§ 150.071 APPLICATION FOR PERMIT.

(A) To obtain a permit an applicant shall file a completed application, in writing, on a form furnished by the Building Official for that purpose.

  • (B) Every such application shall:

  • (1) Identify and describe the work to be covered by the permit for which application is made.

  • (2) Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.

  • (3) Indicate the use or occupancy for which the proposed work is intended.

  • (4) Be accompanied by plans, diagrams, computations and specifications and other data as required in CBC § 107.

(5) State the valuation of any new building or structure or any addition, remodeling or alteration to an existing building.

  • (6) Be signed by the applicant, or the applicant's authorized agent.

  • (7) Give such other data and information as may be required by the Building Official.

  • (C) The work to be covered by the permit for which application is made, shall comply with the code, standards, and laws in effect at the time such application is filed with the Building Official.

(Ord. 1308, passed 12-19-07; Am. Ord. 1338, passed 11-17-10; Am. Ord. 1361, passed 12-18-13; Am. Ord. 1396, passed 2-1-17; Am. Ord. 1441, passed 11-6-19; Am. Ord. 1473, passed 11-16-22; Am. Ord. 1519, passed 12-3-25)

§ 150.072 SUBMITTAL DOCUMENTS.

(A) Plans, specifications, engineering calculations, diagrams, soil investigation reports, special inspection and structural observation programs and other data shall constitute the submittal documents and shall be submitted in one or more sets with each application for a permit.

(B) When such plans are not prepared by an architect or engineer, the Building Official may require the applicant submitting such plans or other data to demonstrate that state law does not require that the plans be prepared by a licensed architect or engineer.

(C) The Building Official may require plans, computations and specifications to be prepared and designed by an engineer or architect licensed by the state to practice as such even if not required by state law.

(D) Exception. The Building Official may waive the submission of plans, calculations, construction inspection requirements and other data if it is found that the nature of the work applied for is such that reviewing of plans is not necessary to obtain compliance with this chapter.

(Ord. 1308, passed 12-19-07; Am. Ord. 1338, passed 11-17-10; Am. Ord. 1361, passed 12-18-13; Am. Ord. 1396, passed 2-1-17; Am. Ord. 1441, passed 11-6-19; Am. Ord. 1473, passed 11-16-22; Am. Ord. 1519, passed 12-3-25)

§ 150.073 INFORMATION ON PLANS AND SPECIFICATIONS.

(A) Plans and specifications shall be drawn to scale on substantial paper or cloth and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this chapter and all relevant laws, ordinances, rules and regulations.

(B) Plans for buildings of other than detached one- and two-family dwellings and Group U Occupancies shall indicate how required structural and fire-resistive integrity will be maintained when a penetration will be made for electrical, mechanical, plumbing and communication conduits, pipes and similar systems.

(Ord. 1308, passed 12-19-07; Am. Ord. 1338, passed 11-17-10; Am. Ord. 1361, passed 12-18-13; Am. Ord. 1396, passed 2-1-17; Am. Ord. 1441, passed 11-6-19; Am. Ord. 1473, passed 11-16-22; Am. Ord. 1519, passed 12-3-25)

§ 150.074 ARCHITECT OR ENGINEER OF RECORD.

(A) When it is required that documents be prepared by an architect or engineer, the Building Official may require the owner to engage and designate on the building permit application an architect or engineer who shall act as the architect or engineer of record.

(B) If the circumstances require, the owner may designate a substitute architect or engineer of record who shall perform all of the duties required of the original architect or engineer of record.

(C) The Building Official shall be notified, in writing, by the owner if the architect or engineer of record is changed or is unable to continue to perform the duties.

(D) The architect or engineer of record shall be responsible for reviewing and coordinating all submittal documents prepared by others, including deferred submittal items, for compatibility with the design of the building. (Ord. 1308, passed 12-19-07; Am. Ord. 1338, passed 11-17-10; Am. Ord. 1361, passed 12-18-13; Am. Ord. 1396, passed 2-1-17; Am. Ord. 1441, passed 11-6-19; Am. Ord. 1473, passed 11-16-22; Am. Ord. 1519, passed 12-3-25)

§ 150.075 DEFERRED SUBMITTALS.

(A) For the purposes of this chapter, deferred submittals are defined as those portions of the design which are not submitted at the time of the application and which are to be submitted to the Building Official within a specified period.

(B) Deferral of any submittal items shall have prior approval of the Building Official. The architect or engineer of record shall list the deferred submittals on the plans and shall submit the deferred submittal documents. Additional plan review fee shall be paid by the applicant for deferred submittals for review by the Building Official prior to their installation.

(C) Submittal documents for deferred submittal items shall be submitted to the registered design architect or engineer of record who shall review them and forward them to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and that they have been found to be in general conformance with the design of the building.

(D) The deferred submittal items shall not be installed until their design and submittal documents have been approved by the Building Official.

