Chapter 10.100 — ZONING CLEARANCES

La Puente Zoning Code · 2026-06 edition · updated 2026-07-06 · La Puente

10.100.010 Purpose.

Zoning Clearance is the procedure used by the City to verify that a proposed land use or structure complies with the list of activities allowed in the applicable zone and the development standards applicable to the use or structure. (Ord. 935 § 3 (part), 2015)

10.100.020 Applicability.

Where Article 2 (Zones, Allowable Uses, and Development and Design Standards) or another provision of this Zoning Code requires a Zoning Clearance as a prerequisite to establishing a land use or structure, a Zoning Clearance shall be required at the time of the Director's review of any of the following:

A. Initiation of a Land Use. A Zoning Clearance shall be obtained before the initiation or commencement of any use of land not requiring the construction of a structure.

  • B. Change of Use.
  1. Whenever a use is proposed to be changed from a use for which a Zoning Clearance has been issued, whether or not the new use involves a new lessee, operator, or owner, a new Zoning Clearance shall be obtained.

  2. A Zoning Clearance shall also be required even if the lessee, operator, or owner of the previous use did not file for or receive a Zoning Clearance.

C. Change of Tenancy or Ownership. A new Zoning Clearance shall be obtained for a change of lessee, operator, or owner even when the change does not involve a change in the use being conducted on the subject property. The purpose of this provision is to ensure that the new lessee, operator, or owner is made aware of the Zoning Code requirements applicable to the subject use and any conditions of approval imposed on a discretionary permit authorizing the subject use.

D. Building Permit, Grading Permit, or Other Construction Permit. A Zoning Clearance shall be obtained before the City issues a new or modified Building Permit, Grading Permit, or other construction-related permit required for the alteration, construction, modification, moving, or reconstruction of any structure. (Ord. 935 § 3 (part), 2015)

10.100.030 Review Procedure.

A. Director’s Responsibility. The Director shall issue the Zoning Clearance after first determining that the request complies with all Zoning Code provisions applicable to the proposed use or structure.

B. Form of Approval. An approval may be in the form of a stamp, signature, or other official notation on approved plans, a letter to the applicant, or other certification, at the discretion of the Director. (Ord. 935 § 3 (part), 2015)

10.100.040 Post Decision Procedures.

The procedures and requirements in Chapter 10.102 (Permit Implementation, Time Limits, and Extensions), and those related to appeals and revocation in Article 7 (Zoning Code Administration) shall apply following the Director’s action on a Zoning Clearance. (Ord. 935 § 3 (part), 2015)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — La Puente Zoning Code
La Puente Zoning Code
  1. Chapter 10.02 — PURPOSE AND APPLICABILITY OF THE ZONING CODE
  2. Chapter 10.04 — INTERPRETATION OF THE ZONING CODE
  3. Chapter 10.12 — COMMERCIAL ZONES (C-1 AND C-2)
  4. Chapter 10.14 — COMMERCIAL-MANUFACTURING ZONE (CM)
  5. Chapter 10.16 — PUBLIC FACILITIES ZONE (PF)
  6. Chapter 10.24 — SITE PLANNING AND GENERAL DEVELOPMENT STANDARDS
  7. Chapter 10.26 — ACCESSORY STRUCTURES
  8. Chapter 10.28 — FENCES, HEDGES, AND WALLS
  9. Chapter 10.30 — Off-Street Parking and Loading
  10. Chapter 10.32 — LANDSCAPING
  11. Chapter 10.34 — SIGNS
  12. Chapter 10.36 — PROPERTY MAINTENANCE
  13. Chapter 10.38 — PERFORMANCE STANDARDS
  14. Chapter 10.40 — TRANSPORTATION DEMAND MANAGEMENT
  15. Chapter 10.42 — PROHIBITION OF MEDICAL MARIJUANA COOPERATIVES …
  16. Chapter 10.44 — MARIJUANA REGULATIONS
  17. Chapter 10.50 — STANDARDS FOR SPECIFIC LAND USES AND ACTIVITIES
  18. Chapter 10.60 — GENERAL NONCONFORMING PROVISIONS
  19. Chapter 10.62 — ADULT BUSINESSES
  20. Chapter 10.63 — NONCONFORMING PARCELS
  21. Chapter 10.64 — NONCONFORMING STRUCTURES
  22. Chapter 10.66 — NONCONFORMING USES
  23. Chapter 10.68 — NONCONFORMING SIGNS
  24. Chapter 10.72 — MISCELLANEOUS NONCONFORMING PROVISIONS
  25. Chapter 10.80 — GENERAL PROVISIONS
  26. Chapter 10.82 — PERMIT APPLICATION FILING AND PROCESSING
  27. Chapter 10.84 — CONDITIONAL USE PERMITS AND MINOR USE PERMITS
  28. Chapter 10.88 — PLANNED DEVELOPMENT PERMITS
  29. Chapter 10.90 — REASONABLE ACCOMMODATIONS
  30. Chapter 10.94 — SITE PLAN AND DESIGN REVIEW
  31. Chapter 10.96 — TEMPORARY USE PERMITS
  32. Chapter 10.98 — VARIANCES AND MINOR VARIANCES
  33. Chapter 10.100 — ZONING CLEARANCES
  34. Chapter 10.102 — PERMIT IMPLEMENTATION, TIME LIMITS, AND EXTEN…
  35. Chapter 10.110 — ADMINISTRATIVE RESPONSIBILITY
  36. Chapter 10.112 — AMENDMENTS (GENERAL PLAN, ZONING CODE, AND ZO…
  37. Chapter 10.114 — APPEALS
  38. Chapter 10.116 — PUBLIC NOTICES AND HEARINGS
  39. Chapter 10.118 — DEVELOPMENT AGREEMENTS
  40. Chapter 10.120 — SPECIFIC PLANS
  41. Chapter 10.122 — PERMIT REVOCATIONS AND MODIFICATIONS
  42. Chapter 10.132 — DEFINITIONS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.