Title 17 — Unified Development Code›Article 5 — SUBDIVISION REGULATIONS AND RESIDENTIAL CONDOMINIUM CONVERSIONS
Indio Municipal Code Ch. 5.16 Improvement Security
Indio Municipal Code · 2026-10 edition · updated 2026-10-19 · Indio
Cite as: Indio Municipal Code Chapter 5.16 · Text as of 2026-10-19
§ 5.16.01. General Provision.¶
[Ord. No. 1834, 6-3-2026]
Any improvement agreement, contract or act required or authorized by the Subdivision Map Act or this Chapter for which security is required by the city, shall be secured in the manner provided for in the Subdivision Map Act.
§ 5.16.02. Securities to be Furnished and Amounts.¶
[Ord. No. 1834, 6-3-2026]
Faithful Performance.
A. A separate instrument in the amount of 100% of the estimated cost of construction and incidental costs, to guarantee the faithful performance of the agreement.
Labor and Material.
B. A separate instrument in the amount of 100% of the estimated cost of construction and incidental costs, to guarantee the payment of laborers and materialmen.
Monumenting.
C. A separate instrument in the amount of 100% of the total estimated cost of setting survey monuments, securing payment to the engineer or surveyor for the performance of the required act.
Maintenance Bond.
D. A separate instrument in the amount of 10% of the estimated cost of construction and incidental costs, for the guarantee and warranty of the work for a period of one year following the completion and acceptance thereof against any defective work or labor done, or defective materials furnished.
Securities Other Than Bonds.
E. If the improvement security is other than a bond, or bonds furnished by duly authorized corporate surety, an additional amount shall be included that is not less than 50% of the total estimated cost of the improvement or of the act to be performed. This additional amount is to cover the cost and reasonable expenses and fees, including reasonable attorney fees, which may be incurred by the city in successfully enforcing the obligation secured.
§ 5.16.03. Security Release.¶
[Ord. No. 1834, 6-3-2026]
The improvement security required hereunder shall be released in the manner which follows. Security given for faithful performance of an act or agreement and labor bonds for secure payment to the contractor, his subcontractors and to persons furnishing labor, materials or equipment shall be released upon final completion and acceptance of the act or work. The balance of the security shall be released upon the settlement of all such claims and obligations for which the security was given.
Security given to secure the payment of an engineer or surveyor for setting survey monuments shall be released upon receipt, by the City Engineer on written proof from the engineer or surveyor that he has set the monuments and that he has been paid for this work.
No security given for the guarantee for warranty of work shall be released until the expiration of the period thereof and the completion and acceptance of any repair, replacement or other work found to be needed during such warranty period.
§ 5.16.04. Security Reduction.¶
[Ord. No. 1834, 6-3-2026]
The City Manager, with the approval of the City Engineer, may reduce any improvement securities once at least 80% of the required improvements have been completed and no outstanding safety- or function-related items remain (e.g., the final asphalt concrete lift). Upon verification, the City Engineer may administratively approve the reduction, requiring the applicant to provide improvement security equal to 200% of the estimated cost of the remaining improvements.
Continue researching
Indio sources →Indio local, state and federal sources. Edit the document title or filters, then run your search.
Get a plain-English answer with a citation back to this text.
Ask AI about this code