Chapter 87.08 — SOIL REPORTS
San Bernardino County Zoning Code · 2026-06 edition · updated 2026-07-25 · San Bernardino County
§ 87.08.010 Purpose. ¶
This Chapter provides standards for the preparation and review of soils reports, in compliance with the Map Act Chapter 4, Article 7.
(Ord. 4011, passed - -2007)
§ 87.08.020 Preliminary Soils Report. ¶
A preliminary soils report based upon adequate test borings and prepared by a registered civil engineer shall be required for every subdivision for which a Final Map is required or when required as a condition of development when soils conditions warrant the investigation and report. The preliminary soils report shall be submitted with the Tentative Map application.
(a) Form of Report. A preliminary soils report may be divided into two parts:
(1) Soils Reconnaissance. The soil reconnaissance shall include a complete description of the site based on a field investigation of soils matters. The soils matters reviewed shall include stability, erosion, settlement, feasibility of construction of the proposed improvements, description of soils related hazards and problems, and proposed methods of eliminating or reducing these hazards and problems; and
(2) Soils Investigation and Report. This investigation and report shall include field investigation and laboratory tests with detailed information and recommendations relative to all aspects of grading, filling, and other earthwork, foundation design, pavement design and subsurface drainage.
(A) The report shall also recommend any required corrective action for the purpose of preventing structural damage to subdivision improvements and the structures to be constructed on the parcels. The report shall also recommend any special precautions required for erosion control, and the prevention of sedimentation or damage to off-site property.
(B) If the preliminary soils report indicates the presence of critically expansive soils or other soils problems which, if not corrected, would lead to structural defects or environmental impacts, a subsequent soils investigation of each parcel in the subdivision may be required and shall be submitted to and approved by the Building Official before approval of a Parcel or Final Map.
(b) Preliminary Soils Report Waiver. The preliminary soils report may be waived if the Building Official determines that existing available information on the qualities of the soils of the subdivision makes no preliminary analysis necessary.
(Ord. 4011, passed - -2007)
§ 87.08.030 Final Soils Report. ¶
A final soils report prepared by a registered civil engineer shall be required where a preliminary soils report was required, unless the final report is waived by the Building Official.
(a) Filing of Report. The final soils investigation and report shall be filed with the improvement plans.
(b) Content of Report.
(1) The report shall contain sufficient information to ensure compliance with all recommendations of the preliminary soils report and the specifications for the project.
(2) The report shall also contain information relative to soils conditions encountered which differed from that described in the preliminary soils reports, along with any corrections, additions, or modifications not shown on the approved plans.