(Ord. 1308, passed 12-19-07; Am. Ord. 1338, passed 11-17-10; Am. Ord. 1361, passed 12-18-13; Am. Ord. 1396, passed 2-1-17; Am. Ord. 1441, passed 11-6-19; Am. Ord. 1473, passed 11-16-22; Am. Ord. 1519, passed 12-3-25)

§ 150.076 INSPECTION AND OBSERVATION PROGRAM.

(A) When special inspection is required by CBC Chapter 17, the architect or engineer of record shall prepare an inspection program which shall be submitted to the Building Official for approval prior to issuance of the permit.

(B) The inspection program shall designate the portions of the work to have special inspection, the name or names of the individuals or firms who are to perform the special inspections and indicate the duties of the special inspectors. (C) The special inspector shall be employed by the owner, the engineer or architect of record, or an agent of the owner, but not the contractor or any other person responsible for the work.

(D) When structural observation is required by CBC Chapter 17, the observation program shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur.

(E) The inspection program shall include samples of inspection reports and provide time limits for submission of reports.

(Ord. 1308, passed 12-19-07; Am. Ord. 1338, passed 11-17-10; Am. Ord. 1361, passed 12-18-13; Am. Ord. 1396, passed 2-1-17; Am. Ord. 1441, passed 11-6-19; Am. Ord. 1473, passed 11-16-22; Am. Ord. 1519, passed 12-3-25)

§ 150.077 EXPIRATION OF APPLICATION FOR PERMIT.

(A) Except as provided below, a permit application shall expire if no permit is issued within one year after the date the permit application is filed. A permit application filed prior to the effective date of this chapter, shall expire if no permit is issued within one year after the date the permit application is filed. The Building Official may issue a permit for work shown on an expired application for a permit without requiring the re- submittal of plans and payment of a plan review fee provided:

(1) No changes have been made or will be made to the original plans and specifications except as required by the original plan review;

(2) No pertinent laws or ordinances have been amended subsequent to the date the original application was filed;

(3) The time allowed to obtain the permit does not exceed one year and one month from the date the original application was filed; and

(4) Circumstances beyond the control of the applicant have prevented action from being taken.

(B) Except as provided in this section, no action may be taken on an application after expiration. Plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. To obtain a permit, applicants shall submit a new application, documents and pay a new plan review fee. All applicable codes, standards, and laws in affect at the time of the new application shall then apply to the project.

(Ord. 1308, passed 12-19-07; Am. Ord. 1338, passed 11-17-10; Am. Ord. 1361, passed 12-18-13; Am. Ord. 1396, passed 2-1-17; Am. Ord. 1441, passed 11-6-19; Am. Ord. 1473, passed 11-16-22; Am. Ord. 1519, passed 12-3-25) 2026 S-32

