[A] 104.1 General. The code official is hereby authorized and directed to enforce the provisions of this code.
[A] 104.2 Determination of compliance. The code official shall have the authority to determine compliance with this code, to render interpretations of this code and to adopt policies and procedures in order to clarify the application of this code’s provisions. Such interpretations, policies, and procedures:
- Shall be in compliance with the intent and purpose of this code.
- Shall not have the effect of waiving requirements specifically provided for in this code.
[A] 104.2.1 Listed compliance. Where this code or a referenced standard requires equipment, materials, products or services to be listed and a listing standard is specified, the listing shall be based on the specified standard. Where a listing standard is not specified, the listing shall be based on an approved listing criteria. Listings shall be germane to the provision requiring the listing. Installation shall be in accordance with the listing and the manufacturer’s instructions, and where required to verify compliance, the listing standard and manufacturer’s instructions shall be made available to the code official.
[A] 104.2.2 Technical assistance. To determine compliance with this code, the code official is authorized to require the owner or owner’s authorized agent to provide a technical opinion and report.
[A] 104.2.2.1 Cost. A technical opinion and report shall be provided without charge to the jurisdiction.
[A] 104.2.2.2 Preparer qualifications. The technical opinion and report shall be prepared by a qualified engineer, specialist, laboratory or fire safety specialty organization acceptable to the code official. The code official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional.
[A] 104.2.2.3 Content. The technical opinion and report shall analyze the properties of the design, operation or use of the building or premises and the facilities and appurtenances situated thereon to identify and propose necessary recommendations.
[A] 104.2.2.4 Tests. Where there is insufficient evidence of compliance with the provisions of this code, the code official shall have the authority to require tests as evidence of compliance. Test methods shall be as specified in this code or by other recognized test standards. In the absence of recognized test standards, the code official shall approve the testing procedures. Such tests shall be performed by a party acceptable to the code official.
1-22 2025 CALIFORNIA EXISTING BUILDING CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
ADMINISTRATION
[A] 104.2.3 Alternative materials, design and methods of construction, and equipment. The provisions of this code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative is not specifically prohibited by this code and has been approved.
Exception: Performance-based alternative materials, designs or methods of construction and equipment complying with the ICC Performance Code. This exception shall not apply to alternative structural materials or to alternative structural designs.
[A] 104.2.3.1 Approval authority. An alternative material, design or method of construction shall be approved where the code official finds that the proposed alternative is satisfactory and complies with Sections 104.2.3.2 through 104.2.3.7, as applicable.
[A] 104.2.3.2 Application and disposition. Where required, a request to use an alternative material, design or method of construction shall be submitted in writing to the code official for approval. Where the alternative material, design or method of construction is not approved, the code official shall respond in writing, stating the reasons the alternative was not approved.
[A] 104.2.3.3 Compliance with code intent. An alternative material, design or method of construction shall comply with the intent of the provisions of this code.
[A] 104.2.3.4 Equivalency criteria. An alternative material, design or method of construction shall, for the purpose intended, be not less than the equivalent of that prescribed in this code with respect to all of the following, as applicable:
Quality.
Strength.
Effectiveness.
Durability.
Safety, other than fire safety.
Fire safety.
[A] 104.2.3.5 Tests. Tests conducted to demonstrate equivalency in support of an alternative material, design or method of construction application shall be of a scale that is sufficient to predict performance of the end use configuration. Such tests shall be performed by a party acceptable to the code official.
[A] 104.2.3.5.1 Fire tests. Tests conducted to demonstrate equivalent fire safety in support of an alternative material, design or method of construction application shall be of a scale that is sufficient to predict fire safety performance of the end use configuration. Tests shall be performed by a party acceptable to the code official.
[A] 104.2.3.6 Reports. Supporting documentation, where necessary to assist in the approval of materials or assemblies not specifically provided for in this code, shall comply with Sections 104.2.3.6.1 and 104.2.3.6.2.
