Part 11 — HISTORIC STRUCTURE WORK PERMIT
Baldwin Park Zoning Code · 2026-06 edition · updated 2026-07-06 · Baldwin Park
§ 153.210.560 INTENT AND PURPOSE. ¶
The historic structure work permit process is a review that ensures that all work proposed to be done to a historic building, structure or place will not be detrimental to the character or value of the building, structure or place. (Ord. 1346, passed 5-2-12)
§ 153.210.570 PROCEEDINGS. ¶
Applications for work permits shall be processed in accordance with these guidelines.
(A) Director of Community Development approval or reference. After the Director of Community Development has received the completed application, the Director shall review the request and conduct a field investigation of the site. If the Director determines that the proposed work will affect only the interior of the building or structure, or will not have more than a minor effect upon the exterior appearance, the Director shall approve the work permit. The Director shall refer all other applications for work permits to the Historic Resource Advisory Committee for determination.
(B) Historic Resource Advisory Committee action. The Historic Resource Advisory Committee shall conduct a public hearing on all referred work permit applications to consider the Director’s recommendation, and shall act to grant, grant subject to conditions or deny the permit. The action shall be by resolution. (Ord. 1346, passed 5-2-12)
§ 153.210.580 RECORD OF PERMIT. ¶
The authorized signature of the Director of Community Development, the Historic Resources Advisory Committee or the Appeal Authority if the permit was appealed, shall signify approval, conditional approval or denial of the work permit.
(Ord. 1346, passed 5-2-12)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Baldwin Park Zoning Code
- Chapter 10 — GENERAL PROVISIONS
- Chapter 15 — ADMINISTRATIVE ENFORCEMENT OF CODE VIOLATIONS
- Chapter 30 — CITY COUNCIL
- Chapter 31 — CITY OFFICIALS AND EMPLOYEES
- Chapter 32 — COMMISSIONS, AGENCIES AND AUTHORITIES
- Chapter 33 — PERSONNEL SYSTEM
- Chapter 34 — FINANCE; PURCHASING
- Chapter 35 — TAXATION
- Chapter 36 — EMERGENCY ORGANIZATIONS
- Chapter 37 — PROPERTY
- Chapter 39 — DECORUM AT COUNCIL MEETINGS
- Chapter 40 — CAMPAIGN CONTRIBUTION LIMITS AND PENALTIES
- Chapter 50 — SOLID WASTE MANAGEMENT
- Chapter 51 — SEWERS
- Chapter 52 — STORM WATER AND URBAN RUNOFF POLLUTION PREVENTION
- Chapter 53 — CONSTRUCTION AND DEMOLITION MATERIALS MANAGEMENT
- Chapter 70 — GENERAL PROVISIONS
- Chapter 71 — TRAFFIC REGULATIONS
- Chapter 72 — STOPPING, STANDING AND PARKING
- Chapter 74 — PARKING SCHEDULES
- Chapter 90 — ABANDONED VEHICLES
- Chapter 91 — ALARM SYSTEMS
- Chapter 92 — ANIMAL CONTROL
- Chapter 93 — FIRE PREVENTION; FIREWORKS
