Solar panels and EV chargers in Signal Hill

Signal Hill's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Signal Hill Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Signal Hill's code says

Signal Hill code What Signal Hill's code adds
EV charger permit
  • Same day over the counter, or within 3 business days for electronic submissions.
    Applies: Small residential EV charger systems with a complete application meeting the standard plans and checklist.
    § 15.13.060 · code text
    shall be issued a building permit or other non-discretionary permit the same day for over the counter or within three business days for electronic submissions with a complete application that meets all the standard plans and checklist requirements.
Solar permit process
  • Expedited non-discretionary permit; 1 inspection.
    Applies: Small residential rooftop solar systems that meet the standard plans and checklist.
    § 15.13.060 · code text
    A. An application for any small size rooftop residential solar, residential energy storage system, also referred to as ESS, and residential EV charger system that meets the requirements of the approved standard plans and checklist of the city shall be issued a building permit or other non-discretionary permit the same day for over the counter or within three business days for electronic submissions with a complete application that meets all the standard plans and checklist requirements.
  • Apply electronically by email, the city website or fax; electronic signatures accepted.
    Applies: Small residential rooftop solar energy system permit applicants.
    § 15.13.050 · code text
    Electronic submittal of the required permit application and documents via email, the city's website, or facsimile shall be made available to all small residential rooftop solar energy system permit applicants.
Review time
  • Same day.
    Applies: Complete over-the-counter applications meeting the approved standard plans and checklist.
    § 15.13.060 · code text
    shall be issued a building permit or other non-discretionary permit the same day for over the counter
  • 3 business days.
    Applies: Electronic submissions with a complete application meeting all standard plans and checklist requirements.
    § 15.13.060 · code text
    within three business days for electronic submissions with a complete application that meets all the standard plans and checklist requirements.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Signal Hill?

Signal Hill's code: Expedited non-discretionary permit; 1 inspection. (Small residential rooftop solar systems that meet the standard plans and checklist.) (§ 15.13.060); Same day over the counter, or within 3 business days for electronic submissions. (Small residential EV charger systems with a complete application meeting the standard plans and checklist.) (§ 15.13.060).

General information, not legal advice.

Ask about a specific Signal Hill property

Ask GoCodebook how Signal Hill's solar panels and EV chargers rules apply to your situation and get an answer that cites the section.