Skip to content

San Bruno · Building on your lot

Building on your lot in San Bruno

San Bruno sets its own limits on fences and home businesses, and has a separate section on accessory structures. Fence height depends on the yard and on corner lots.

Key points

  • Fence height: Fences: at most 3 feet in front yards, 6 feet in required side and rear yards, or 8 feet with lattice on top.
  • Home businesses: A home business may use 200 square feet or 10% of the home, whichever is greater; it needs a permit and business license.
  • Accessory structures: The city has its own code section on accessory structures.

Each rule below is marked San Bruno code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.

Fences and walls

San Bruno code Fences: at most 3 feet in front yards, 6 feet in required side and rear yards, or 8 feet with lattice on top.

All 4 San Bruno rules on fences and walls, with the code text →

Running a business from home

San Bruno code A home business may use 200 square feet or 10% of the home, whichever is greater; it needs a permit and business license.

All 5 San Bruno rules on running a business from home, with the code text →

RV and boat parking

San Bruno code What San Bruno's code adds
Where it may be parked
  • Only in an enclosed garage or a carport.
    Applies: Trailer coaches or camp cars stored more than 72 hours when not in use.
    § 4.52.080 · code text
    No person shall store for more than seventy-two hours any trailer coach or camp car, with the wheels thereof either attached or detached, when not in use, in any other place in the city than in a garage wherein the business of storing automobiles for hire is carried on, or in some other garage consisting of a building enclosed on four sides, or a carport, in which the business of storing automobiles for hire is not carried on.

Solar panels and EV chargers

San Bruno code What San Bruno's code adds
EV charger permit
  • The building official approves and issues all needed permits when the application meets the city checklist.
    Applies: EV charging stations; the application must also meet all applicable laws and health and safety standards.
    § 11.38.060 · code text
    Upon confirmation by the building official that the permit application and supporting documents meets the requirements of the city adopted checklist, and is consistent with all applicable laws and health and safety standards, the building official shall, consistent with Government Code Section 65850.7, approve the application and issue all necessary permits.
  • You can apply electronically.
    Applies: EV charging station permit applications and their documents.
    § 11.38.060 · code text
    Consistent with Government Code Section 65850.7, the building official shall allow for electronic submittal of permit applications covered by this chapter and associated supporting documentations.
Review time
  • Same day.
    Applies: Over-the-counter applications for small residential rooftop solar; complete and meeting the approved checklist and standard plan.
    § 11.36.060 · code text
    The community development department shall issue a building permit or other nondiscretionary permit the same day for over-the-counter applications or within one to three business days for electronic applications of receipt of a complete application and meets the requirements of the approved checklist and standard plan.
  • The permit is issued within 1 to 3 business days.
    Applies: Complete electronic applications that meet the approved checklist and standard plan.
    § 11.36.060 · code text
    The community development department shall issue a building permit or other nondiscretionary permit the same day for over-the-counter applications or within one to three business days for electronic applications of receipt of a complete application and meets the requirements of the approved checklist and standard plan.
Solar permit process
  • Administrative review; a permit is issued for a complete application meeting the approved checklist and standard plan; 1 inspection.
    Applies: Applies to small residential rooftop solar energy systems.
    § 11.36.060 · code text
    The city community development department shall adopt an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems within thirty days of the adoption of the ordinance codified in this chapter.

Swimming pools

San Bruno code The pool, or the part of the yard around it, must be fully enclosed by a fence. At least 6 feet high.

All 7 San Bruno rules on swimming pools, with the code text →

Noise and construction hours

San Bruno code Construction noise at 100 feet: at most 85 decibels 7 a.m.–10 p.m.; at most 60 decibels 10 p.m.–7 a.m. 45 decibels.

All 3 San Bruno rules on noise and construction hours, with the code text →

Family child care homes

CA state law California law
Zoning
A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning
Business license or fee
A city or county may not charge a business license, fee or tax to run a family child care home
Local rules
Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone
Small home
Up to eight children, counting the provider's own children under 10 who live there
Large home
7 to 14 children, counting the provider's own children under 10 who live there

Affordable units in new housing (inclusionary)

San Bruno code Affordable for not less than 55 years. Affordable for 45 years.

