Skip to content

Chapter 17.52

Fort Bragg Zoning Code · 2026-07 edition · updated 2026-07-25 · Fort Bragg

Creek and Riparian Resource Protection

Sections:

17.52.010 Purpose

17.52.020 Applicability

17.52.030 Stream Channel Analysis

17.52.040 Limitation on Streambed Alteration

17.52.010 - Purpose

This Chapter provides standards for the protection of watercourse and riparian resources within the City, including provisions for retaining the watercourses as valuable natural, scenic, and recreational amenities as appropriate.

17.52.020 - Applicability

The provisions of this Chapter apply to the review of planning permits, including coastal development permits, for proposed development on any site within the City that is adjacent to riparian ESHA or crossed by a watercourse. This Chapter supplements the procedures and standards of Section 17.50.050 (Environmentally Sensitive Habitat Areas).

17.52.030 - Stream Channel Analysis

In addition to the biological report required by Section 17.50.050(B) (Environmentally Sensitive Habitat Areas), each planning permit application for a project that is subject to this Chapter shall include a site-specific stream channel analysis prepared by a hydrologist, civil engineer, or other qualified professional approved by the City to identify the precise boundary/top of bank of the watercourse. The Director may waive this requirement if it is determined that the project, because of its size, location, or design will have no impact on the watercourse, or that sufficient information already exists and further analysis is not necessary. A required stream channel analysis shall include all information and materials required by the Department. The “top of bank” shall mean the upper elevation of land, having a slope not exceeding 10 percent, which confines the channel waters flowing in the watercourse in their normal winter flow.

17.52.040 - Limitation on Streambed Alteration

Channelization, dams or other substantial alterations of rivers and streams shall incorporate the best mitigation measures feasible, and shall be limited to:

  • A. Water supply projects, provided that quantity and quality of water from streams shall be maintained at levels necessary to sustain functional capacity of streams, wetlands, estuaries and lakes.

B. Flood control projects, where such protection is necessary for public safety or to protect existing commercial or residential structures, when no feasible alternative to streambed alteration is available; and C. Developments where the primary function is the improvement of fish and wildlife habitat.

Streambed alterations shall not be conducted unless consistent with all applicable provisions of the Local Coastal Program and these regulations and if applicable, permit approval from the California Department of Fish and Game, the U.S. Army Corps of Engineers, and California State Water Resources Control Board.

17.52.050 - Development Standards

A. All development adjacent to riparian ESHA shall comply with the general development standards and ESHA buffer requirements of Sections 17.50.050 (D) and (H).

  • B. Removal or alteration of riparian ESHA. The removal, cutting or alteration of ESHA within a riparian habitat shall be prohibited except for:
  1. Vegetation removal authorized through coastal permit approval to accommodate permissible development;

  2. Removal of trees for disease control;

  3. Public safety purposes to abate a nuisance consistent with Coastal Act Section 30005; or

  4. Removal of firewood for the personal use of the property owner at his or her residence to the extent that such removal does not constitute development pursuant to Coastal Act Section 30106.

C. Bank stabilization. Where bank stabilization is approved consistent with the allowable use provisions of Sections 17.52.040 and 17.52.050, such stabilization shall comply with the following:

  1. Rehabilitation is the preferred method of stabilization, with the objective of maintaining the natural character of the watercourse and riparian area. Rehabilitation may include enlarging the channel at points of obstruction, clearing obstructions at points of constriction, limiting uses in areas of excessive erosion, and restoring riparian vegetation.

  2. Concrete channels and other mechanical stabilization measures shall not be allowed unless no other alternative exists.

  3. If bank stabilization requires other than rehabilitation or vegetative methods, hand-placed stone or rock rip-rap are the preferred methods.

D. Design of drainage improvements. Where daylighted drainage improvements are approved, they shall be placed in the least visible locations and naturalized through the use of river rock, earthtone concrete, and landscaping with native plant materials.

==> picture [9 x 9] intentionally omitted <==

Home Previous Next

Home Previous Next

==> picture [9 x 9] intentionally omitted <==

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Fort Bragg Zoning Code
Fort Bragg Zoning Code
  1. Article 1
  2. Article 2 — Zoning Districts & Allowable Land Uses
  3. Article 3 — Site Planning and Project Design Standards
  4. Article 4 — Standards for Specific Land Uses
  5. Article 5 — Resource Management
  6. Article 6 — Site Development Regulations
  7. Article 7 — Planning Permit Procedures
  8. Article 8 — Subdivision Regulations and Procedures
  9. Article 9 — Coastal Land Use and Development Code Administration
  10. Article 10 — Glossary & Index
  11. Chapter 17.10
  12. Chapter 17.12 — Interpretation of Code Provisions
  13. Chapter 17.14 — Zoning Map
  14. Chapter 17.20
  15. Chapter 17.21
  16. Chapter 17.22
  17. Chapter 17.24 — Industrial Zoning Districts
  18. Chapter 17.26 — Special Purpose Zoning Districts
  19. Chapter 17.30 — Standards for all Development and Land Uses
  20. Chapter 17.31
  21. Chapter 17.32 — Inclusionary Housing Requirements
  22. Chapter 17.34 — Landscaping Standards
  23. Chapter 17.36 — Parking and Loading
  24. Chapter 17.38 — Signs
  25. Chapter 17.40 — Adult-Oriented Business Regulations
  26. Chapter 17.42 — Standards for Specific Land Uses
  27. Chapter 17.44 — Telecommunications Facilities
  28. Chapter 17.50 — Land and Marine Resource Protection
  29. Chapter 17.52
  30. Chapter 17.54 — Hazards and Shoreline/Bluff Development
  31. Chapter 17.56 — Shoreline Access
  32. Chapter 17.58 — Wetland Protection and Restoration
  33. Chapter 17.60 — Grading Permit Requirements and Procedures
  34. Chapter 17.62
  35. Chapter 17.64 — Stormwater Runoff Pollution Control
  36. Chapter 17.70
  37. Chapter 17.71 — Permit Review and Decisions
  38. Chapter 17.72
  39. Chapter 17.74 — Historic Resource Protection
  40. Chapter 17.76
  41. Chapter 17.78 — Specific Plans
  42. Chapter 17.80 — Applicability and Administration of Subdivisio…
  43. Chapter 17.81 — Tentative Map Filing and Processing
  44. Chapter 17.82 — Parcel Maps and Final Maps
  45. Chapter 17.84 — Additional Subdivision Procedures
  46. Chapter 17.86 — Dedications and Exactions
  47. Chapter 17.88 — Subdivision Design and Improvement Requirements
  48. Chapter 17.90
  49. Chapter 17.92 — Appeals
  50. Chapter 17.94 — Local Coastal Program Amendments
  51. Chapter 17.95
  52. Chapter 17.96 — Public Hearings
  53. Chapter 17.98 — Enforcement and Penalties
  54. Chapter 17.100 — Definitions

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.