Chapter 25 — WATER, SEWERS AND SEWAGE DISPOSAL›Article II — SEWER SYSTEM GENERALLY›Division 1 — GENERALLY
Porterville Municipal Code § 25-34 Permit Required for Construction of Sewer or Connection to Sewer System
Porterville Municipal Code · 2026-10 edition · updated 2026-10-22 · Porterville
Cite as: Porterville Municipal Code § 25-34 · Text as of 2026-10-22
It shall be unlawful for any person to construct a sewer in a city street, alley or easement, or connect onto the sewer system of the city without first receiving a permit to do so and complying with the provisions of this article. (Ord. 680 § 1)
25-34.1: CONNECTION TO PUBLIC SEWER REQUIRED:¶
All new construction, including residential, commercial, and all other development within the city of Porterville shall be connected to a public sanitary sewer, unless the city council shall determine by resolution that a different method of sewage disposal shall be utilized. (Ord. 1039 § A, 6-5-1973)
Continue researching
Porterville sources →Porterville local, state and federal sources. Edit the document title or filters, then run your search.
Get a plain-English answer with a citation back to this text.
Ask AI about this code