Solar panels and EV chargers in La Mirada

La Mirada's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the La Mirada Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What La Mirada's code says

La Mirada code What La Mirada's code adds
Solar height and setbacks
  • No higher than the city's maximum legal building height, using the most restrictive rule.
    Applies: Applies to a solar panel or array seeking expedited permitting as a small home rooftop solar system.
    § 17.26.070 · code text
    The solar panel or module array shall not exceed the maximum legal building height applicable in the City of La Mirada, as established in the City of La Mirada Zoning Ordinance, Building Code, and Residential Code, or other applicable legal authority, based on the most restrictive provision.
Solar permit process
  • Expedited permit. You may apply in person or online through the electronic submittal system.
    Applies: Applies to small home rooftop solar systems that meet all the expedited permitting criteria.
    § 17.26.030 · code text
    The application for a permit shall meet the requirements of Title 26, Chapter 1, Section 106.4 of the Los Angeles County Code, or any successor provision thereto, and may be submitted in person or electronically through the online submittal system maintained by the Building Official.
  • One combined permit may cover photovoltaic systems. Thermal systems need a separate plumbing permit if plumbing is needed.
    Applies: Applies to photovoltaic and thermal solar systems.
    § 17.26.040 · code text
    A combined solar energy permit may be issued for photovoltaic systems, which will include all building and electrical work, however a separate plumbing permit, if needed, will be required for thermal systems.
Review time
  • Plan check is done within 1 to 3 business days.
    Applies: Applies to a complete small home rooftop solar application.
    § 17.26.030 · code text
    Upon receipt of a complete small residential rooftop solar energy system application, plan check review will be completed within one to three business days.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in La Mirada?

La Mirada's code: Expedited permit. You may apply in person or online through the electronic submittal system. (Applies to small home rooftop solar systems that meet all the expedited permitting criteria.) (§ 17.26.030); One combined permit may cover photovoltaic systems. Thermal systems need a separate plumbing permit if plumbing is needed. (Applies to photovoltaic and thermal solar systems.) (§ 17.26.040).

General information, not legal advice.