- Chapter 94.5 — SMOKEFREE MULTI-FAMILY HOUSING
- Chapter 95.5 — SEIZURE AND FORFEITURE OF VEHICLES
- Chapter 96 — PUBLIC PARKS
- Chapter 97 — STREETS, SIDEWALKS AND PUBLIC PLACES
- Part 1 — GENERAL PROVISIONS
- Part 2 — UNDERGROUND UTILITY DISTRICTS
- Part 1 — ADMINISTRATIVE PROVISIONS
- Part 2 — DEFINITIONS
- Part 3 — ORGANIZATION AND ENFORCEMENT
- Part 4 — EXISTING BUILDINGS AND BUILDING SERVICE EQUIPMENT
- Part 5 — PERMITS
- Part 6 — APPLICATION REQUIREMENTS
- Part 7 — PERMIT ISSUANCE
- Part 8 — FEES
- Part 9 — INSPECTIONS
- Part 10 — CERTIFICATE OF OCCUPANCY
- Part 11 — ADOPTION AND AMENDMENT OF THE CALIFORNIA BUILDING CO…
- Part 12 — ADOPTION AND AMENDMENTS OF THE
- Part 13 — ADOPTION OF THE CALIFORNIA MECHANICAL CODE
- Part 14 — ADOPTION OF THE CALIFORNIA PLUMBING CODE
- Part 15 — ADOPTION OF THE CALIFORNIA ENERGY CODE
- Part 16 — ADOPTION OF THE CALIFORNIA WILDLAND-UBRAN INTERFACE …
- Part 17 — ADOPTION OF THE CALIFORNIA HISTORICAL BUILDING CODE
- Part 18 — ADOPTION OF THE CALIFORNIA EXISTING BUILDING CODE
- Part 19 — ADOPTION OF THE CALIFORNIA REFERENCED STANDARDS CODE
- Part 20 — ADOPTION OF THE CALIFORNIA FIRE CODE WITH LOS ANGELE…
- Part 1 — PERMITTED USES AND DEVELOPMENT STANDARDS
- Part 2 — SMALL-LOT SINGLE-FAMILY DEVELOPMENTS
- Part 3 — HOUSING INCENTIVES
- Part 4 — MOBILE HOME PARKS
- Part 5 — URBAN DEVELOPMENT UNITS AND URBAN LOT SPLITS
- Part 1 — ADULT-ORIENTED BUSINESSES
- Part 2 — ALCOHOL SALES
- Part 3 — GAME ARCADES AND INTERNET CAFES
- Part 4 — ANIMAL KEEPING
- Part 5 — BILLIARD AND POOL HALLS
- Part 6 — CHILD DAY CARE FACILITIES AND LARGE-FAMILY DAY CARE H…
- Part 7 — DRIVE-THROUGH ESTABLISHMENTS
- Part 8 — HOME OCCUPATIONS
- Part 9 — HOTELS AND MOTELS
- Part 10 — CANNABIS RETAILERS
- Part 11 — ACCESSORY DWELLING UNITS AND JUNIOR ACCESSORY DWELLI…
- Part 12 — SERVICE STATIONS
- Part 13 — SOLAR PANELS
- Part 14 — VEHICLE STORAGE
- Part 15 — PUBLIC TELEPHONES
- Part 16 — EMERGENCY SHELTERS
- Part 17 — MASSAGE ESTABLISHMENTS AND SERVICES
- Part 18 — MEDICAL AND ADULT CANNABIS CULTIVATION, MANUFACTURIN…
- Part 1 — GENERAL PROVISIONS
- Part 2 — DESIGN REVIEW
- Part 3 — ZONING CLEARANCE
- Part 4 — SIGN PERMIT
- Part 5 — TEMPORARY USE PERMIT
- Part 6 — ZONING CODE INTERPRETATION
- Part 7 — ADMINISTRATIVE ADJUSTMENT
- Part 8 — VARIANCE
- Part 9 — CONDITIONAL USE PERMIT
- Part 10 — HISTORIC DESIGNATION
- Part 11 — HISTORIC STRUCTURE WORK PERMIT
- Part 12 — HISTORIC STRUCTURE DEMOLITION PERMIT
- Part 13 — WIRELESS FACILITY ENCROACHMENT PERMIT
- Part 14 — SPECIFIC PLAN
- Part 15 — ZONING CODE TEXT AND ZONING MAP AMENDMENTS
- Part 16 — GENERAL PLAN TEXT AND MAP AMENDMENTS
- Part 17 — DEVELOPMENT AGREEMENT
- Part 18 — DOWNTOWN OVERLAY
- Part 19 — DEVELOPMENT PLAN (PLANNED DEVELOPMENT OVERLAY)
- Part 20 — REASONABLE ACCOMMODATION