Hercules · Building on your lot
Grading and erosion control in Hercules
Hercules's own rules on grading and erosion control, with the code text for every value.
Each rule below links to the section of the Hercules Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Hercules's code says
| Erosion control plan |
|
|---|---|
| Grading without a permit |
|
| Rainy-season limits |
|
Who this affects
Frequently asked questions
What are the grading rules in Hercules?
Hercules's code: No grading permit is needed for: an excavation that is less than five feet deep and supported by a retaining structure, or does not create a cut slope that is both more than seven feet high and steeper than two horizontal to one vertical, or does not exceed two hundred cubic yards; a fill that does not support structures and does not obstruct a drainage course or alter drainage patterns, if it is on natural grade not steeper than five horizontal to one vertical, or less than three feet deep at its deepest point, or does not exceed two hundred cubic yards; an excavation for basements and footings under a valid building permit (§ 7-2.302); Civil engineer's erosion plan is required unless all conditions are met, including under 1/2 acre disturbed and slopes under 10%. (Grading under 200 cubic yards, soil storage under 150, not within 100 feet of water, no downstream threat, no blocked drainage, no significant CEQA impact.) (§ 7-2.305).
General information, not legal advice.