San Pablo · Building on your lot

Solar panels and EV chargers in San Pablo

San Pablo's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the San Pablo Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What San Pablo's code says

San Pablo code What San Pablo's code adds
EV charger permit
  • Administrative, nondiscretionary permit once checklist and standard plan are met; same day over the counter, else 1 to 3 days.
    § 15.63.060 · code text
    The building official shall implement an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems and electrical vehicle charging stations.
  • Only 1 inspection is required; another inspection is allowed if the station fails.
    Applies: Applies to charging stations eligible for expedited review.
    § 15.63.060 · code text
    Only one inspection shall be required and performed by the building division for small residential rooftop solar energy systems or electrical vehicle charging stations eligible for expedited review.
Solar permit process
  • Administrative, nondiscretionary review; the permit is issued when the approved checklist and standard plan are met. Only 1 inspection.
    § 15.63.060 · code text
    Where the application is complete, the building division shall complete the building permit approval or denial process on the same day for over-the-counter applications or between one and three days where such over-the-counter approval is not authorized or feasible.
Review time
  • The permit is approved or denied the same day.
    Applies: Applies to complete over-the-counter applications.
    § 15.63.060 · code text
    Where the application is complete, the building division shall complete the building permit approval or denial process on the same day for over-the-counter applications
  • The permit is approved or denied within 1 to 3 days.
    Applies: Applies to complete applications where over-the-counter approval is not authorized or feasible.
    § 15.63.060 · code text
    or between one and three days where such over-the-counter approval is not authorized or feasible.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in San Pablo?

San Pablo's code: Administrative, nondiscretionary review; the permit is issued when the approved checklist and standard plan are met. Only 1 inspection. (§ 15.63.060); Administrative, nondiscretionary permit once checklist and standard plan are met; same day over the counter, else 1 to 3 days. (§ 15.63.060).

General information, not legal advice.