zoning: A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning (Health & Safety Code § 1597.45(a)); Business license or fee: A city or county may not charge a business license, fee or tax to run a family child care home (Health & Safety Code § 1597.45(b)); Local rules: Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone (Health & Safety Code § 1597.45(e)); Small home: Up to eight children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(c)); Large home: 7 to 14 children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(b)).

General information, not legal advice.

Ask about a specific Salinas property

Ask GoCodebook how these rules apply to your address and get an answer that cites the section.

Ask your question

More on Salinas