[A] 104.2.3.6.1 Evaluation reports. Evaluation reports shall be issued by an approved agency, and use of the evaluation report shall require approval by the code official for the installation. The alternate material, design or method of construction and product evaluated shall be within the scope of the code official’s recognition of the approved agency. Criteria used for the evaluation shall be identified within the report and, where required, provided to the code official.
proved agency, and use of the evaluation report shall require approval by the code official for the installation. The alternate material, design or method of construction and product evaluated shall be within the scope of the code official’s recognition of the approved agency. Criteria used for the evaluation shall be identified within the report and, where required, provided to the code official.
[A] 104.2.3.6.2 Other reports. Reports not complying with Section 104.2.3.6.1 shall describe criteria, including but not limited to any referenced testing or analysis, used to determine compliance with code intent and justify code equivalence. The report shall be prepared by a qualified engineer, specialist, laboratory or fire safety specialty organization acceptable to the code official. The code official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional.
[A] 104.2.3.7 Peer review. The code official is authorized to require submittal of a peer review report in conjunction with a request to use an alternative material, design or method of construction, prepared by a peer reviewer that is approved by the code official.
[A] 104.2.4 Modifications. Where there are practical difficulties involved in carrying out the provisions of this code, the code official shall have the authority to grant modifications for individual cases, provided that the code official shall first find that one or more special individual reasons make the strict letter of this code impractical, and that the modification is in compliance with the intent and purpose of this code and that such modification does not lessen health, accessibility, life and fire safety, or structural requirements. The details of the written request for and action granting modifications shall be recorded and entered in the files of the department of building safety.
[A] 104.2.4.1 Flood hazard areas. For existing buildings located in flood hazard areas for which repairs, alterations and additions constitute substantial improvement, the code official shall not grant modifications to provisions related to flood resistance unless a determination is made that:
The applicant has presented good and sufficient cause that the unique characteristics of the size, configuration or topography of the site render compliance with the flood-resistant construction provisions inappropriate.
Failure to grant the modification would result in exceptional hardship.
The granting of the modification will not result in increased flood heights, additional threats to public safety or extraordinary public expense; create nuisances; cause fraud on or victimization of the public; or conflict with existing laws or ordinances.
The modification is the minimum necessary to afford relief, considering the flood hazard.
A written notice will be provided to the applicant specifying, if applicable, the difference between the design flood elevation and the elevation to which the building is to be built, stating that the cost of flood insurance will be
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
ADMINISTRATION
commensurate with the increased risk resulting from the reduced floor elevation and that construction below the design flood elevation increases risks to life and property.
[A] 104.3 Applications and permits. The code official shall receive applications, review construction documents, issue permits, inspect the premises for which such permits have been issued and enforce compliance with the provisions of this code.
[A] 104.3.1 Determination of substantially improved or substantially damaged existing buildings and structures in flood hazard areas. For applications for reconstruction, rehabilitation, repair, alteration, addition or other improvement of existing buildings or structures located in flood hazard areas, the code official shall determine where the proposed work constitutes substantial improvement or repair of substantial damage. Where the code official determines that the proposed work constitutes substantial improvement or repair of substantial damage, and where required by this code, the code official shall require the building to meet the requirements of Section 1612 of the California Building Code, or Section R306 of the California Residential Code, as applicable.
[A] 104.3.2 Preliminary meeting. When requested by the permit applicant or the code official, the code official shall meet with the permit applicant prior to the application for a construction permit to discuss plans for the proposed work or change of occupancy in order to establish the specific applicability of the provisions of this code.
Exception: Repairs and Level 1 alterations.
[A] 104.3.3 Building evaluation. The code official is authorized to require an existing building to be investigated and evaluated by a registered design professional based on the circumstances agreed on at the preliminary meeting. The design professional shall notify the code official if any potential noncompliance with the provisions of this code is identified.
