Hercules · Building on your lot
Building on your lot in Hercules
Hercules sets its own limits for fences, freestanding accessory structures and home businesses. Fence height depends on the yard, and accessory structure height depends on the distance from a property line.
Key points
- Fence height: Hercules limits fences to 3 ft in the required front yard and 6 ft in rear and side yards; taller only in listed cases.
- Accessory structures: Hercules limits freestanding accessory structures to 15 ft, or 8 ft within 10 ft of a property line; side and rear setback 5 ft.
- Home businesses: Hercules home businesses may use 1 room or 20% of the floor area, whichever is greater, and need an administrative use permit.
Each rule below is marked Hercules code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.
Fences and walls
Hercules code Hercules limits fences to 3 ft in the required front yard and 6 ft in rear and side yards; taller only in listed cases.
All 7 Hercules rules on fences and walls, with the code text →
Sheds, garages and other accessory structures
Hercules code Hercules limits freestanding accessory structures to 15 ft, or 8 ft within 10 ft of a property line; side and rear setback 5 ft.
All 8 Hercules rules on sheds, garages and other accessory structures, with the code text →
Running a business from home
Hercules code Hercules home businesses may use 1 room or 20% of the floor area, whichever is greater, and need an administrative use permit.
All 9 Hercules rules on running a business from home, with the code text →
Lot splits under SB 9
Hercules code Neither new parcel may be smaller than 40% of the original lot area. Each new parcel must be at least 1,200 square feet.
All 15 Hercules rules on lot splits under SB 9, with the code text →
RV and boat parking
| Parking on the street |
|
|---|
Tree removal
| Protected trees |
|
|---|---|
| Replacement trees |
|
Building in a flood zone
| Floodplain permit |
|
|---|---|
| Building in a floodway |
|
| Height of the lowest floor |
|
Grading and erosion control
Hercules code Civil engineer's erosion plan is required unless all conditions are met, including under 1/2 acre disturbed and slopes under 10%. No grading permit is needed for: an excavation that is less than five feet deep and supported by a retaining structure, or does not create a cut slope that is both more than seven feet high and steeper than two horizontal to one vertical, or does not exceed two hundred cubic yards; a fill that does not support structures and does not obstruct a drainage course or alter drainage patterns, if it is on natural grade not steeper than five horizontal to one vertical, or less than three feet deep at its deepest point, or does not exceed two hundred cubic yards; an excavation for basements and footings under a valid building permit
All 4 Hercules rules on grading and erosion control, with the code text →
Park and impact fees for new homes
| Exemptions |
|
|---|
Family child care homes
| Zoning | A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning |
|---|---|
| Business license or fee | A city or county may not charge a business license, fee or tax to run a family child care home |
| Local rules | Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone |
| Small home | Up to eight children, counting the provider's own children under 10 who live there |
| Large home | 7 to 14 children, counting the provider's own children under 10 who live there |
Affordable units in new housing (inclusionary)
Hercules code Affordable units may be built off-site instead of some or all of the units in the development. Land may be dedicated to the City or a City-designated local nonprofit housing developer instead of building some required units.
All 9 Hercules rules on affordable units in new housing (inclusionary), with the code text →
Home alarm permits and false alarms
| How long an alarm may sound |
|
|---|---|
| False alarm fees |
|
| False alarms before a fee |
|
Signs on homes
| Home business signs |
|
|---|
Trash and recycling carts
| Required collection service |
|
|---|
Who this affects
Frequently asked questions
Do I need a permit to remove a tree in Hercules?
Hercules's code: Any mature tree on undeveloped or partially developed property, public or private. (§ 4-15.03); The developer must carry out a city-approved tree replacement plan. (Applies to mature trees removed for a development project with all city land use approvals.) (§ 4-15.05).
What are the rules for building in a Hercules flood zone?
Hercules's code: A development permit is needed before any construction or other development, including manufactured homes. (In any special flood hazard area.) (§ 10-7.403); The lowest floor must be at or above the base flood elevation. (New or substantially improved homes in AE, AH and A1-30 zones.) (§ 10-7.501).
Can I run a family child care home in Hercules?
California law sets this for every city, including Hercules: Zoning: A small or large family child care home is a residential use and a use by right under all local ordinances, including zoning (Health & Safety Code § 1597.45(a)); Business license or fee: A city or county may not charge a business license, fee or tax to run a family child care home (Health & Safety Code § 1597.45(b)); Local rules: Local limits on height, setbacks, lot size, health and safety must be the same as for every other home in the same zone (Health & Safety Code § 1597.45(e)); Small home: Up to eight children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(c)); Large home: 7 to 14 children, counting the provider's own children under 10 who live there (Health & Safety Code § 1596.78(b)).
Do I need a permit for a home alarm in Hercules?
Hercules's code: The alarm must shut off within 20 minutes. (§ 4-12.04); $150. (Fourth false alarm in a calendar year.) (§ 4-12.05).
What signs may I put up at my home in Hercules?
Hercules's code: At most 1 square foot. (Applies to 1 sign at single-family homes with a permitted home-based occupation.) (§ 13-34.301).
When can trash carts go out to the curb in Hercules?
Hercules's code: Must subscribe within 7 days of occupancy. (§ 5-2.08); The collector starts and continues service after 15 days if the owner fails to start it. (Owner fails to start service and does not start it within 15 days after notice.) (§ 5-2.08).
General information, not legal advice.
Ask about a specific Hercules property
Ask GoCodebook how these rules apply to your address and get an answer that cites the section.
Ask your question