17.110.010 – Purpose and Intent

The purpose of this Section is to provide two distinct procedures for reviewing land uses that may be appropriate in the applicable zone, but whose effects on a site and its surroundings cannot be determined without discretionary review and consideration of the site context. Use permits allow flexibility in providing for, regulating, or preventing particular uses so they will be compatible with existing or desired conditions in their neighborhoods or districts. Use permit approval is required for certain uses so that their detrimental effects can be reduced or avoided and potential conflicts in land use can be prevented.

Where the term Use Permit is used in this Chapter, it shall mean and encompass Minor Use Permit and Conditional Use Permit.

17.110.020 – Application Requirements

An application for a Minor Use Permit or Conditional Use Permit shall be filed and processed in compliance with Chapter 17.10 4XX (Permit Application Filing and Processing). It is the responsibility of the applicant to provide evidence in support of the findings required by Section17.110.07 0xx.xxx (Required Findings).

17.110.030 – Procedure – Minor Use Permit

A. Hearing, Decision, and Referral.

1. Before acting on any Minor Use Permit application, the Director shall hold a hearing at which information and arguments may be presented. Notice of the time, date, place, and purpose of the hearing shall be given in compliance with Chapter 17.12 2XX (Public Notices and Hearings).

2. Decisions of the Director shall be rendered in writing within 10 days of the final hearing at which action is taken. The decision shall state the conditions of approval, if any, or the reasons for denial. The Director’s decision shall be final unless appealed.

3. At his or her discretion, the Director may refer a Minor Use Permit to the Planning Commission when he/she determines the application involves a major policy issue or public controversy that would be resolved more suitably by the Planning Commission.

17.110.040 – Procedure – Conditional Use Permit

A. Hearing and Decision.

1. Before acting on any use permit application, the Planning \Commission shall hold a public hearing conducted according to its procedure. Notice of the time, date, place, and purpose of the hearing shall be given in compliance with Chapter 17.12 2XX (Public Notices and Hearings).

2. Decisions of the Planning Commission shall be rendered in writing within 10 days of the final hearing at which action is taken. The decision shall state the conditions of approval, if any, or the reasons for denial. The Planning Commission’s decision shall be final unless appealed.

3. When a Conditional Use Permit is before the Planning Commission, the Planning Commission may act to impose additional or relax any property development standards capable of being so altered under relevant

6- 24

CITY OF SAN LUIS OBISPO ZONING REGULATIONS – TITLE 17

sections of these regulations. (see Chapters 17.XX and 17.XX). The intent of this provision is to enable the Planning Commission to deal with various aspects of project design in a comprehensive way, without postponement of action on a project for separate hearings. Conditional Use Permit findings and procedures shall apply as provided in relevant sections of these regulations.

17.110.050 – Conditions of Approval

  • A. Conditions Allowed. Conditions imposed by the Director, Planning Commission, or Council may include, but are not limited to, the following:

    1. Modification or limitation to activities, including times and types of operations;

    2. Special yards or open spaces;

    3. Fences, walls, or landscape screens;

    4. Provision and arrangement of parking and vehicular and pedestrian circulation;

    5. On-site or off-site street, sidewalk or utility improvements, and maintenance agreements;

    6. Noise generation and attenuation;

    7. Dedication of right-of-way or easements or access rights;

    8. Arrangement of buildings and use areas on the site;

    9. Special hazard reduction measures, such as slope planting;

    10. Minimum site area;

    11. Other conditions which may be found necessary to address unusual site conditions;

    12. Establishment of an expiration date, after which the use must cease at that site;

    13. Recycling and solid waste plans.

  • B. Limitation. Conditions may not be imposed that restrict the use to a specific person or group.

17.110.060 – Criteria for Approval

In deciding whether a proposal is acceptable at a given location, the Director, Planning Commission, and Council shall consider whether the proposal could be established and maintained without jeopardy to persons or property within or adjacent to the proposed site and without damage to the resources of the site and its surroundings. Appropriate criteria may be found in the following sources, without limitation:

  • A. General Plan elements (such as land use, circulation, housing, noise, seismic safety, public safety, open space and conservation);

  • B. Specific Plans and special studies;

  • C. Community Design Guidelines;

6- 25

CITY OF SAN LUIS OBISPO ZONING REGULATIONS – TITLE 17

  • D. Compliance with applicable environmental mitigation measures; and

  • E. Standards and recommendations of agencies commenting on environmental documents for the proposal or for similar projects.

