Skip to content

Title IX — Floodplain Management Ordinance›Chapter 2 — DEFINITIONS

Sacramento County Zoning Code § 902-54 Start of Construction

Sacramento County Zoning Code · 2026-06 edition · updated 2026-10-23 · Sacramento County

Cite as: Sacramento County Zoning Code § 902-54 · Text as of 2026-10-23

Includes substantial improvement and other proposed new development and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within 180 days from the date of the permit. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Sacramento County Zoning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.