§ 18.114.010. Purpose.

  • A. Purpose. The purpose of this chapter is to provide procedures for reviewing land uses that may be appropriate in the applicable zone, but whose effects on a site and surroundings cannot be determined before being proposed for a specific site.

  • B. Special Consideration. Certain types of land uses may require special conditions in a particular zone or physical location within the County because they possess unique characteristics or present special problems that make automatic inclusion as permitted uses either impractical or undesirable due to potential and unforeseeable impacts to the surrounding area.

  • C. Intent. The Administrative Permit procedures are intended to provide sufficient flexibility in the use regulations to further the objectives of this Zoning Code and to provide the County with the opportunity to impose special conditions to mitigate potential impacts that could result from allowing the use(s) at the requested location.

  • (Ord. 1976 § 2, 2019)

§ 18.114.020. Applicability.

Approval of an Administrative Permit is required to authorize proposed land uses specified by Article 2 (Zones, Allowable Uses, and Development Standards) as being allowable in the applicable zone when subject to the approval of an Administrative Permit. (Ord. 1976 § 2, 2019)

§ 18.114.030. Review Authority.

  • A. Compliance with Table 6-2. Table 6-2 (Administrative Permits Review Authority) below, identifies the Review Authority responsible for reviewing and making decisions on each type of Administrative Permit application required by this chapter.
Table 6-2
Administrative Permits Review Authority
Type of Action Role of Review Authority
(1)(2)
Administrative
Permits
Director No
Hearing Required
Hearing Offcer
Hearing Required
Commission
Hearing Required
Board Hearing
Required
Dairy Expansion Decision Appeal
Other Uses Decision
(3)
Decision Appeal Appeal
Major Modifcations Decision
(3)
Decision
(3)
Appeal Appeal
Minor Modifcations Decision Appeal Appeal

Notes:

  1. "Decision" is a discretionary action where the Review Authority makes the final decision on the matter; "Appeal" means that the Review Authority may consider and decide upon appeals to the decision of a lower Review Authority in compliance with Chapter 18.144 (Appeals); "Issuance" is a ministerial action where the Review Authority may consider and grant the request in compliance with this Zoning Code; "Recommend" means that the Review Authority should provide preliminary review and forward input to the decision-making Review Authority for consideration.

  2. Any Review Authority may defer action and refer the request to the next higher Review Authority level for consideration and final action. In cases where the Board is specified as the Review Authority, the Board shall be the final level of review.

Notes:

  1. See subsection B (Administrative Permit Review Levels) of this section.
  • B. Administrative Permit Review Levels. The processing of an Administrative Permit is completed at one of four levels: (1) over-the-counter (i.e., staff approval); (2) Director decision without a public hearing; (3) Hearing Officer decision at a public hearing; and (4) Commission or Board decision at a public hearing. The review level is determined by the project proposal, its location, potential for controversy or opposition and potential environmental impacts in the following manner:

    1. Level One—Over-the-Counter Review by Staff.

      • a. An over-the-counter approval may be given for an Administrative Permit for additional dwelling units on a parcel that complies with County Codes. If the project has unresolved issues, the project may be reviewed and acted on by the Director without a public hearing in compliance with Level Two below.

      • b. If significant opposition arises during review, it may be referred to the Hearing Officer in compliance with Level Three below.

    2. Level Two—Director Without a Public Hearing.

      • a. If a project has unresolved issues, it may be reviewed and acted on by the Director without a public hearing.
  • b. The Director shall make a decision on the application and, if approved and no appeal is filed within 10 days, the Administrative Permit is mailed to the applicant and Building Permits may be processed and/or the use established.

    - c. The Director may also refer an application for an Administrative Permit to the Commission for a decision at a public hearing because of controversy or policy issues involved. 
    
       - (1) Any major modifications to an Administrative Permit that was referred to and acted upon by the Commission shall be approved by the Commission pursuant to Section **18.130.090** (Changes to an Approved Permit). 
    
    1. Level Three—Hearing Officer with a Public Hearing.

      • a. If a project appears to be controversial, or if there are unresolved issues, it shall be scheduled for a public hearing before the Hearing Officer.

      • b. The Hearing Officer shall make a decision on the application and, if approved and no appeal is filed within 10 days, the Administrative Permit is mailed to the applicant and Building Permits may be processed and/or the use is established.

