A development permit shall be obtained before any construction or other development begins within any area of special flood hazard established in Section 14.18.030.020. Application for a development permit shall be made on forms furnished by the Floodplain Administrator and may include, but not be limited to: plans in duplicate drawn to scale showing the nature, location, dimensions, and elevation of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoing. Specifically, the following information is required.

A.

Site plan, including but not limited to:

For all proposed structures, spot ground elevations at building corners and 20-foot or smaller intervals along the foundation footprint, or one-foot contour elevations throughout the building site;

Proposed locations of water supply, sanitary sewer, and utilities;

3.

If available, the base flood elevation from the Flood Insurance Study and/or Flood Insurance Rate Map; and 4.

If applicable, the location of the regulatory floodway; and

B.

Foundation design detail, including but not limited to:

1.

Proposed elevation in relation to mean sea level, of the lowest floor (including basement) of all structures; 2.

For a crawlspace foundation, location and total net area of foundation openings as required in Section 14.18.050.010.C.3 and FEMA Technical Bulletins 1-93 and 7-93; and

3.

For foundations placed on fill, the location and height of fill, and compaction requirements (compacted to 95 percent using the standard proctor test method); and

C.

Proposed elevation in relation to mean sea level to which any nonresidential structure will be floodproofed, as required in Section 14.18.050.010.C.2 and FEMA Technical Bulletin TB 3-93;

D.

All appropriate certifications listed in Section 14.18.040.040.D; and

E.

Description of the extent to which any watercourse will be altered or relocated as a result of proposed development.

(Ord. 1972, Repealed and Replaced, 02/22/2022)

The City Engineer is hereby appointed to administer, implement, and enforce this division by granting or denying development permits in accord with its provisions.

(Ord. 1972, Repealed and Replaced, 02/22/2022)

The duties and responsibilities of the Floodplain Administrator shall include but not be limited to the following:

A.

Permit Review. Review all development permits to determine that:

1.

Permit requirements of this division have been satisfied;

2.

All other required state and federal permits have been obtained;

3.

The site is reasonably safe from flooding; and

4.

The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. For purposes of this division, "adversely affects" means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will increase the water surface elevation of the base flood more than one foot at any point.

B.

Review, Use, and Development of Other Base Flood Data.

When base flood elevation data has not been provided in accordance with Section 14.18.030.020, the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal or state agency, or other source, in order to administer Chapter 14.18.050 of this code. Any such information shall be submitted to the City Council for adoption; or

2.

If no base flood elevation data is available from a federal or state agency or other source, then a base flood elevation shall be obtained using one of two methods from the FEMA publication "Managing Floodplain Development in Approximate Zone A Areas – A Guide for Obtaining and Developing Base (100-Year) Flood Elevations," dated July 1995, in order to administer Chapter 14.18.050 of this code:

a.

Simplified Method.

i.

One-hundred-year or base flood discharge shall be obtained using the appropriate regression equation found in a U.S. Geological Survey publication, or the discharge-drainage area method; and ii.

Base flood elevation shall be obtained using the Quick-2 computer program developed by FEMA; b.

Detailed Method.

i.

One-hundred-year or base flood discharge shall be obtained using the U.S. Army Corps of Engineers' HECHMS computer program; and

ii.

Base flood elevation shall be obtained using the U.S. Army Corps of Engineers' HEC-RAS computer program.

C.

Notification of Other Agencies.

1.

Alteration or Relocation of a Watercourse.

a.

Notify adjacent communities and the California Department of Water Resources prior to alteration or relocation;

b.

Submit evidence of such notification to the Federal Insurance Administration, Federal Emergency Management Agency; and

c.

Assure that the flood-carrying capacity within the altered or relocated portion of said watercourse is maintained.

2.

Base Flood Elevation Changes Due to Physical Alterations.

a.

Within six months of information becoming available or project completion, whichever comes first, the Floodplain Administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a letter of map revision (LOMR).

b.

All LOMRs for flood control projects are approved prior to the issuance of building permits. Building permits shall not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition.

c.

Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data. 3.

Changes in Corporate Boundaries. Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits.

D.

Documentation of Floodplain Development. Obtain and maintain for public inspection and make available, as needed, the following:

1.

Certification required by Sections 14.18.050.010.C.1 and 14.18.050.040;

2.

Certification required by Section 14.18.050.010.C.2;

  1. Certification required by Section 14.18.050.010.C.3;

4.

Certification of elevation required by Section 14.18.050.030.B; and

5.

Certification required by Section 14.18.050.060.A.

E.

