Part IV. Applicable Federal Interest Rates.
SEC. 11. EXTENSIONS OF TIME TO
Internal Revenue Bulletin 1996-2 · 2026-10-03 edition · updated 2026-10-04 · United States
FILE
.01 For Tax Year 1995 (returns due to be filed in 1996), transmitters requesting an extension of time to file for more than 50 withholding agents are required to file the extension request on magnetic media or via IRPBBS or electronically. ( See Part E.
MAGNETIC/ELECTRONIC SPECIFI-
CATIONS FOR EXTENSION OF
TIME. ) Transmitters requesting an ex tension of time for 10 or more withholding agents are encouraged to file the request magnetically or electronically. Acceptable types of media are tape, tape cartridge, 5 1 ⁄4- and 3 1 ⁄2-inch diskette.
.02 If a Withholding Agent is re-
questing an extension of time to file
Form 1042–S, either on paper or
magnetically/electronically, they must
submit Form 8809, Request for Exten-
sion of Time to File Information Re-
turns (Rev. 3–95) to IRS/MCC by
March 15. If approved, an extension
will be granted for 30 days. A FORM
2758 IS NO LONGER ACCEPTABLE TO
REQUEST AN EXTENSION OF TIME TO
FILE FORM 1042–S.
.03 Failure to properly complete and sign the Form 8809 may cause delays in processing the request or result in a denial. Please read and follow the instructions on the back of the Form 8809 carefully.
.04 Withholding agents may request an extension of time to file for 30 days as soon as they are aware that an extension is necessary, but, no later than the due date of the return. It will take a minimum of 30 days for IRS/MCC to respond to an extension request. Under certain circumstances a request for an extension of time could be denied. In such cases, the withholding agent receives a denial letter. When this denial letter is received, the withholding agent has 20 days to provide additional or necessary information and resubmit the extension request to IRS/MCC.
.05 If an additional extension of time is needed, a second Form 8809 may be submitted before the end of the initial extension. Line 7 on the form should be checked to indicate that the original extension has been received and the additional extension is being requested. A second 30-day extension will be approved only in cases of extreme hardship or catastrophic event.
.06 A filer may only request an extension of time for the tax year of the returns that are due to be filed with IRS.
.07 A magnetically filed request
for an extension of time should be
sent using the following addresses:
If by Postal Service:
IRS-Martinsburg Computing Center
ATTN: Extension of time
Coordinator
P. O. Box 879, MS-360
Kearneysville, WV 25430
If by truck or air freight:
IRS-Martinsburg Computing Center
ATTN: Extension of Time
Coordinator
Route 9 and Needy Road, MS-360
Martinsburg, WV 25401
.08 Transmitters who submit request for multiple withholding agents will receive one approval letter with an attached list of withholding agents covered under that approval.
.09 If an extension of time to file magnetically or electronically is granted, do not include a copy of the letter granting the extension with Form 4804 or computer-generated substitute or to the processing site with the paper Form 1042–S.
.10 IRS/MCC will only grant an
extension of time to file paper or
magnetically/electronically filed Form
1042–S, Foreign Person’s U.S. Source
Income Subject to Withholding.
.11 An approved extension of time for magnetic and electronic filing does not provide additional time for supplying the statement to recipient. Requests for an extension of time to provide the recipient copy must be sent to the IRS/ MCC.
.12 Request an extension of time
to furnish the statements to recipients
by submitting a letter to IRS/MCC
containing the following information:
(a) Withholding Agent’s Name
(b) TIN
(c) Address
(d) Type of Return
(e) Specify that the extension
request is to provide statements to
recipients.
(f) Reason for Delay
(g) Signature of Withholding
Agent or Person Duly Authorized
Requests for an extension of time to
furnish the statements of Form 1042–S
are not automatically approved; how-
ever, if approved, generally an exten-
sion will allow a maximum of 15
additional days from the due date to
furnish the statements to the recipients.
25
If the request is denied, the statements
must be sent to the recipients timely.
The request must be postmarked by the
date on which the statements are due
to the recipients.
.13 An approved extension grants additional time to file the Form 1042–S with IRS/MCC ONLY . This does not include Form 1042 which is an actual tax return. Any tax due must still be paid timely.
.14 To request an extension of time to file Form 1042, submit Form 2758 with the IRS at the following address:
Internal Revenue Service Center Philadelphia, PA 19255
Continue researching
Related topics
State and federal sources. Edit the document title or filters, then run your search.
Get a plain-English answer with a citation back to this text.
Ask AI about this code