Skip to content

Soledad · Building on your lot

Garage and yard sales in Soledad

Soledad's own rules on garage and yard sales, with the code text for every value.

Each rule below links to the section of the Soledad Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Soledad's code says

Soledad code What Soledad's code adds
Hours
  • 8 a.m. to 6 p.m.
    Applies: On the permitted days.
    § 5.32.040 · code text
    The sale shall not be conducted before eight a.m. or after six p.m. on the permitted days.
How long a sale may last
  • No more than 3 days in a row, or 2 weekends in a row of 2 days each.
    § 5.32.040 · code text
    No permit shall be approved and no sale shall be conducted for more than three consecutive days or for more than two consecutive weekends of two days each.
Permit
  • A permit is required; the fee is set in the annual Soledad Master Fee Schedule.
    § 5.32.030 · code text
    Before any garage sale may be conducted, a permit must be obtained for a fee established in the annual Soledad Master Fee Schedule.
Sales per year
  • No more than 4 permits per calendar year.
    Applies: For the same person or premises.
    § 5.32.030 · code text
    A maximum of four permits per calendar year may be issued to the same person or premises.
Signs
  • Signs only on the sale premises, up to 4 square feet each, shown only during permitted sale times.
    Applies: Garage sales with a permit.
    § 5.32.060 · code text
    Signs advertising a garage sale for which a permit has been issued under this chapter may be placed or erected on the sale premises, but not at any other location, subject to the following conditions: (a) no such sign shall exceed four square feet in area, and (b) no such sign shall be displayed at times other than the permitted times of sale.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

What are the garage sale rules in Soledad?

Soledad's code: No more than 4 permits per calendar year. (For the same person or premises.) (§ 5.32.030); A permit is required; the fee is set in the annual Soledad Master Fee Schedule. (§ 5.32.030).

General information, not legal advice.

Ask about a specific Soledad property

Ask GoCodebook how Soledad's garage and yard sales rules apply to your situation and get an answer that cites the section.

Ask your question

More on building on your lot in Soledad