§ 20.560.010. Purpose. ¶
Zoning Clearance is the procedure used by the City to verify that a proposed land use or structure complies with the list of activities allowed in the applicable zone and the development standards applicable to the use or structure.
(Ord. 1017, 2013)
§ 20.560.020. Applicability. ¶
Where Article 2 (Zones, Allowed Land Uses, and Zone-Specific Standards) or another provision of this Zoning Code requires a Zoning Clearance as a prerequisite to establishing a land use or structure, a Zoning Clearance shall be required at the time of the Director's review of any of the following:
A. Initiation of a land use. A Zoning Clearance shall be obtained before the initiation or commencement of any use of land not requiring the construction of a structure.
B. Change of land use.
Whenever a use is proposed to be changed from a use for which a Zoning Clearance has been issued, whether or not the new use involves a new lessee, operator, or owner, a new Zoning Clearance shall be obtained.
A Zoning Clearance shall also be required even if the lessee, operator, or owner of the previous use did not file for or receive a Zoning Clearance.
C. Building Permit, Grading Permit or other construction permit.
A Zoning Clearance shall be obtained before the City issues a new or modified Building Permit, Grading Permit, or other construction-related permit required for the alteration, construction, modification, moving, or reconstruction of any structure.
Before a Building Permit may be issued for any structure in a development requiring Site Plan and Design Review in compliance with Chapter 20.530 (Site Plan and Design Review), the Building Inspector shall determine that the proposed structure is in compliance with the approved plan.
D. New paving or impervious surfaces not requiring a construction permit. A Zoning Clearance shall be obtained before installing asphalt, concrete, artificial turf, or other paving flatwork on the ground that would affect the impervious surface coverage or structure coverage standards specified in Table 2-3 (Development Standards for Residential Zones) or the limitations on paving in the front and side setback area specified in Section 20.320.080 (Parking Standards for Residential Zones).
E. Business License. A Zoning Clearance shall be obtained before the City issues a new or modified Business License in compliance with Municipal Code Chapter 5.04 (Licenses). Whenever there is a change of use, or a substantial building alteration, a portion of the fee paid for business license application shall be allocated for inspection to determine whether an occupancy permit shall be granted.
(Ord. 1017, 2013)
§ 20.560.030. Review Procedure. ¶
A. Director's responsibility. The Director shall determine that the proposed land use or structure complies with all applicable Zoning Code provisions before issuing a Zoning Clearance.
B. Investigation for Compliance (IFC) process. In addition, the following procedure shall apply to existing and prospective businesses seeking to obtain a business license and certificate of occupancy:
The Director shall conduct an Investigation for Compliance (IFC) to verify that the existing and prospective businesses comply with health, building, safety, and air quality standards.
The IFC application shall include the information and materials specified in the Department handout for IFC applications, and payment of the required fee in compliance with the Planning Fee Schedule.
The Director or his/her designee shall approve each Investigation for Compliance.
The IFC application shall be processed before occupancy of any building for business purposes and before application for a business license.
An IFC shall only be approved if the Director can make all of the following findings:
a. The proposed use complies with this Zoning Code;
b. The proposed use complies with other applicable City codes, including building and safety codes.
C. Form of approval. A Zoning Clearance approval, including the approval of the Investigation for Compliance, may be in the form of a stamp, signature, or other official notation on approved plans, a letter to the applicant, or other certification, at the Director's discretion. The approval shall reference this Chapter.
(Ord. 1017, 2013)
§ 20.560.040. Post-Decision Procedures. ¶
The procedures and requirements in Chapter 20.565 (Permit Implementation, Time Limits, and Extensions), and those related to Chapter 20.615 (Appeals) and Chapter 20.630 (Modifications and/or Revocations) shall apply following the Director's action on a Zoning Clearance. (Ord. 1017, 2013)
Chapter 20.565. IMPLEMENTATION, TIME LIMITS, AND EXTENSIONS
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Stanton Zoning Code
-
▸ Title 20 — Zoning
Overview- Chapter 20.100 — PURPOSE AND EFFECT OF ZONING CODE
- Chapter 20.105 — INTERPRETATION OF REGULATIONS
- Chapter 20.200 — ESTABLISHMENT AND DESIGNATION OF ZONES
- Chapter 20.205 — GENERAL PERMIT REQUIREMENTS
- Chapter 20.210 — RESIDENTIAL ZONES
- Chapter 20.211 — STATE-MANDATED RESIDENTIAL PROJECTS
- Chapter 20.215 — COMMERCIAL ZONES
- Chapter 20.220 — INDUSTRIAL ZONES
- Chapter 20.225 — SPECIAL PURPOSE ZONES
- Chapter 20.230 — MIXED-USE OVERLAY ZONES
- Chapter 20.240 — SHORT-TERM RENTALS
- Chapter 20.300 — PERFORMANCE STANDARDS
- Chapter 20.305 — GENERAL DEVELOPMENT AND SITE PLANNING STANDARDS
- Chapter 20.310 — FENCES, WALLS, AND HEDGES
- Chapter 20.315 — LANDSCAPING STANDARDS
- Chapter 20.320 — OFF-STREET PARKING AND LOADING STANDARDS
- Chapter 20.325 — SIGN STANDARDS
- Chapter 20.330 — AFFORDABLE HOUSING - DENSITY BONUSES
- Chapter 20.335 — TRANSPORTATION DEMAND MANAGEMENT
- Chapter 20.400 — STANDARDS FOR SPECIFIC LAND USES
- Chapter 20.410 — ACCESSORY STRUCTURES AND USES
- Chapter 20.420 — MULTI-FAMILY DEVELOPMENT
- Chapter 20.430 — RECYCLING FACILITIES
- Chapter 20.435 — DONATION COLLECTION BOXES
- Chapter 20.440 — VEHICLE SALES, SERVICES, AND REPAIR
- Chapter 20.450 — WIRELESS COMMUNICATIONS FACILITIES (WCFs)
- Chapter 20.455 — WIRELESS FACILITIES IN PUBLIC RIGHT-OFWAY
- Chapter 20.460 — ADULT-ORIENTED BUSINESSES
- Chapter 20.500 — APPLICATION FILING AND PROCESSING
- Chapter 20.505 — CONDOMINIUM CONVERSIONS
- Chapter 20.510 — DEVELOPMENT AGREEMENTS
- Chapter 20.515 — HOME OCCUPATION PERMITS
- Chapter 20.520 — PLANNED DEVELOPMENT PERMITS
- Chapter 20.525 — REASONABLE ACCOMMODATION
- Chapter 20.530 — SITE PLAN AND DESIGN REVIEW
- Chapter 20.535 — SPECIFIC PLANS
- Chapter 20.540 — TEMPORARY USE PERMITS, ANNUAL ADVERTISING PER…
- Chapter 20.545 — TRANSFER OF DEVELOPMENT RIGHTS
- Chapter 20.550 — USE PERMITS - MINOR AND CONDITIONAL
- Chapter 20.555 — VARIANCES AND MINOR VARIANCES
- Chapter 20.600 — ADMINISTRATIVE RESPONSIBILITY
- Chapter 20.610 — AMENDMENTS (GENERAL PLAN AND ZONING CODE/MAP)
- Chapter 20.615 — APPEALS
- Chapter 20.620 — NONCONFORMITIES
- Chapter 20.625 — PUBLIC HEARINGS
- Chapter 20.630 — PERMIT MODIFICATIONS AND REVOCATIONS
- Chapter 20.635 — ENFORCEMENT
- Chapter 20.700 — DEFINITIONS
- Chapter 20.710 — SUPPLEMENTAL DEFINITIONS