Skip to content

Earlier editions: 2026-09

Title 14 — WATER AND SEWERS›Chapter 14.20 — STORM WATER CONTROL

Paso Robles Municipal Code Art. IV Construction Activities

Paso Robles Municipal Code · 2026-10 edition · updated 2026-10-04 · Paso Robles

Cite as: Paso Robles Municipal Code Article IV · Text as of 2026-10-04

14.20.220 - Compliance with the state general construction permit.

Every project that disturbs one-acre or more of soil or disturbs less than one-acre but is part of a larger common plan of development or sale is subject to the state construction general permit (CGP) and shall comply with all provisions of such permit. Proof of compliance with the CGP is required prior to obtaining a grading or building permit.

(Ord. No. 993 N.S. § 1, 7-2-2013)

Exceptions & meaning →

14.20.230 - Erosion and sediment control plan requirement.

Any project regardless of size shall develop and submit a site specific erosion and sediment control plan when applying for a grading or building permit. The plan must meet the requirements in the Section III(2.1) erosion and sediment control plan of the city's standard details and specifications, department of public works, engineering division. The director may require implementation of specific BMPs as part of the erosion and sediment control plan.

(Ord. No. 993 N.S. § 1, 7-2-2013)

Exceptions & meaning →

14.20.240 - Stop work orders.

In addition to any available remedies, the director may issue a stop work order for any construction activity that is creating a non-storm water discharge or any discharge in violation of this chapter.

(Ord. No. 993 N.S. § 1, 7-2-2013)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Paso Robles Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.