      • c. The Hearing Officer may also refer an application for an Administrative Permit to the Commission for a decision at a public hearing because of controversy or policy issues involved.

        • (1) Any major modifications to an Administrative Permit that was referred to and acted upon by the Commission shall be approved by the Commission pursuant to Section 18.130.090 (Changes to an Approved Permit).
    2. Level Four—Commission or Board with a Public Hearing. The Director and Hearing Officer may also refer an application for an Administrative Permit to the Commission or the Board for a decision at a public hearing because of controversy or policy issues involved.

      • a. Any major modifications to an Administrative Permit that was referred to and acted upon by the Commission shall be approved by the Commission pursuant to Section 18.130.090 (Changes to an A pproved Permit).
  • (Ord. 1976 § 2, 2019; Ord. 1990 § 1, 2020)

§ 18.114.040. Application Filing, Processing, and Review.

  • A. An application for an Administrative Permit shall be filed and processed in compliance with Chapter 18.112 (Application Processing Procedures).

  • B. The application shall include the information and materials specified in the most up-to-date Department handout for Administrative Permit applications, together with the required fee in compliance with the Fee Schedule.

  • C. It is the responsibility of the applicant to provide evidence in support of the findings required by Section 18.114.050 (Findings and Decision) below.

  • D. Initial review of the application, including time requirements and requests for information, shall be as provided in Section 18.112.070 (Initial Application Review).

  • E. The applicable Review Authority shall conduct a public hearing on an application for an Administrative Permit before making a decision on the application, if required by Table 6-2 and subsection B (Administrative Permit Review Levels).

  • F. If a public hearing is required, notice of the hearing shall be provided and the hearing shall be conducted in compliance with Chapter 18.146 (Public Notices and Hearings).

  • G. If a public hearing is not required, notice of review/project shall be mailed to all adjacent property owners in compliance with Chapter 18.146 (Public Notices and Hearings).

  • H. The Review Authority decision is first appealable to the Commission and then the Board in compliance with Chapter 18.144 (Appeals).

  • (Ord. 1976 § 2, 2019)

§ 18.114.050. Findings and Decision.

The Review Authority may approve or conditionally approve an Administrative Permit only after first making all of the following findings:

  • A. The proposed use is consistent with the General Plan, any applicable specific plan, and this Zoning Code;

  • B. The proposed use is allowed within the subject zone and complies with all other applicable provisions of this Zoning Code and the County Code;

  • C. The design, location, size, and operating characteristics of the proposed use are compatible with the allowed uses in the vicinity;

  • D. Operation of the use at the location proposed would not be detrimental to the harmonious and orderly growth of the County, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in proximity to the proposed use; and

  • E. The project site is:

    1. Physically suitable in terms of design, location, operating characteristics, shape, size, topography, and the provision of public and emergency vehicle (e.g., fire and medical) access, and public services and utilities or private water/septic public services if not required by zone;

    2. Served by highways and streets adequate in width and improvement to carry the type and quantity of traffic the proposed use would likely generate; and

  1. Served adequately by public water and sewer and/or private septic and wells. (Ord. 1976 § 2, 2019)

§ 18.114.060. Conditions of Approval.

When considering approval of an Administrative Permit, the Review Authority may impose any conditions deemed reasonable and necessary to ensure that the approval will comply with the findings required by Section 18.114.050 (Findings and Decision). (Ord. 1976 § 2, 2019)

§ 18.114.070. Permit to Run with the Land.

  • A. An Administrative Permit approved in compliance with the provisions of this chapter shall continue to be valid upon a change of ownership of the business, parcel, service, structure, or use that was the subject of the permit application in the same area, configuration, and manner as it was originally approved in compliance with this chapter, except as specified in subsection B or as specified in this Code.

  • B. Any Administrative Permit that is not actively exercised for a continuous period of 12 months shall become invalid.

  • (Ord. 1976 § 2, 2019)

§ 18.114.080. Modifications/Changes to an Approved Permit.

Changes to an approved Administrative Permit may only be requested and processed in compliance with Section 18.130.090 (Changes to an Approved Project). (Ord. 1976 § 2, 2019)

§ 18.114.090. Post-Decision Procedures.

