Skip to content

Tustin · Zoning · M

Tustin M zoning: height, setbacks and lot size

In Tustin's M zone, buildings can be up to 50 feet tall and the front setback is None required (Tustin code, read October 2026).

Key points

  • Maximum building height: 50 feet
  • Minimum front setback: None required
  • Minimum side setback: None required
  • Minimum rear setback: None required
  • Maximum lot coverage: 100 percent (Less parking and landscaping requirements; see footnote (2))

M (Industrial District) is a zoning district in Tustin. Every value below was read from the Tustin Municipal Code and links to its section (read October 2026). State laws such as the ADU and SB 9 rules can allow more on a residential lot. General information, not legal advice — read the code text and check with the city before you build.

Development standards in M

The general rule for a typical lot in this zone. Zoning tables often attach notes, such as rules for corner lots, lots next to a residential zone, or new subdivisions only. Open “code text” under a value to see the table cell or sentence it was read from.

Maximum building height
50 feet
§ 9240 · code text
Table row “M Industrial District (Sec. 9242)”, column “Building Height”: 50 feet
Minimum front setback
None required
See note 1 below the table in the code.
§ 9240 · code text
Table row “M Industrial District (Sec. 9242)”, column “Front Yard (1)”: None
Note 1: If it fronts onto secondary or primary highway then refer to Section 9271u.
Minimum side setback
None required
See note 1 below the table in the code.
§ 9240 · code text
Table row “M Industrial District (Sec. 9242)”, column “Interior Side Yard (1)”: None
Note 1: If it fronts onto secondary or primary highway then refer to Section 9271u.
Minimum rear setback
None required
See note 1 below the table in the code.
§ 9240 · code text
Table row “M Industrial District (Sec. 9242)”, column “Rear Yard (1)”: None
Note 1: If it fronts onto secondary or primary highway then refer to Section 9271u.
Maximum lot coverage
100 percent
Applies: Less parking and landscaping requirements; see footnote (2)
See note 2 below the table in the code.
§ 9240 · code text
Table row “M Industrial District (Sec. 9242)”, column “Lot Coverage”: 100 percent (2)
Note 2: Less parking and landscaping requirements.

Not on this page

We did not find a general stories, lot size, FAR, density limit for M in the zoning tables we read. The code may still set one elsewhere — check the Tustin Municipal Code.

Other Tustin zoning districts

Who this affects

HomeownersArchitects and designersDevelopersReal estate agents

Frequently asked questions

What is the maximum building height in Tustin's M zone?

50 feet — Tustin Municipal Code § 9240.

What is the minimum front setback in Tustin's M zone?

None required — Tustin Municipal Code § 9240.

What is the minimum side setback in Tustin's M zone?

None required — Tustin Municipal Code § 9240.

What is the minimum rear setback in Tustin's M zone?

None required — Tustin Municipal Code § 9240.

What is the maximum lot coverage in Tustin's M zone?

100 percent (less parking and landscaping requirements; see footnote (2)) — Tustin Municipal Code § 9240.

General information, not legal advice.

Ask about a Tustin property in M

Ask GoCodebook what you can build at a specific address and get an answer that cites the section.

Ask your question

More on Tustin