Map Determinations. Make interpretations where needed as to the exact location of the boundaries of the areas of special flood hazard. Where there appears to be a conflict between a mapped boundary and actual field conditions, grade and base flood elevations shall be used to determine the boundaries of the special flood hazard area. The person contesting the location of the boundary shall be given a reasonable

opportunity to appeal the interpretation as provided in Chapter 14.18.060 of this code.

F.

Remedial Action. Take action to remedy violations of this division as specified in Section 14.18.030.050.

(Ord. 1972, Repealed and Replaced, 02/22/2022)

The City Council of the City shall hear and decide appeals when it is alleged there is an error in any requirement, decision, or determination made by the Floodplain Administrator in the enforcement or administration of this division.

(Ord. 1972, Repealed and Replaced, 02/22/2022)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Vacaville Zoning Code
Vacaville Zoning Code
  1. Chapter 14.01.010 — GENERAL PROVISIONS (§ 14.01.010.010 – § 14…
  2. Chapter 14.01.020 — APPLICABILITY (§ 14.01.020.010)
  3. Chapter 14.01.030 — AUTHORITY (§ 14.01.030.010 – § 14.01.030.0…
  4. Chapter 14.01.040 — ENFORCEMENT (§ 14.01.040.010 – § 14.01.040…
  5. Chapter 14.02.010 — GENERAL PROVISIONS (§ 14.02.010.010 – § 14…
  6. Chapter 14.02.020 — RULES OF INTERPRETATION (§ 14.02.020.010 –…
  7. Chapter 14.02.030 — RULES OF MEASUREMENT (§ 14.02.030.010 – § …
  8. Chapter 14.02.040 — OFFICERS, MANAGERS, AND ENTITIES (§ 14.02.…
  9. Chapter 14.02.050 — DEFINITIONS (§ 14.02.050.010 – § 14.02.050…
  10. Chapter 14.02.060 — USE CLASSIFICATIONS (§ 14.02.060.010 – §
  11. Chapter 14.03.020 — ADMINISTRATION AND GENERAL PROVISIONS (§ 1…
  12. Chapter 14.03.021 — EXEMPTIONS (§ 14.03.021.010 – § 14.03.021.…
  13. Chapter 14.03.022 — ENVIRONMENTAL DETERMINATION (§ 14.03.022.0…
  14. Chapter 14.03.023 — ENVIRONMENTAL DOCUMENTS, NEGATIVE DECLARAT…
  15. Chapter 14.03.024 — ENVIRONMENTAL DOCUMENTS, ENVIRONMENTAL IMP…
  16. Chapter 14.03.025 — ENVIRONMENTAL DOCUMENTS, REAFFIRMATIONS (§…
  17. Chapter 14.03.026 — ENVIRONMENTAL DOCUMENTS, MITIGATION FACTOR…
  18. Chapter 14.04.010 — GENERAL PROVISIONS (§ 14.04.010.010 – § 14…
  19. Chapter 14.04.020 — APPLICATION PROCESS (§ 14.04.020.010 – § 1…
  20. Chapter 14.04.040 — URBAN RESERVE (§ 14.04.040.010 – § 14.04.0…
  21. Chapter 14.05.010 — GENERAL PROVISIONS (§ 14.05.010.010 – § 14…
  22. Chapter 14.05.020 — PROCESS OF NEW RESIDENTIAL DEVELOPMENT PRO…
  23. Chapter 14.05.030 — PROCEDURES FOR THE ANNUAL ALLOCATION OF RE…
  24. Chapter 14.05.040 — ANNUAL REVIEW OF INFRASTRUCTURE, FACILITIE…
  25. Chapter 14.11.010 — GENERAL PROVISIONS (§ 14.11.010.010 – § 14…
  26. Chapter 14.11.020 — TENTATIVE SUBDIVISION MAPS (§ 14.11.020.01…
  27. Chapter 14.11.030 — FINAL MAPS (§ 14.11.030.010 – § 14.11.030.…
  28. Chapter 14.11.040 — TENTATIVE PARCEL MAPS (§ 14.11.040.010 – §…
  29. Chapter 14.11.050 — PARCEL MAPS (§ 14.11.050.010 – § 14.11.050…
  30. Chapter 14.11.060 — WAIVER OF PARCEL MAP (§ 14.11.060.010 – § …
