Skip to content

Chapter 9.94 — DEDICATION AND EXACTIONS

Yucca Valley Zoning Code · 2026-06 edition · updated 2026-07-25 · Yucca Valley

9.94.010: PURPOSE AND APPLICABILITY:

This chapter establishes standards for subdivider dedications of land or payment of fees, in conjunction with subdivision approval. (Ord. 242, 9-3-2013)

9.94.020: APPLICABILITY:

Each proposed subdivision shall comply with the requirements of this chapter for dedications, reservations, or the payment of fees. (Ord. 242, 9-3-2013)

9.94.030: DEDICATIONS:

  • A. Streets, Highways, And Flood Control Rights Of Way:
  1. As a condition of approval of a map, the subdivider shall dedicate or make an irrevocable offer of dedication of all parcels of land within the subdivision that are needed for:
  • a. Access rights and abutters' rights;

  • b. Alleys;

  • c. Drainage easements;

  • d. Public utility easements;

  • e. Streets;

  • f. Trails;

  • g. Avigation; and

  • h. Other public easements.

  1. In addition, the subdivider shall improve or agree to improve all streets, alleys, including access rights and abutters' rights, drainage, public utility easements and other public easements. The subdivider may also be required to dedicate the additional land as may be necessary and feasible to provide bicycle paths for the use and safety of residents of the subdivision.

B. Drainage Rights Of Way: When the director determines that drainage rights of way are necessary, the subdivider shall offer to dedicate upon the final map of the subdivision the necessary rights of way for drainage facilities.

C. Flood Control Dedication: Where dedication is offered for flood control rights of way, the rights of way shall be shown as parcels lettered alphabetically on the final map. The offer of dedication shall be made by an appropriate certificate on the title sheet of the final map, and, in addition, an executed deed conveying fee title to the right of way to the town shall be delivered to the town. (Ord. 242, 9-3-2013)

9.94.040: ACCEPTANCE OF DEDICATIONS:

A. Certification Of Town Council Action: At the time the council approves a final map, it shall also accept, subject to improvement, or reject any offer of dedication. The town clerk shall certify on the map the action of the council.

B. Resolution Of Acceptance: The town clerk shall cause a resolution of acceptance of dedications by the council to be filed with the county recorder.

C. Deferred Acceptance: If, at the time the final map is approved, any streets, alleys, paths, public utility easements, rights of way for local transit facilities including bus turnouts, benches, shelters, landing pads, and similar