The procedures and requirements in Chapter 18.130 (Permit Implementation, Time Limits, and Extensions), and those related to appeals and revocation in Article 7 (Zoning Code Administration) shall apply following the decision on an Administrative Permit application. (Ord. 1976 § 2, 2019)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Merced County Zoning Code
Merced County Zoning Code
  1. Title 18 — Zoning Code
    Overview
    1. Chapter 18.02 — PURPOSE AND APPLICABILITY OF ZONING CODE
    2. Chapter 18.04 — INTERPRETATION OF THE ZONING CODE PROVISIONS
    3. Chapter 18.06 — ZONES AND ZONING MAP
    4. Chapter 18.10 — AGRICULTURAL ZONES (A-1, A-1-40, A-2)
    5. Chapter 18.12 — RESIDENTIAL ZONES (R-R, R-1, R1-5000, R-2, R-3…
    6. Chapter 18.14 — COMMERCIAL ZONES (C-P, C-1, C-2, C-3, H-I-C, MU)
    7. Chapter 18.16 — INDUSTRIAL ZONES (B-P, M-1, M-2)
    8. Chapter 18.20 — PLANNED DEVELOPMENT ZONE (PD)
    9. Chapter 18.22 — FOX HILLS COMMUNITY SPECIFIC PLAN ZONES
    10. Chapter 18.26 — SPECIAL FLOOD HAZARD AREAS
    11. Chapter 18.30 — SITE PLANNING AND GENERAL DEVELOPMENT STANDARDS
    12. Chapter 18.32 — ACCESSORY STRUCTURES
    13. Chapter 18.34 — FENCES, WALLS, AND HEDGES
    14. Chapter 18.36 — LANDSCAPING
    15. Chapter 18.38 — OFF-STREET PARKING REGULATIONS AND DESIGN STAN…
    16. Chapter 18.40 — PERFORMANCE STANDARDS
    17. Chapter 18.44 — SIGN REGULATIONS
    18. Chapter 18.46 — SOLID WASTE AND RECYCLING MATERIALS STORAGE
    19. Chapter 18.48 — SURFACE MINING AND RECLAMATION
    20. Chapter 18.62 — ACCESSORY DWELLING UNITS
    21. Chapter 18.64 — ANIMAL CONFINEMENT FACILITIES
    22. Chapter 18.66 — DENSITY BONUS FOR AFFORDABLE HOUSING
    23. Chapter 18.68 — WIRELESS TELECOMMUNICATION FACILITIES
    24. Chapter 18.90 — GENERAL NONCONFORMING PROVISIONS
    25. Chapter 18.92 — NONCONFORMING PARCELS
    26. Chapter 18.94 — NONCONFORMING STRUCTURES
    27. Chapter 18.96 — NONCONFORMING USES
    28. Chapter 18.98 — OTHER SPECIFIC NONCONFORMING PROVISIONS
    29. Chapter 18.110 — GENERAL PROVISIONS
    30. Chapter 18.112 — APPLICATION PROCESSING PROCEDURES
    31. Chapter 18.114 — ADMINISTRATIVE PERMITS
    32. Chapter 18.116 — CONDITIONAL USE PERMITS
    33. Chapter 18.118 — PLANNED DEVELOPMENT PERMITS
    34. Chapter 18.120 — REASONABLE ACCOMMODATIONS
    35. Chapter 18.122 — SITE PLAN AND DESIGN REVIEW
    36. Chapter 18.124 — TEMPORARY USE PERMITS
    37. Chapter 18.126 — VARIANCES AND MINOR DEVIATIONS
    38. Chapter 18.128 — ZONING CLEARANCES
    39. Chapter 18.130 — PERMIT IMPLEMENTATION, TIME LIMITS, AND EXTEN…
    40. Chapter 18.140 — ADMINISTRATIVE RESPONSIBILITY
    41. Chapter 18.142 — AMENDMENTS (GENERAL PLAN, ZONING CODE, AND ZO…
    42. Chapter 18.144 — APPEALS
    43. Chapter 18.146 — PUBLIC NOTICES AND HEARINGS
    44. Chapter 18.148 — DEVELOPMENT AGREEMENTS
    45. Chapter 18.150 — SPECIFIC PLANS
    46. Chapter 18.152 — PERMIT MODIFICATIONS AND REVOCATIONS
    47. Chapter 18.154 — ENFORCEMENT PROVISIONS
    48. Chapter 18.200 — DEFINITIONS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.