San Francisco Administrative Code § 99.3 Electric Service to City Departments and Facilities

San Francisco Administrative Code · 2026-08 edition · updated 2026-10-19 · San Francisco

Cite as: San Francisco Administrative Code § 99.3 · Text as of 2026-10-19

(a) All City departments, including departments located in or on non-City-owned facilities and properties, shall receive electric service from the PUC unless the PUC determines that such service is not feasible or the City's lease or contract does not permit such service. All tenants in City facilities or on City property shall receive electric service from the PUC unless the PUC determines that such service is not feasible. Any lease, or sub-lease for a City facility or City property shall include standard language identifying the PUC as the electric provider unless the PUC determines that such service is not feasible.

(b) All City departments shall work with the PUC to plan for, design, and construct electric infrastructure to determine the most beneficial means of constructing and funding infrastructure needed for connection to the electric grid to maximize the long-term benefits and minimize costs to the City. (Added by Ord. 247-14 , File No. 140704, App. 12/17/2014, Eff. 1/16/2015)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — San Francisco Administrative Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.