items that directly benefit the residents of a subdivision, or storm drainage easements are rejected subject to Code Of Civil Procedure section 771.010, the offer of dedication shall remain open and the council may by resolution at any later date, and without further action by the subdivider, rescind its action and accept and open the streets, alleys, paths, rights of way for local transit facilities including bus turnouts, benches, shelters, landing pads, and similar items that directly benefit the residents of a subdivision, or storm drainage easements for public use. The acceptance shall be recorded in the office of the county recorder. (Ord. 242, 9-3-2013)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Yucca Valley Zoning Code
Yucca Valley Zoning Code
  1. Chapter 9.01 — PURPOSE AND APPLICABILITY
  2. Chapter 9.02 — GENERAL PROVISIONS
  3. Chapter 9.03 — NONCONFORMING LOTS, STRUCTURES, AND USES
  4. Chapter 9.05 — ZONING DISTRICTS AND ZONING MAP
  5. Chapter 9.06 — LAND USE STANDARDS AND PERMIT REQUIREMENTS
  6. Chapter 9.07 — RESIDENTIAL AND HILLSIDE RESERVE DISTRICTS
  7. Chapter 9.09 — COMMERCIAL DISTRICTS
  8. Chapter 9.10 — INDUSTRIAL DISTRICTS
  9. Chapter 9.12 — PUBLIC/QUASI-PUBLIC AND OPEN SPACE DISTRICTS
  10. Chapter 9.13 — SPECIFIC PLAN DISTRICTS
  11. Chapter 9.14 — STANDARDS AND REGULATIONS FOR SPECIFIC USES IN …
  12. Chapter 9.15 — OVERLAY DISTRICTS
  13. Chapter 9.16 — AIRPORT SAFETY OVERLAY DISTRICT
  14. Chapter 9.17 — FIRE SAFETY OVERLAY DISTRICT
  15. Chapter 9.18 — FLOODPLAIN SAFETY OVERLAY DISTRICT
  16. Chapter 9.19 — GEOLOGIC AND SEISMIC HAZARDS OVERLAY DISTRICT
  17. Chapter 9.20 — HILLSIDE OVERLAY DISTRICT
  18. Chapter 9.21 — LARGE ANIMAL OVERLAY DISTRICT
  19. Chapter 9.22 — SPECIFIC PLAN OVERLAY DISTRICT
  20. Chapter 9.23 — SENIOR MOBILEHOME PARK OVERLAY DISTRICT
  21. Chapter 9.30 — DEDICATIONS AND INFRASTRUCTURE IMPROVEMENTS
  22. Chapter 9.31 — GENERAL DEVELOPMENT STANDARDS
  23. Chapter 9.32 — LANDSCAPING AND WATER CONSERVATION
  24. Chapter 9.33 — PARKING AND LOADING REGULATIONS
  25. Chapter 9.34 — PERFORMANCE STANDARDS
  26. Chapter 9.35 — PROPERTY MAINTENANCE STANDARDS
  27. Chapter 9.37 — SOIL EROSION AND DUST CONTROL
  28. Chapter 9.38 — TEMPORARY SPECIAL EVENTS
  29. Chapter 9.39 — TEMPORARY USES AND STRUCTURES
  30. Chapter 9.40 — SURFACE MINING AND LAND RECLAMATION
  31. Chapter 9.41 — TRIP REDUCTION REQUIREMENTS
  32. Chapter 9.42 — ACCESSORY SOLAR ENERGY SYSTEMS
  33. Chapter 9.43 — ACCESSORY WIND ENERGY SYSTEMS
  34. Chapter 9.44 — WIRELESS COMMUNICATIONS FACILITIES
  35. Chapter 9.45 — CEMETERIES
  36. Chapter 9.46 — RENEWABLE ENERGY GENERATION FACILITIES
  37. Chapter 9.47 — DENSITY BONUS
  38. Chapter 9.48 — EMERGENCY TRANSITIONAL HOUSING AND SINGLE ROOM …
  39. Chapter 9.51 — DEDICATION OF LAND FOR PARK AND RECREATION PURP…
  40. Chapter 9.55 — SIDEWALK VENDING
  41. Chapter 9.56 — REMOVAL OF WESTERN JOSHUA TREES
  42. Chapter 9.60 — PERMIT PROCEDURES; GENERAL PROVISIONS
  43. Chapter 9.61 — APPLICATION PROCESSING PROCEDURES
  44. Chapter 9.62 — AMENDMENTS TO DEVELOPMENT CODE AND ZONE CHANGES
  45. Chapter 9.63 — CONDITIONAL USE PERMIT
  46. Chapter 9.64 — DEVELOPMENT AGREEMENTS
  47. Chapter 9.65 — GENERAL PLAN AMENDMENTS
  48. Chapter 9.66 — LAND USE COMPLIANCE REVIEW
  49. Chapter 9.67 — PLANNED DEVELOPMENT PERMITS
  50. Chapter 9.68 — SITE PLAN AND DESIGN REVIEW
  51. Chapter 9.69 — SPECIAL USE PERMITS
  52. Chapter 9.70 — SPECIFIC PLANS
  53. Chapter 9.71 — TEMPORARY SPECIAL EVENT PERMIT
  54. Chapter 9.72 — TEMPORARY USE PERMITS
  55. Chapter 9.73 — VARIANCE REVIEW
  56. Chapter 9.74 — REASONABLE ACCOMMODATIONS
  57. Chapter 9.80 — ADMINISTRATION; GENERAL
  58. Chapter 9.81 — APPEALS
  59. Chapter 9.82 — ENFORCEMENT AND VIOLATIONS
  60. Chapter 9.83 — PERMIT AMENDMENTS
  61. Chapter 9.84 — PERMIT REVOCATIONS
  62. Chapter 9.85 — PUBLIC NOTICES AND HEARINGS
  63. Chapter 9.86 — TIME LIMITATIONS AND TIME EXTENSIONS
  64. Chapter 9.90 — GENERAL PROVISIONS
  65. Chapter 9.91 — TENTATIVE MAP FILING AND PROCEDURES
  66. Chapter 9.92 — PARCEL MAPS AND FINAL MAPS
  67. Chapter 9.93 — ADDITIONAL SUBDIVISION PROCEDURES
  68. Chapter 9.94 — DEDICATION AND EXACTIONS
  69. Chapter 9.95 — SUBDIVISION DESIGN AND IMPROVEMENT REQUIREMENTS
  70. Chapter 9.96 — IMPROVEMENT PLANS, INSTALLATION, AND SECURITY
  71. Chapter 9.97 — SOILS REPORT
  72. Chapter 9.99 — DEFINITIONS OF WORDS AND TERMS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.