Los Angeles Building Code — LAMC Chapter IX § 91.9112 Violations – Penalties for Disregarding Department Orders
Los Angeles Building Code — LAMC Chapter IX · 2026-08 edition · updated 2026-09-23 · Los Angeles
Cite as: Los Angeles Building Code — LAMC Chapter IX § 91.9112 · Text as of 2026-09-23
(Added by Ord. No. 169,341, Eff. 2/4/94.)
Notwithstanding any other provisions of this Code to the contrary, it shall be unlawful for any person, firm or corporation to maintain, use or occupy any building within the scope of this division which does not meet the minimum earthquake standards specified in this division.
Any person who violates or causes or permits another person to violate this provision is guilty of a misdemeanor. Any person includes an owner, lessor, sublessor, manager, or person in control of a building subject to this division. This term shall not include any person who is merely a tenant or other individual occupying any dwelling unit, efficiency dwelling unit, guest room or suite in a building. The legal owner of a building is that person, firm, corporation, partnership, or other entity whose name or title appears on the record with the Los Angeles County Recorder’s Office, as well as all successors or assignees of these persons.
EXCEPTION: This section shall not comply if alteration or repair work has commenced in order to bring the building into compliance with requirements of this division, and such work is proceeding in accordance with the time limits set forth in any order of the department or determination of the board.
TABLE NO. 91-A RATING CLASSIFICATIONS
| Classification Essential |
Occupant Load N/ |
|---|
| Group I | 300 or more |
|---|---|
| Group II | 100 to 299 |
| Group III | 50 to 99 |
| Group IV | Less than 50 |
TABLE NO. 91-B TIME LIMITS FOR COMPLIANCE
| Obtain Building Permit Within | Commence Construction Within | Complete Construction Within |
|---|---|---|
| 365 days | 545 days | Three years |
TABLE NO. 91-C
SERVICE PRIORITIES
| Rating Classification | Minimum Time Period Before Service of Order |
|---|---|
| Group I & Essential (Highest Priority) | 30 days |
| Group II | 90 days |
| Group III | 240 days |
| Group IV (Lowest Priority) | 1 year |
Get a plain-English answer with a citation back to this text.
Ask AI about this code