(Ord. 4011, passed - -2007)
§ 87.08.040 Geologic Investigation and Report. ¶
If the Building Official determines that conditions warrant, a geologic investigation and report may also be required. (Ord. 4011, passed - -2007)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Bernardino County Zoning Code
- Chapter 81.01 — PURPOSE AND EFFECT OF DEVELOPMENT CODE
- Chapter 81.02 — INTERPRETATION OF REGULATIONS
- Chapter 82.01 — LAND USE PLAN, LAND USE ZONING DISTRICTS, AND …
- Chapter 82.02 — ALLOWED LAND USES AND DEVELOPMENT
- Chapter 82.03 — AGRICULTURAL AND RESOURCE MANAGEMENT LAND USE …
- Chapter 82.04 — RESIDENTIAL LAND USE ZONING DISTRICTS
- Chapter 82.05 — COMMERCIAL LAND USE ZONING DISTRICTS
- Chapter 82.06 — INDUSTRIAL AND SPECIAL PURPOSE LAND USE ZONING…
- Chapter 82.07 — ADDITIONAL AGRICULTURE (AA) OVERLAY
- Chapter 82.08 — AGRICULTURAL PRESERVE (AP) OVERLAY
- Chapter 82.09 — AIRPORT SAFETY (AR) OVERLAY
- Chapter 82.10 — ALTERNATE HOUSING (AH) OVERLAY
- Chapter 82.11 — BIOTIC RESOURCES (BR) OVERLAY
- Chapter 82.12 — CULTURAL RESOURCES PRESERVATION (CP) OVERLAY
- Chapter 82.13 — FIRE SAFETY (FS) OVERLAY
- Chapter 82.14 — FLOODPLAIN SAFETY (FP) OVERLAY
- Chapter 82.15 — GEOLOGIC HAZARD (GH) OVERLAY
- Chapter 82.16 — HAZARDOUS WASTE (HW) OVERLAY
- Chapter 82.17 — MINERAL RESOURCES (MR) OVERLAY
- Chapter 82.18 — NOISE HAZARD (NH) OVERLAY
- Chapter 82.19 — OPEN SPACE (OS) OVERLAY
- Chapter 82.20 — PALEONTOLOGIC RESOURCES (PR) OVERLAY
- Chapter 82.21 — SIGN CONTROL (SC) OVERLAY
- Chapter 82.22 — SPHERE STANDARDS (SS) OVERLAY
- Chapter 82.23 — COMMUNITY PLANS, SPECIFIC PLANS AND AREA PLANS
- Chapter 82.36 — OAK HILLS COMMUNITY PLAN
- Chapter 83.01 — GENERAL PERFORMANCE STANDARDS
- Chapter 83.02 — GENERAL DEVELOPMENT AND USE STANDARDS
- Chapter 83.03 — AFFORDABLE HOUSING INCENTIVES - DENSITY BONUS
- Chapter 83.04 — CONDITIONAL GRADING COMPLIANCE
- Chapter 83.05 — DEDICATIONS AND INSTALLATIONS OF STREET AND TR…
- Chapter 83.06 — FENCES, HEDGES, AND WALLS
- Chapter 83.07 — LIGHT TRESPASS
- Chapter 83.08 — HILLSIDE GRADING STANDARDS
- Chapter 83.09 — INFRASTRUCTURE IMPROVEMENT STANDARDS
- Chapter 83.10 — LANDSCAPING STANDARDS
- Chapter 83.11 — PARKING AND LOADING STANDARDS
- Chapter 83.12 — ROAD SYSTEM DESIGN STANDARDS
- Chapter 83.13 — SIGN REGULATIONS
- Chapter 83.14 — TRANSPORTATION CONTROL MEASURES
- Chapter 83.15 — CONDITIONAL COMPLIANCE FOR WATER QUALITY MANAG…
- Chapter 84.01 — ACCESSORY STRUCTURES AND USES
- Chapter 84.02 — ADULT BUSINESSES
- Chapter 84.03 — AGRITOURISM ENTERPRISES
- Chapter 84.04 — ANIMAL KEEPING
- Chapter 84.05 — BED AND BREAKFAST USES
- Chapter 84.06 — CEMETERIES
- Chapter 84.07 — COMMERCIAL AND INDUSTRIAL TRANSITIONAL USES
- Chapter 84.09 — FIREWOOD STORAGE
- Chapter 84.10 — GARAGE SALES
- Chapter 84.11 — HAZARDOUS WASTE FACILITIES
- Chapter 84.12 — HOME OCCUPATIONS
- Chapter 84.13 — MASSAGE SERVICES
- Chapter 84.14 — MOBILE HOME PARKS
- Chapter 84.16 — MULTI-FAMILY RESIDENTIAL DEVELOPMENT STANDARDS
- Chapter 84.17 — NONCONFORMING USES AND STRUCTURES
- Chapter 84.18 — PLANNED DEVELOPMENT STANDARDS
