Skip to content

Title SDWD — San Dieguito Water District Administrative Code›Article 17 — METERS

Encinitas Municipal Code § 17.7 Change of Meter Size

Encinitas Municipal Code · 2026-10 edition · updated 2026-10-19 · Encinitas

Cite as: Encinitas Municipal Code § 17.7 · Text as of 2026-10-19

Section 17.7.1. Larger Meter.

Should a customer need a larger meter, the customer shall file an application with the District and pay for the larger service assembly and line, the difference in the cost of the larger meter from the smaller meter returned, installation charges, abandoning the smaller service, and additional capacity fees as applicable, as set forth in Appendix B (Engineering Fees).

Exceptions & meaning →

Section 17.7.2. Smaller Meter — Same Location.

Should a customer desire a smaller meter installed at the same location in exchange for a larger one, the customer shall file an application with the District and pay for the smaller meter and installation charges, as set forth in Appendix B (Engineering Fees).

Exceptions & meaning →

Section 17.7.3. Smaller Meter — New Location.

Should a customer desire a smaller meter at another location on the same parcel, the customer shall file and application with the District and pay the cost of installing a new service line and meter and the cost of removing the old service line, as set forth in Appendix B (Engineering Fees).

(Res. No. 2020-02, adopted 5/20/20)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Encinitas Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.