  31. Chapter 14.11.070 — VESTING MAPS, APPLICATION AND REVIEW PROCE…
  32. Chapter 14.11.080 — COMMON INTEREST DEVELOPMENT, CONDOMINIUM C…
  33. Chapter 14.11.090 — AMENDMENT TO RECORDED MAPS (§ 14.11.090.01…
  34. Chapter 14.11.100 — LOT LINE ADJUSTMENTS (§ 14.11.100.010 – § …
  35. Chapter 14.11.110 — REVERSION TO ACREAGE (§ 14.11.110.010 – § …
  36. Chapter 14.11.120 — PARCEL MERGERS (§ 14.11.120.010 – §
  37. Chapter 14.12.010 — GENERAL PROVISIONS (§ 14.12.010.010 – § 14…
  38. Chapter 14.12.020 — PLAN LINES (§ 14.12.020.010 – § 14.12.020.…
  39. Chapter 14.12.030 — STANDARD DEDICATIONS (§ 14.12.030.010 – § …
  40. Chapter 14.12.040 — STANDARD IMPROVEMENTS (§ 14.12.040.010 – §…
  41. Chapter 14.12.050 — UNDERGROUNDING OF UTILITIES (§ 14.12.050.0…
  42. Chapter 14.12.060 — MAINTENANCE OF PUBLIC PARKS AND LANDSCAPIN…
  43. Chapter 14.13.180 — GENERAL PROVISIONS (§ 14.13.180.010 – § 14…
  44. Chapter 14.13.180 — GENERAL PROVISIONS
  45. Chapter 14.14.186 — GENERAL PROVISIONS (§ 14.14.186.010 – § 14…
  46. Chapter 14.14.186 — GENERAL PROVISIONS
  47. Chapter 14.14.188 — SCHOOL FACILITIES IMPACT MITIGATION PLAN
  48. Chapter 14.14.188 — SCHOOL FACILITIES IMPACT MITIGATION PLAN (…
  49. Chapter 14.14.186 — GENERAL PROVISIONS
  50. Chapter 14.14.188 — SCHOOL FACILITIES IMPACT MITIGATION PLAN
  51. Chapter 14.15.010 — GENERAL PROVISIONS (§ 14.15.010.010 – § 14…
  52. Chapter 14.15.020 — FORMATION PROCEDURES (§ 14.15.020.010 – § …
  53. Chapter 14.15.040 — ADMINISTRATION (§ 14.15.040.010 – § 14.15.…
  54. Chapter 14.17.010 — GENERAL PROVISIONS (§ 14.17.010.010 – § 14…
  55. Chapter 14.17.020 — APPLICATION PROCESS (§ 14.17.020.010 – § 1…
  56. Chapter 14.17.030 — APPROVAL PROCESS (§ 14.17.030.010 – § 14.1…
  57. Chapter 14.17.040 — EXECUTION, RECORDATION, AND EFFECT OF DEVE…
  58. Chapter 14.18.020 — DEFINITIONS (§ 14.18.020.010)
  59. Chapter 14.18.030 — GENERAL PROVISIONS (§ 14.18.030.010 – § 14…
  60. Chapter 14.18.040 — ADMINISTRATION (§ 14.18.040.010 – § 14.18.…
  61. Chapter 14.18.050 — PROVISIONS FOR FLOOD HAZARD REDUCTION (§ 1…
  62. Chapter 14.18.060 — VARIANCE PROCEDURE (§ 14.18.060.010 – § 14…
  63. Chapter 14.19.240 — ADMINISTRATION (§ 14.19.240.010 – §
  64. Chapter 14.19.242 — PERMIT AND PROCEDURES (§ 14.19.242.010 – §…
  65. Chapter 14.19.244 — STANDARDS (§ 14.19.244.010)
  66. Chapter 14.25.010 — GENERAL PROVISIONS
  67. Chapter 14.26.010 — GENERAL PROVISIONS (§ 14.26.010.010 – § 14…
  68. Chapter 14.26.020 — DISCHARGE PROHIBITIONS (§ 14.26.020.010 – …
  69. Chapter 14.26.030 — REGULATIONS AND REQUIREMENTS (§ 14.26.030.…
  70. Chapter 14.26.050 — ENFORCEMENT (§ 14.26.050.010 – § 14.26.050…
  71. Chapter 14.27.010 — TITLE, PURPOSE, APPLICABILITY (§ 14.27.010…
  72. Chapter 14.27.020 — DEFINITIONS (§ 14.27.020.010)
  73. Chapter 14.27.030 — PROVISIONS FOR NEW CONSTRUCTION OR
  74. Chapter 14.27.040 — PROVISIONS FOR EXISTING LANDSCAPES (§ 14.2…
  75. Chapter 14.27.050 — EFFECTIVE PRECIPITATION (§ 14.27.050.010)
  76. Chapter 14.27.060 — REPORTING (§ 14.27.060.010)
  77. Chapter 14.27.070 — PRESCRIPTIVE COMPLIANCE OPTION (§ 14.27.07…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.