17.110.070 – Required Findings

  • A. In order to grant a Minor Use Permit or Conditional Use Permit, the Director or Planning Commission, or on appeal, the Council, shall be required to make the following findings:

    1. The proposed use is consistent with the General Plan and any applicable Specific Plan;

    2. The proposed use is allowed within the applicable zone and complies with all other applicable provisions of these Zoning Regulations and the Municipal Code;

    3. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity;

    4. The site is physically suitable in terms of:

    - **a.** Its design, location, shape, size, and operating characteristics of the proposed use; 
    
    - **b.** The provision of public and emergency vehicle (e.g., fire and medical) access; 
    
    - **c.** Public protection services (e.g., fire protection, police protection, etc.); and 
    
    - **d.** The provision of utilities (e.g., potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.). 
    

    5. The type, density, and intensity of use being proposed will not endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare, or be materially detrimental or injurious to the improvements, persons, property, or uses in the vicinity and zone in which the property is located.

  • B. The Director, Planning Commission, or Council may deny the proposal or attach conditions as deemed necessary to secure the purposes of these regulations. Actions on Minor Use Permits and Conditional Use Permits shall be justified by written findings, based on substantial evidence in view of the whole record.

17.110.080 – Requirement for and Compliance with Use Permits

  • A. The modification or addition to a use requiring Use Permit approval shall itself be subject to Use Permit approval. The addition of an allowed use to a premises occupied by a conditionally allowed use shall require Use Permit approval of the type required for the existing use. The Director shall determine when such an addition or change is of such a minor or incidental nature that the intent of these regulations can be met without further Use Permit control.

  • B. Any conditions established pursuant to these regulations shall be met before the use is established, except that the Director, Planning Commission or, on appeal, the Council, may establish a schedule for certain conditions to be met after establishment of the use. Continuance of the use shall then be contingent on complying with the schedule for meeting applicable conditions.

6- 26

CITY OF SAN LUIS OBISPO ZONING REGULATIONS – TITLE 17

17.110.090 – Permit to Run with the Land

A Minor Use Permit or Conditional Use Permit approved in compliance with the provisions of this Chapter shall run with the land and continue to be valid upon a change of ownership of the business, parcel, service, structure, or use that was the subject of the permit application in the same area, configuration, and manner as it was originally approved in compliance with this Chapter. If the operation of the use for which the Use Permit was issued ceases for a continuous period of one year, the provisions of this Section shall not apply, and a new application shall be required for any new owner or operator.

