Yountville sets fence heights by yard, with lower limits in front yards and at corners, and allows taller open screens with approval. Moderate and major home businesses need a permit, and some uses are not allowed.

Key points

  • Fence height: Yountville limits fences to 3 feet at the front property line or in the front yard, and 6 feet along rear or side lines.
  • Home business: Yountville moderate home businesses need an administrative use permit, major ones a use permit; welding and repair of non-residents' vehicles are not allowed.

Each rule below is marked Yountville code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.

Fences and walls

Yountville code Yountville limits fences to 3 feet at the front property line or in the front yard, and 6 feet along rear or side lines.

All 5 Yountville rules on fences and walls, with the code text →

Running a business from home

Yountville code Yountville moderate home businesses need an administrative use permit, major ones a use permit; welding and repair of non-residents' vehicles are not allowed.

All 10 Yountville rules on running a business from home, with the code text →

Solar panels and EV chargers

Yountville code What Yountville's code adds
EV charger permit
  • Administrative, nondiscretionary review; the Building Official approves when the application meets health and safety rules and the checklist.
    Applies: Applies to electric vehicle charging stations.
    § 15.43.060 · code text
    The Director shall adopt an administrative, nondiscretionary review process to expedite approval of permit applications for electric vehicle charging stations.
  • Apply in person, by mail or electronically.
    Applies: Applies to electric vehicle charging stations.
    § 15.43.050 · code text
    The applicant may submit the permit application and associated documentation by personal, mailed, or electronic submittal.
Review time
  • The permit is issued within 5 business days.
    Applies: Small residential rooftop solar, after a complete application is found to meet the checklist and standard plan.
    § 15.45.060 · code text
    The Planning and Building Department shall issue a building permit within five business days of determining that an application that meets the requirements of the approved checklist and standard plan is complete.

Tree removal

Yountville code No permit needed for: a dead tree (the Town consulting arborist confirms it and the Planning Officer approves); removal approved in an earlier development entitlement; routine maintenance for tree health or property protection; or a tree the Planning Officer finds before removal to be a hazard because it is dying, diseased or damaged (verified in writing by a certified arborist or licensed tree surgeon), is a pyrophyte such as Monterey pine, Bishop pine, acacia or eucalyptus, or is damaging a utility that cannot be relocated where mitigation is not feasible Yes, a tree removal permit is required before removing any protected tree from private property.

All 9 Yountville rules on tree removal, with the code text →

Pets, chickens and bees

Yountville code Up to 2 hives of honeybees (Apis mellifera), or keeping Osmia bees. Up to 10 hives.

All 7 Yountville rules on pets, chickens and bees, with the code text →

Building in a flood zone

Yountville code What Yountville's code adds
Floodplain permit
  • A development permit is needed before any construction or other development, including manufactured homes.
    Applies: In any special flood hazard area.
    § 15.48.030 · code text
    A development permit shall be obtained before any construction or other development, including manufactured homes, within any area of special flood hazard established in Section 15.47.070.
Building in a floodway
  • No new building or development, including fill, unless all development combined raises base flood level no more than 1 foot.
    Applies: Zones A1-30 and AE, until a regulatory floodway is adopted; measured at any point in the Town.
    § 15.52.060 · code text
    Until a regulatory floodway is adopted, no new construction, substantial development, or other development (including fill) shall be permitted within Zones A1-30 and AE, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other development, will not increase the water surface elevation of the base flood more than one foot at any point within the Town of Yountville.
  • No fill, new building, substantial improvement or other development unless a civil engineer certifies no rise in flood levels.
    Applies: Inside an adopted regulatory floodway.
    § 15.52.060 · code text
    Within an adopted regulatory floodway, the Town of Yountville shall prohibit encroachments, including fill, new construction, substantial improvements, and other development, unless certification by a registered civil engineer is provided demonstrating that the proposed encroachment shall not result in any increase in flood levels during the occurrence of the base flood discharge.
Height of the lowest floor
  • The lowest floor must be 1 foot or more above the base flood elevation.
    Applies: New or substantially improved homes in AE, AH and A1-30 Zones.
    § 15.52.010 · code text
    In AE, AH, A1-30 Zones, elevated one foot or more above the base flood elevation.
  • At least the FIRM depth number, in feet, above the highest nearby grade.
    Applies: New or substantially improved homes in an AO Zone with a depth number given.
    § 15.52.010 · code text
    In an AO Zone, elevated above the highest adjacent grade to a height equal to or exceeding the depth number specified in feet on the FIRM, or elevated at least 2 feet above the highest adjacent grade if no depth number is specified.
  • At least 2 feet above the highest nearby grade.
    Applies: New or substantially improved homes in an AO Zone with no depth number given.
    § 15.52.010 · code text
    elevated at least 2 feet above the highest adjacent grade if no depth number is specified.
  • The lowest floor must be 1 foot or more above the base flood elevation.
    Applies: New or substantially improved homes in an unnumbered A zone with no base flood elevation on the FIRM.
    § 15.52.010 · code text
    In an A Zone, without BFEs specified on the FIRM (unnumbered A zone), elevated one foot or more above the base flood elevation; as determined under Section 15.48.020(C).

Noise and construction hours

Yountville code 9:00 a.m. to 6:00 p.m. 9:00 a.m. to 6:00 p.m.

All 6 Yountville rules on noise and construction hours, with the code text →

Outdoor lighting

Yountville code 0.5 footcandles at the property boundary. Full cut-off, fully shielded lights aimed down, with no light above the horizontal.

All 6 Yountville rules on outdoor lighting, with the code text →

Family child care homes

CA state law California law
Zoning
A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning
Business license or fee
A city or county may not charge a business license, fee or tax to run a family child care home
Local rules
Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone
Small home
Up to eight children, counting the provider's own children under 10 who live there
Large home
7 to 14 children, counting the provider's own children under 10 who live there

Trash and recycling carts

Yountville code Collection is mandatory. Self-haul only after certifying to the Town Manager that service is not needed and meeting listed criteria. Collection is not required.

All 5 Yountville rules on trash and recycling carts, with the code text →

Other Yountville rules on this

Yountville's code also has these chapters. We have not summarized their values on this page yet; read them in the library.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Yountville?

Yountville's code: The permit is issued within 5 business days. (Small residential rooftop solar, after a complete application is found to meet the checklist and standard plan.) (§ 15.45.060); Administrative, nondiscretionary review; the Building Official approves when the application meets health and safety rules and the checklist. (Applies to electric vehicle charging stations.) (§ 15.43.060).

What are the rules for building in a Yountville flood zone?

Yountville's code: A development permit is needed before any construction or other development, including manufactured homes. (In any special flood hazard area.) (§ 15.48.030); The lowest floor must be 1 foot or more above the base flood elevation. (New or substantially improved homes in AE, AH and A1-30 Zones.) (§ 15.52.010).

Can I run a family child care home in Yountville?

California law sets this for every city, including Yountville: Zoning: A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning (Health & Safety Code § 1597.45(a)); Business license or fee: A city or county may not charge a business license, fee or tax to run a family child care home (Health & Safety Code § 1597.45(b)); Local rules: Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone (Health & Safety Code § 1597.45(e)); Small home: Up to eight children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(c)); Large home: 7 to 14 children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(b)).

General information, not legal advice.

Ask about a specific Yountville property