San Leandro · Building on your lot
Grading and erosion control in San Leandro
San Leandro's own rules on grading and erosion control, with the code text for every value.
Each rule below links to the section of the San Leandro Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What San Leandro's code says
| When a grading permit is needed |
|
|---|---|
| Steepest cut or fill slope |
|
| Grading without a permit |
|
| Rainy-season limits |
|
Who this affects
Frequently asked questions
What are the grading rules in San Leandro?
San Leandro's code: A grading permit is needed for more than 50 cubic yards. (When the slope is or will be over 20%, or the cut or fill is more than 5 feet high anywhere.) (§ 7-12-200); No grading in the wet season unless the City Engineer allows it in writing. (Temporary erosion and sediment controls must be in place by October 15 and kept up through April 15.) (§ 7-12-600).
General information, not legal advice.
Ask about a specific San Leandro property
Ask GoCodebook how San Leandro's grading and erosion control rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in San Leandro
All building on your lot rules in San Leandro
Fences and walls in San Leandro
Sheds, garages and other accessory structures in San Leandro
Running a business from home in San Leandro
Pets, chickens and bees in San Leandro
Parking spaces required for homes in San Leandro
Home alarm permits and false alarms in San Leandro
Historic homes in San Leandro
San Leandro Municipal Code — full text