§ 17.86.010. Purpose of Chapter.

This Chapter provides procedures for the preparation, filing, review, and approval or denial of applications for Lot Line Adjustment, in compliance with Government Code Section 66412(d) .

§ 17.86.020. Applicability.

The Lot Line Adjustment procedure shall be used for the purpose of relocating lot lines between four or fewer adjoining parcels, where land taken from one parcel is added to an adjacent parcel and where no more parcels are created than originally existed. A Lot Line Adjustment may result in fewer parcels than originally existed. A Lot Line Adjustment shall be processed in compliance with this Chapter. For the purposes of this Chapter, an "adjacent parcel" is one that directly touches at least one of the other parcels involved in the adjustment. (Ord. 723 §17, 2022)

§ 17.86.030. Adjustment Application and Processing.

A Lot Line Adjustment application shall be prepared, filed, and processed in compliance with this Section.

  • A. Application content. A Lot Line Adjustment application shall include all information and other materials required by the Lot Line Adjustment process guidelines provided by the Planning Department.

  • B. Processing. Lot Line Adjustment applications shall be submitted to the City Planner and shall be processed according to the procedures specified by Chapter 17.70 (Applications, Processing and Fees). An environmental assessment in compliance with Section 17.70.060 (Initial Application Review/Environmental Assessment) may be required or may be waived in compliance with Section 15305 of the CEQA Guidelines.

  • (Ord. 723 §18, 2022)

§ 17.86.040. Lot Line Adjustment Standards.

The parcels proposed in a Lot Line Adjustment shall be designed to conform with all applicable standards of Articles II (Zoning Districts and Allowable Land Uses) and III (Site Planning and General Development Standards); except that an adjustment involving existing nonconforming parcels and/or parcels with existing nonconforming development may be approved provided that:

  • A. The adjustment will not have the effect of creating a greater number of nonconforming parcels than existed before adjustment and will not cause a parcel that was nonconforming before the adjustment to become more nonconforming as a result of the adjustment, except where the review authority determines that the adjustment will substantially improve the conditions of the pre-adjustment parcel and development;

  • B. Any existing conforming development on a parcel will not become nonconforming as a result of the adjustment; and

  • C. Where existing development was nonconforming before the adjustment, the adjustment itself will not increase the nonconformity, except where the review authority determines that the adjustment will substantially improve the conditions of the pre-adjustment parcel and development.

§ 17.86.050. Approval or Denial of Adjustment.

  • A. Public hearing. A public hearing shall not be required for a Lot Line Adjustment.

  • B. Findings and decision. The City Council, may approve a Lot Line Adjustment, with or without conditions, only if all of the following findings can be made:

    1. The Lot Line Adjustment does not create a greater number of parcels than originally existed;

    2. The parcels resulting from the Lot Line Adjustment and development on those parcels conform to all applicable requirements of this Chapter, this Development Code, and Title 14 (Building and Construction) of the Municipal Code;

    3. Existing utilities, infrastructure, and easements, including but not limited to streets, driveways, sewer mains, water mains, and electrical lines, will not be adversely affected by the Lot Line Adjustment, or if utilities, infrastructure, or easements will be adversely affected, conditions have been applied to the approval of the Lot Line Adjustment to facilitate their relocation.

§ 17.86.060. Conditions of Approval.

In approving a Lot Line Adjustment, the City Council as applicable may impose specific development conditions as it finds are reasonable and necessary to ensure that the approval will be in compliance with the findings required by Section 17.86.050(B) (Approval or Denial of Adjustment Findings and Decision), and Government Code 66412(d).

(Ord. 723 §19, 2022)

§ 17.86.070. Completion of Adjustment.

Within 24 months after approval of a Lot Line Adjustment, the adjustment process shall be completed as set forth in this Section through the recordation of a deed or parcel map, after all conditions of approval have been satisfied.

  • A. Completion by deed.

    1. A Lot Line Adjustment shall not be considered legally completed until either a grant deed or a quit claim deed signed by the record owners has been recorded in compliance with this Section.

    2. The applicant shall submit deeds and a plat map to the City Engineer for review, approval, and signature in compliance with subsection B of this Section, before recordation of the grant deed or quit claim deed.

    3. The legal descriptions provided in the deeds shall be prepared by a qualified registered civil engineer, or a land surveyor licensed in California.

  • B. Review and approval by City Engineer. The City Engineer shall:

    1. Examine deeds to ensure all record title owners have consented to the adjustment;

    2. Examine deeds to ensure any deeds of trust or similar encumbrances will be modified to reflect new parcel descriptions;

    3. Verify all conditions of approval have been satisfactorily completed and deeds and exhibits are in substantial compliance with the Lot Line Adjustment approved by the review authority;

    4. When satisfied that deeds and exhibits comply with above requirements, provide an endorsed approval to the City Clerk; and

    5. After approval of legal descriptions and exhibits, assemble and return them to the City Clerk for recording.

  • C. Expiration. The approval of a Lot Line Adjustment, including a Lot Line Adjustment that was approved before the effective date of this Development Code, shall expire and become void if the adjustment has not been completed in compliance with this Section within 24 months of approval.