All 8 San Bruno rules on affordable units in new housing (inclusionary), with the code text →

Parking spaces required for homes

San Bruno code Operable vehicles may be parked only on a garage apron or driveway Operable vehicles may not be parked in other visible front or side yards; inoperable ones not in a visible yard

All 9 San Bruno rules on parking spaces required for homes, with the code text →

Home alarm permits and false alarms

San Bruno code What San Bruno's code adds
False alarm fees
  • Fees are set by city council resolution and get higher for each false alarm in a 180-day period
    § 6.48.010 · code text
    Such false alarm fees shall be in the amounts established by resolution of the city council, and shall be progressively higher for each false alarm which occurs during a one hundred eighty-day period.
False alarms before a fee
  • After the second false alarm in 180 days, police may send a warning notice; fees can follow
    Applies: Causes other than acts of God; applies to later false alarms
    § 6.48.010 · code text
    After the second false alarm from an alarm system during a one hundred eighty-day period, the police department may send a warning notice

Signs on homes

San Bruno code Not more than 90 days before the election Remove within 14 days after the election

All 6 San Bruno rules on signs on homes, with the code text →

Trash and recycling carts

San Bruno code What San Bruno's code adds
When carts must come back
  • Not left at curbside longer than 12 hours after the scheduled collection
    Applies: Recycling receptacles for residential units
    § 10.22.080 · code text
    Receptacles containing recyclable materials for residential units shall be placed at curbside for collection by the authorized recycling agent; but shall not be placed at curbside earlier than twelve hours prior to the date and time for scheduled collection, nor left remaining at curbside longer than twelve hours following the date and time for scheduled collection.
When carts may go to the curb
  • Not placed at curbside earlier than 12 hours before the scheduled collection
    Applies: Recycling receptacles for residential units
    § 10.22.080 · code text
    Receptacles containing recyclable materials for residential units shall be placed at curbside for collection by the authorized recycling agent; but shall not be placed at curbside earlier than twelve hours prior to the date and time for scheduled collection, nor left remaining at curbside longer than twelve hours following the date and time for scheduled collection.

Other San Bruno rules on this

San Bruno's code also has these chapters. We have not summarized their values on this page yet; read them in the library.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

How big can a shed or accessory building be in San Bruno?

The city has its own code section on accessory structures. San Bruno also has a related rule: Accessory structures (§ 12.84.140).

Can I park an RV or boat at my home in San Bruno?

San Bruno's code: Only in an enclosed garage or a carport. (Trailer coaches or camp cars stored more than 72 hours when not in use.) (§ 4.52.080).

Do I need a permit for solar panels or an EV charger in San Bruno?

San Bruno's code: Administrative review; a permit is issued for a complete application meeting the approved checklist and standard plan; 1 inspection. (Applies to small residential rooftop solar energy systems.) (§ 11.36.060); The building official approves and issues all needed permits when the application meets the city checklist. (EV charging stations; the application must also meet all applicable laws and health and safety standards.) (§ 11.38.060).

Can I run a family child care home in San Bruno?

California law sets this for every city, including San Bruno: Zoning: A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning (Health & Safety Code § 1597.45(a)); Business license or fee: A city or county may not charge a business license, fee or tax to run a family child care home (Health & Safety Code § 1597.45(b)); Local rules: Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone (Health & Safety Code § 1597.45(e)); Small home: Up to eight children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(c)); Large home: 7 to 14 children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(b)).

Do I need a permit for a home alarm in San Bruno?

San Bruno's code: Fees are set by city council resolution and get higher for each false alarm in a 180-day period (§ 6.48.010); After the second false alarm in 180 days, police may send a warning notice; fees can follow (Causes other than acts of God; applies to later false alarms) (§ 6.48.010).

When can trash carts go out to the curb in San Bruno?

San Bruno's code: Not left at curbside longer than 12 hours after the scheduled collection (Recycling receptacles for residential units) (§ 10.22.080); Not placed at curbside earlier than 12 hours before the scheduled collection (Recycling receptacles for residential units) (§ 10.22.080).

General information, not legal advice.

Ask about a specific San Bruno property

Ask GoCodebook how these rules apply to your address and get an answer that cites the section.

Ask your question

More on San Bruno