- Chapter 84.19 — RECYCLING FACILITIES
- Chapter 84.20 — SERVICE STATIONS
- Chapter 84.21 — SINGLE-FAMILY RESIDENTIAL DWELLINGS
- Chapter 84.22 — SMALL LOT RESIDENTIAL DEVELOPMENT
- Chapter 84.23 — LICENSED RESIDENTIAL CARE FACILITIES
- Chapter 84.24 — SOLID WASTE/RECYCLABLE MATERIALS STORAGE
- Chapter 84.25 — TEMPORARY STRUCTURES AND USES
- Chapter 84.26 — WIND ENERGY SYSTEMS - ACCESSORY
- Chapter 84.27 — WIRELESS TELECOMMUNICATION FACILITIES
- Chapter 84.28 — SHORT-TERM RESIDENTIAL RENTALS
- Chapter 84.29 — RENEWABLE ENERGY GENERATION FACILITIES
- Chapter 84.30 — GREENHOUSE GAS EMISSIONS REDUCTION PLAN IMPLEM…
- Chapter 84.32 — SMALL UNLICENSED RESIDENTIAL CARE FACILITIES
- Chapter 84.33 — EMERGENCY SHELTERS
- Chapter 84.34 — COMMERCIAL CANNABIS ACTIVITY
- Chapter 84.35 — INDUSTRIAL HEMP
- Chapter 84.36 — ACCESSORY DWELLING UNITS
- Chapter 85.01 — PERMIT APPLICATION FILING AND PROCESSING
- Chapter 85.02 — BASIC REVIEW PROCEDURES
- Chapter 85.03 — APPLICATION PROCEDURES
- Chapter 85.04 — ABC LICENSING
- Chapter 85.05 — CERTIFICATE OF LAND USE COMPLIANCE
- Chapter 85.06 — CONDITIONAL USE PERMIT/MINOR USE PERMIT
- Chapter 85.07 — FLOOD HAZARD DEVELOPMENT REVIEWS
- Chapter 85.08 — SITE PLAN PERMITS
- Chapter 85.09 — TENANT REVIEW
- Chapter 85.10 — PLANNED DEVELOPMENT PERMITS
- Chapter 85.11 — PRE-CONSTRUCTION FLOOD HAZARD MITIGATION AND E…
- Chapter 85.12 — REVISIONS TO AN APPROVED ACTION
- Chapter 85.13 — SIGN LOCATION PLANS
- Chapter 85.14 — SPECIAL USE PERMITS
- Chapter 85.15 — TEMPORARY USE PERMITS
- Chapter 85.16 — TEMPORARY SPECIAL EVENT PERMITS
- Chapter 85.17 — VARIANCES
- Chapter 85.18 — ACCESSORY WIND ENERGY SYSTEM PERMIT
- Chapter 85.19 — FOOD TRUCK EVENT PERMITS
- Chapter 85.20 — UNLICENSED RESIDENTIAL CARE FACILITIES PERMIT
- Chapter 85.21 — ADULT BUSINESS REGULATORY PERMIT
- Chapter 86.01 — PLANNING AGENCY
- Chapter 86.02 — DEVELOPMENT REVIEW COMMITTEE
- Chapter 86.03 — ENVIRONMENTAL REVIEW COMMITTEE
- Chapter 86.04 — FLOODPLAIN ADMINISTRATOR
- Chapter 86.05 — DECISIONS BY THE REVIEW AUTHORITY
- Chapter 86.06 — TIME LIMITATIONS
- Chapter 86.07 — PUBLIC HEARINGS
- Chapter 86.08 — APPEALS
- Chapter 86.09 — ENFORCEMENT
- Chapter 86.10 — AGRICULTURAL PRESERVES/LAND CONSERVATION CONTR…
- Chapter 86.11 — AIRPORT COMPREHENSIVE LAND USE PLANS
- Chapter 86.12 — AMENDMENTS
- Chapter 86.13 — DEVELOPMENT AGREEMENT ADOPTION AND AMENDMENT
- Chapter 86.14 — SPECIFIC PLAN ADOPTION AND AMENDMENT
- Chapter 86.15 — POST-DISASTER REBUILDING
- Chapter 87.01 — SUBDIVISION ORDINANCE APPLICABILITY AND ADMINI…
- Chapter 87.02 — TENTATIVE MAP FILING AND PROCESSING
- Chapter 87.03 — PARCEL MAPS AND FINAL MAPS
- Chapter 87.04 — ADDITIONAL SUBDIVISION PROCEDURES
- Chapter 87.05 — DEDICATIONS AND EXACTIONS
- Chapter 87.06 — SUBDIVISION DESIGN AND IMPROVEMENT REQUIREMENTS
- Chapter 87.07 — IMPROVEMENT PLANS, INSTALLATION, AND SECURITY
- Chapter 87.08 — SOIL REPORTS
- Chapter 88.01 — PLANT PROTECTION AND MANAGEMENT
- Chapter 88.02 — SOIL AND WATER CONSERVATION
- Chapter 88.03 — SURFACE MINING AND LAND RECLAMATION
- Chapter 89.01 — DRAINAGE FACILITIES FINANCING
- Chapter 89.02 — RECREATIONAL FACILITIES FINANCING
- Chapter 89.03 — TRANSPORTATION FACILITIES FINANCING