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Baldwin Park Zoning Code
Baldwin Park Zoning Code
  1. Chapter 10 — GENERAL PROVISIONS
  2. Chapter 15 — ADMINISTRATIVE ENFORCEMENT OF CODE VIOLATIONS
  3. Chapter 30 — CITY COUNCIL
  4. Chapter 31 — CITY OFFICIALS AND EMPLOYEES
  5. Chapter 32 — COMMISSIONS, AGENCIES AND AUTHORITIES
  6. Chapter 33 — PERSONNEL SYSTEM
  7. Chapter 34 — FINANCE; PURCHASING
  8. Chapter 35 — TAXATION
  9. Chapter 36 — EMERGENCY ORGANIZATIONS
  10. Chapter 37 — PROPERTY
  11. Chapter 39 — DECORUM AT COUNCIL MEETINGS
  12. Chapter 40 — CAMPAIGN CONTRIBUTION LIMITS AND PENALTIES
  13. Chapter 50 — SOLID WASTE MANAGEMENT
  14. Chapter 51 — SEWERS
  15. Chapter 52 — STORM WATER AND URBAN RUNOFF POLLUTION PREVENTION
  16. Chapter 53 — CONSTRUCTION AND DEMOLITION MATERIALS MANAGEMENT
  17. Chapter 70 — GENERAL PROVISIONS
  18. Chapter 71 — TRAFFIC REGULATIONS
  19. Chapter 72 — STOPPING, STANDING AND PARKING
  20. Chapter 74 — PARKING SCHEDULES
  21. Chapter 90 — ABANDONED VEHICLES
  22. Chapter 91 — ALARM SYSTEMS
  23. Chapter 92 — ANIMAL CONTROL
  24. Chapter 93 — FIRE PREVENTION; FIREWORKS
  25. Chapter 94.5 — SMOKEFREE MULTI-FAMILY HOUSING
  26. Chapter 95.5 — SEIZURE AND FORFEITURE OF VEHICLES
  27. Chapter 96 — PUBLIC PARKS
  28. Chapter 97 — STREETS, SIDEWALKS AND PUBLIC PLACES
  29. Part 1 — GENERAL PROVISIONS
  30. Part 2 — UNDERGROUND UTILITY DISTRICTS
  31. Part 1 — ADMINISTRATIVE PROVISIONS
  32. Part 2 — DEFINITIONS
  33. Part 3 — ORGANIZATION AND ENFORCEMENT
  34. Part 4 — EXISTING BUILDINGS AND BUILDING SERVICE EQUIPMENT
  35. Part 5 — PERMITS
  36. Part 6 — APPLICATION REQUIREMENTS
  37. Part 7 — PERMIT ISSUANCE
  38. Part 8 — FEES
  39. Part 9 — INSPECTIONS
  40. Part 10 — CERTIFICATE OF OCCUPANCY
  41. Part 11 — ADOPTION AND AMENDMENT OF THE CALIFORNIA BUILDING CO…
  42. Part 12 — ADOPTION AND AMENDMENTS OF THE
  43. Part 13 — ADOPTION OF THE CALIFORNIA MECHANICAL CODE
  44. Part 14 — ADOPTION OF THE CALIFORNIA PLUMBING CODE
  45. Part 15 — ADOPTION OF THE CALIFORNIA ENERGY CODE
  46. Part 16 — ADOPTION OF THE CALIFORNIA WILDLAND-UBRAN INTERFACE …
  47. Part 17 — ADOPTION OF THE CALIFORNIA HISTORICAL BUILDING CODE
  48. Part 18 — ADOPTION OF THE CALIFORNIA EXISTING BUILDING CODE
  49. Part 19 — ADOPTION OF THE CALIFORNIA REFERENCED STANDARDS CODE
  50. Part 20 — ADOPTION OF THE CALIFORNIA FIRE CODE WITH LOS ANGELE…
  51. Part 1 — PERMITTED USES AND DEVELOPMENT STANDARDS
  52. Part 2 — SMALL-LOT SINGLE-FAMILY DEVELOPMENTS
  53. Part 3 — HOUSING INCENTIVES
  54. Part 4 — MOBILE HOME PARKS
  55. Part 5 — URBAN DEVELOPMENT UNITS AND URBAN LOT SPLITS
  56. Part 1 — ADULT-ORIENTED BUSINESSES
  57. Part 2 — ALCOHOL SALES
  58. Part 3 — GAME ARCADES AND INTERNET CAFES
  59. Part 4 — ANIMAL KEEPING
  60. Part 5 — BILLIARD AND POOL HALLS
  61. Part 6 — CHILD DAY CARE FACILITIES AND LARGE-FAMILY DAY CARE H…
  62. Part 7 — DRIVE-THROUGH ESTABLISHMENTS
  63. Part 8 — HOME OCCUPATIONS
  64. Part 9 — HOTELS AND MOTELS
  65. Part 10 — CANNABIS RETAILERS
  66. Part 11 — ACCESSORY DWELLING UNITS AND JUNIOR ACCESSORY DWELLI…
  67. Part 12 — SERVICE STATIONS
  68. Part 13 — SOLAR PANELS
  69. Part 14 — VEHICLE STORAGE
  70. Part 15 — PUBLIC TELEPHONES
  71. Part 16 — EMERGENCY SHELTERS
  72. Part 17 — MASSAGE ESTABLISHMENTS AND SERVICES
  73. Part 18 — MEDICAL AND ADULT CANNABIS CULTIVATION, MANUFACTURIN…
  74. Part 1 — GENERAL PROVISIONS
  75. Part 2 — DESIGN REVIEW
  76. Part 3 — ZONING CLEARANCE
  77. Part 4 — SIGN PERMIT
  78. Part 5 — TEMPORARY USE PERMIT
  79. Part 6 — ZONING CODE INTERPRETATION
  80. Part 7 — ADMINISTRATIVE ADJUSTMENT
  81. Part 8 — VARIANCE
  82. Part 9 — CONDITIONAL USE PERMIT
  83. Part 10 — HISTORIC DESIGNATION
  84. Part 11 — HISTORIC STRUCTURE WORK PERMIT
  85. Part 12 — HISTORIC STRUCTURE DEMOLITION PERMIT
  86. Part 13 — WIRELESS FACILITY ENCROACHMENT PERMIT
  87. Part 14 — SPECIFIC PLAN
  88. Part 15 — ZONING CODE TEXT AND ZONING MAP AMENDMENTS
  89. Part 16 — GENERAL PLAN TEXT AND MAP AMENDMENTS
  90. Part 17 — DEVELOPMENT AGREEMENT
  91. Part 18 — DOWNTOWN OVERLAY
  92. Part 19 — DEVELOPMENT PLAN (PLANNED DEVELOPMENT OVERLAY)
  93. Part 20 — REASONABLE ACCOMMODATION

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.