[A] 104.4 Right of entry. Where it is necessary to make an inspection to enforce the provisions of this code, or where the code official has reasonable cause to believe that there exists in a structure or on any premises a condition that is contrary to or in violation of this code that makes the structure or premises unsafe, dangerous or hazardous, the code official is authorized to enter the structure or premises at all reasonable times to inspect or to perform the duties imposed by this code. If such structure or premises is occupied, the code official shall present credentials to the occupant and request entry. If such structure or premises is unoccupied, the code official shall first make a reasonable effort to locate the owner, the owner’s authorized agent or other person having charge or control of the structure or premises and request entry. If entry is refused, the code official shall have recourse to every remedy provided by law to secure entry.
resent credentials to the occupant and request entry. If such structure or premises is unoccupied, the code official shall first make a reasonable effort to locate the owner, the owner’s authorized agent or other person having charge or control of the structure or premises and request entry. If entry is refused, the code official shall have recourse to every remedy provided by law to secure entry.
[A] 104.4.1 Warrant. Where the code official has first obtained a proper inspection warrant or other remedy provided by law to secure entry, an owner, the owner’s authorized agent, occupant or person having charge, care or control of the structure or premises shall not fail or neglect, after a proper request is made as herein provided, to permit entry therein by the code official for the purposes of inspection and examination pursuant to this code.
[A] 104.5 Identification. The code official shall carry proper identification when inspecting structures or premises in the performance of duties under this code.
[A] 104.6 Notices and orders. The code official shall issue necessary notices or orders to ensure compliance with this code. Notices of violations shall be in accordance with Section 113.
[A] 104.7 Official records. The code official shall keep official records as required by Sections 104.7.1 through 104.7.5. Such official records shall be retained for not less than 5 years or for as long as the structure or activity to which such records relate remains in existence, unless otherwise provided by other regulations.
[A] 104.7.1 Approvals. A record of approvals shall be maintained by the code official and shall be available for public inspection during business hours in accordance with applicable laws.
[A] 104.7.2 Inspections. The code official shall keep a record of each inspection made, including notices and orders issued, showing the findings and disposition of each.
[A] 104.7.3 Code alternatives and modifications. Application for alternative materials, design and methods of construction and equipment in accordance with Section 104.2.3; modifications in accordance with Section 104.2.4; and documentation of the final decision of the code official for either shall be in writing and shall be retained in the official records.
[A] 104.7.4 Tests. The code official shall keep a record of tests conducted to comply with Sections 104.2.2.4 and 104.2.3.5.
[A] 104.7.5 Fees. The code official shall keep a record of fees collected and refunded in accordance with Section 108.
[A] 104.8 Liability. The code official, member of the Board of Appeals, officer or employee charged with the enforcement of this code, while acting for the jurisdiction in good faith and without malice in the discharge of the duties required by this code or other pertinent law or ordinance, shall not thereby be rendered personally liable, either civilly or criminally, and is hereby relieved from personal liability for any damage accruing to persons or property as a result of any act or by reason of an act or omission in the discharge of official duties.
isdiction in good faith and without malice in the discharge of the duties required by this code or other pertinent law or ordinance, shall not thereby be rendered personally liable, either civilly or criminally, and is hereby relieved from personal liability for any damage accruing to persons or property as a result of any act or by reason of an act or omission in the discharge of official duties.
[A] 104.8.1 Legal defense. Any suit or criminal complaint instituted against any officer or employee because of an act performed by that officer or employee in the lawful discharge of duties and under the provisions of this code or other laws or ordinances implemented through the enforcement of this code shall be defended by legal representatives of the jurisdiction until the final termination of the proceedings. The code official or any subordinate shall not be liable for cost in any action, suit or proceeding that is instituted in pursuance of the provisions of this code.
[A] 104.9 Approved materials and equipment. Materials, equipment and devices approved by the code official shall be constructed and installed in accordance with such approval.