6- 27

CITY OF SAN LUIS OBISPO ZONING REGULATIONS – TITLE 17

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — San Luis Obispo Zoning Code
San Luis Obispo Zoning Code
  1. Title 17 — ZONING REGULATIONS CITY OF SAN LUIS OBISPO
    Overview
    1. Article 1 — ENACTMENT, APPLICABILITY, AND ENFORCEMENT
    2. Chapter 17.02 — PURPOSE AND APPLICABILITY OF THE ZONING REGULA…
    3. Chapter 17.04 — INTERPRETATION OF THE ZONING REGULATIONS
    4. Chapter 17.06 — ZONES ESTABLISHED AND ZONING MAP
    5. Chapter 17.12 — AGRICULTURAL (AG) ZONE
    6. Chapter 17.14 — CONSERVATION/OPEN SPACE (C/OS) ZONE
    7. Chapter 17.16 — LOW-DENSITY RESIDENTIAL (R-1) ZONE
    8. Chapter 17.18 — MEDIUM-DENSITY RESIDENTIAL (R-2) ZONE
    9. Chapter 17.20 — MEDIUM-HIGH DENSITY RESIDENTIAL (R-3) ZONE
    10. Chapter 17.22 — HIGH-DENSITY RESIDENTIAL (R-4) ZONE
    11. Chapter 17.24 — OFFICE (O) ZONE
    12. Chapter 17.26 — NEIGHBORHOOD COMMERCIAL (C-N) ZONE
    13. Chapter 17.28 — COMMUNITY COMMERCIAL (C-C) ZONE
    14. Chapter 17.30 — RETAIL COMMERCIAL (C-R) ZONE
    15. Chapter 17.32 — DOWNTOWN COMMERCIAL (C-D) ZONE
    16. Chapter 17.34 — TOURIST COMMERCIAL (C-T) ZONE
    17. Chapter 17.36 — SERVICE COMMERCIAL (C-S) ZONE
    18. Chapter 17.38 — RESERVED
    19. Chapter 17.40 — MANUFACTURING (M) ZONE
    20. Chapter 17.42 — BUSINESS PARK (BP) ZONE
    21. Chapter 17.44 — RESERVED
    22. Chapter 17.46 — PUBLIC FACILITY (PF) ZONE
    23. Chapter 17.48 — PLANNED DEVELOPMENT (PD) OVERLAY ZONE
    24. Chapter 17.50 — SPECIFIC PLAN (SP) OVERLAY ZONE
    25. Chapter 17.52 — SPECIAL FOCUS AREA (S-F) OVERLAY ZONE
    26. Chapter 17.54 — DOWNTOWN (D) OVERLAY ZONE
    27. Chapter 17.56 — HISTORICAL PRESERVATION (H) OVERLAY ZONE
    28. Chapter 17.58 — MIXED USE (MU) OVERLAY ZONE
    29. Chapter 17.60 — SPECIAL CONSIDERATION (S) OVERLAY ZONE
    30. Chapter 17.62 — RESERVED
    31. Chapter 17.64 — AIRPORT (AOZ) OVERLAY ZONE
    32. Chapter 17.66 — RESERVED
    33. Chapter 17.70 — SITE DEVELOPMENT AND GENERAL DEVELOPMENT STAND…
    34. Chapter 17.72 — ~~PARKING AND LOADINGP~~ ARKING AND LOADING
    35. Chapter 17.74 — PERFORMANCE STANDARDS
    36. Chapter 17.76 — PROPERTY MAINTENANCE STANDARDS
    37. Chapter 17.78 — FLOOD DAMAGE PREVENTION
    38. Chapter 17.80 — STREET REGULATIONS
    39. Chapter 17.90 — RESERVED
    40. Chapter 17.92 — NONCONFORMING STRUCTURES
    41. Chapter 17.94 — NONCONFORMING USES
    42. Chapter 17.96 — NONCONFORMING LOTS
    43. Chapter 17.104 — PERMIT APPLICATION FILING AND PROCESSING
    44. Chapter 17.106 — DEVELOPMENT REVIEW
    45. Chapter 17.108 — DIRECTOR’S ACTION
    46. Chapter 17.109 — DIRECTOR’S HEARING
    47. Chapter 17.110 — MINOR USE PERMITS AND CONDITIONAL USE PERMITS
    48. Chapter 17.112 — REASONABLE ACCOMMODATION
    49. Chapter 17.113 — TEMPORARY USE PERMITS
    50. Chapter 17.114 — VARIANCES
    51. Chapter 17.120 — ADMINISTRATIVE RESPONSIBILITY
    52. Chapter 17.122 — PUBLIC NOTICES AND HEARINGS
    53. Chapter 17.124 — AMENDMENTS - ZONING REGULATIONS AND ZONING MAP
    54. Chapter 17.126 — APPEALS
    55. Chapter 17.128 — DEVELOPMENT AGREEMENTS
    56. Chapter 17.130 — GENERAL PLAN AMENDMENTS
    57. Chapter 17.132 — ENFORCEMENT
    58. Chapter 17.138 — INCLUSIONARY HOUSING REQUIREMENTS
    59. Chapter 17.140 — AFFORDABLE HOUSING INCENTIVES
    60. Chapter 17.142 — DOWNTOWN HOUSING CONVERSION REGULATIONS
    61. Chapter 17.144 — RESIDENTIAL GROWTH MANAGEMENT REGULATIONS
    62. Chapter 17.146 — RESIDENTIAL OCCUPANCY STANDARDS
    63. Chapter 17.148 — HIGH-OCCUPANCY RESIDENTIAL USE REGULATIONS
    64. Chapter 17.154 — DEFINITIONS PURPOSE AND ORGANIZATION 17.154.0…
    65. Chapter 17.158 — GENERAL DEFINITIONS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.