  • (Ord. 723 §20, 2022)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Jackson Zoning Code
Jackson Zoning Code
  1. Title 17 — Development Code
    Overview
    1. Article I — Development Code Enactment and Applicability
    2. Chapter 17.01 — PURPOSE AND EFFECT OF DEVELOPMENT CODE
    3. Chapter 17.02 — DEVELOPMENT AND LAND USE APPROVAL REQUIREMENTS
    4. Chapter 17.03 — INTERPRETATION OF CODE PROVISIONS
    5. Chapter 17.07 — RESIDENTIAL ZONING DISTRICTS
    6. Chapter 17.12 — COMMERCIAL, OFFICE, AND INDUSTRIAL ZONING DIST…
    7. Chapter 17.16 — SPECIAL PURPOSE ZONING DISTRICTS
    8. Chapter 17.20 — OVERLAY ZONING DISTRICTS
    9. Chapter 17.24 — ARCHITECTURAL REGULATIONS
    10. Chapter 17.28 — ELECTRIC VEHICLE CHARGING SYSTEMS—STREAMLINED …
    11. Chapter 17.30 — GENERAL PROPERTY DEVELOPMENT AND USE STANDARDS
    12. Chapter 17.32 — AFFORDABLE HOUSING
    13. Chapter 17.34 — FLOODPLAIN MANAGEMENT
    14. Chapter 17.38 — STREAM CORRIDOR DEVELOPMENT
    15. Chapter 17.40 — LANDSCAPE STANDARDS
    16. Chapter 17.43 — LIGHTING REGULATIONS
    17. Chapter 17.44 — NOISE
    18. Chapter 17.46 — OPEN SPACE/CLUSTER REQUIREMENTS
    19. Chapter 17.48 — PARKING AND LOADING STANDARDS
    20. Chapter 17.50 — PARKING DESIGN GUIDELINES
    21. Chapter 17.54 — SIGN REGULATIONS
    22. Chapter 17.58 — STANDARDS FOR SPECIFIC LAND USES
    23. Chapter 17.60 — SURFACE MINING AND RECLAMATION STANDARDS
    24. Chapter 17.62 — TEMPORARY USES AND EVENTS
    25. Chapter 17.64 — TRAILER PARKS
    26. Chapter 17.70 — APPLICATIONS, PROCESSING, AND FEES
    27. Chapter 17.72 — ZONING CLEARANCE
    28. Chapter 17.73 — SITE PLAN REVIEW
    29. Chapter 17.74 — DEVELOPMENT PERMITS
    30. Chapter 17.76 — USE PERMITS AND MINOR USE PERMITS
    31. Chapter 17.77 — HISTORIC DESIGN REVIEW
    32. Chapter 17.78 — PLANNED DEVELOPMENTS
    33. Chapter 17.80 — TEMPORARY USE PERMITS
    34. Chapter 17.82 — VARIANCES AND HISTORIC VARIANCES
    35. Chapter 17.83 — DEMOLITION REVIEW
    36. Chapter 17.84 — PERMIT IMPLEMENTATION, TIME LIMITS, AND EXTENS…
    37. Chapter 17.86 — LOT LINE ADJUSTMENTS
    38. Chapter 17.88 — VACATIONS
    39. Chapter 17.90 — SUBDIVISION MAP APPROVAL REQUIREMENTS
    40. Chapter 17.91 — RESOURCE CONSTRAINTS AND PRIORITY ALLOCATION
    41. Chapter 17.92 — SUBDIVISION DESIGN AND IMPROVEMENTS
    42. Chapter 17.94 — RESIDENTIAL DEVELOPMENT DESIGN GUIDELINES
    43. Chapter 17.96 — TENTATIVE MAP FILING AND PROCESSING
    44. Chapter 17.98 — PARCEL MAPS AND FINAL MAPS
    45. Chapter 17.100 — CONDOMINIUMS, CONDOMINIUM AND MOBILEHOME PARK…
    46. Chapter 17.102 — CERTIFICATES OF COMPLIANCE
    47. Chapter 17.104 — REVERSIONS TO ACREAGE
    48. Chapter 17.106 — DEDICATIONS, EXACTIONS, RESERVATIONS, EASEMENTS
    49. Chapter 17.108 — IMPROVEMENT PLANS AND AGREEMENTS
    50. Chapter 17.110 — SURVEYS AND MONUMENTS
    51. Chapter 17.120 — ADMINISTRATIVE RESPONSIBILITY
    52. Chapter 17.130 — NONCONFORMING USES, STRUCTURES, AND PARCELS
    53. Chapter 17.140 — APPEALS
    54. Chapter 17.150 — DEVELOPMENT AGREEMENTS
    55. Chapter 17.160 — GENERAL PLAN, LAND USE DESIGNATION MAP, AND D…
    56. Chapter 17.170 — SPECIFIC PLANS
    57. Chapter 17.174 — MASTER PLANS
    58. Chapter 17.180 — PUBLIC HEARINGS
    59. Chapter 17.190 — REVOCATIONS AND MODIFICATIONS
    60. Chapter 17.200 — ENFORCEMENT
    61. Chapter 17.220 — DEFINITIONS, GLOSSARY

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.