1-24 2025 CALIFORNIA EXISTING BUILDING CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
ADMINISTRATION
[A] 104.9.1 Materials and equipment reuse. Materials, equipment and devices shall not be reused unless such elements are in good working condition and approved.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — 2025 California Existing Building Code (Title 24, Part 10)
-
▸ Chapter 1 — ADMINISTRATION
Overview- Section 1.1 — GENERAL
- Section 1.2 — BUILDING STANDARDS COMMISSION
- Section 1.3 — BOARD OF STATE AND COMMUNITY CORRECTIONS
- Section 1.4 — DEPARTMENT OF CONSUMER AFFAIRS
- Section 1.5 — CALIFORNIA ENERGY COMMISSION
- Section 1.6 — DEPARTMENT OF FOOD AND AGRICULTURE
- Section 1.7 — DEPARTMENT OF PUBLIC HEALTH
- Section 1.8 — DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT
- Section 1.8.2 — AUTHORITY AND ABBREVIATIONS
- Section 1.8.3 — LOCAL ENFORCING AGENCY
- Section 1.8.4 — PERMITS, FEES, APPLICATIONS AND INSPECTIONS
- Section 1.8.5 — RIGHT OF ENTRY FOR ENFORCEMENT
- Section 1.8.6 — LOCAL MODIFICATION BY ORDINANCE OR REGULATION
- Section 1.8.7 — ALTERNATE MATERIALS, DESIGNS, TESTS AND METHOD…
- Section 1.8.8 — APPEALS BOARD
- Section 1.8.9 — UNSAFE BUILDINGS OR STRUCTURES
- Section 1.8.10 — OTHER BUILDING REGULATIONS
- Section 1.9 — DIVISION OF THE STATE ARCHITECT
- Section 1.10 — DEPARTMENT OF HEALTH CARE ACCESS AND INFORMATIO…
- Section 1.11 — OFFICE OF THE STATE FIRE MARSHAL
- Section 1.12 — STATE LIBRARIAN
- Section 1.13 — DEPARTMENT OF WATER RESOURCES
- Section 1.14 — CALIFORNIA STATE LANDS COMMISSION
- Section 101 — SCOPE AND GENERAL REQUIREMENTS
- Section 102 — APPLICABILITY
- Section 103 — CODE COMPLIANCE AGENCY
- Section 104 — DUTIES AND POWERS OF CODE OFFICIAL
- Section 105 — PERMITS
- Section 106 — CONSTRUCTION DOCUMENTS
- Section 107 — TEMPORARY USES, EQUIPMENT AND SYSTEMS
- Section 108 — FEES
- Section 109 — INSPECTIONS
- Section 110 — CERTIFICATE OF OCCUPANCY
- Section 111 — SERVICE UTILITIES
- Section 112 — MEANS OF APPEALS
- Section 113 — VIOLATIONS
- Section 114 — STOP WORK ORDER
- Section 115 — UNSAFE STRUCTURES AND EQUIPMENT
- Section 116 — EMERGENCY MEASURES
- Section 117 — DEMOLITION
- Chapter 2 — DEFINITIONS
- Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS
- Chapter 3A — PROVISIONS FOR ALL COMPLIANCE METHODS
- Chapter 4 — REPAIRS
- Chapter 4A — REPAIRS
- Chapter 5 — PRESCRIPTIVE COMPLIANCE METHOD
- Chapter 5A — PRESCRIPTIVE COMPLIANCE METHOD
- Chapter 6 — CLASSIFICATION OF WORK
- Chapter 7 — ALTERATIONS—LEVEL 1
- Chapter 8 — ALTERATIONS—LEVEL 2
- Chapter 9 — ALTERATIONS—LEVEL 3
- Chapter 10 — CHANGE OF OCCUPANCY
- Chapter 11 — ADDITIONS
- Chapter 12 — HISTORIC BUILDINGS
- Chapter 13 — PERFORMANCE COMPLIANCE METHODS
- Chapter 14 — RELOCATED OR MOVED BUILDINGS
- Chapter 15 — CONSTRUCTION SAFEGUARDS
- Chapter 16 — REFERENCED STANDARDS
- Appendix A — GUIDELINES FOR THE SEISMIC RETROFIT OF EXISTING B…
- Appendix B — SUPPLEMENTARY ACCESSIBILITY REQUIREMENTS FOR EXIS…
- Appendix C — GUIDELINES FOR THE WIND RETROFIT OF EXISTING BUIL…
- Appendix D — BOARD OF APPEALS
- Appendix E — TEMPORARY EMERGENCY USES
- Appendix A — GUIDELINES ON FIRE RATINGS OF ARCHAIC MATERIALS A…