10.2 Ground Motion and Seismic Ground Deformation Characterization
San Francisco Building Inspection Commission Codes · 2022 edition · updated 2026-07-25 · San Francisco
The regional seismic hazard assessment and ground-motion characterization should follow the procedures provided in applicable seismic guidelines and code provisions (e.g., PEER TBI 2017, ASCE 7). These procedures include the application of Probabilistic and Deterministic Seismic Hazard Analyses (PSHA, DSHA) incorporating specific seismic source models (e.g., UCERF, USGS NSHMP 2014 or 2018) and ground motion models (GMMs). The GEOR may use updated, widely adopted models in PSHA and DSHA in site-specific analysis. The ground-motion characterization should address pertinent issues such as near-fault effects, basin effects, and dynamic soil response (site effects). Embedment and base averaging effects may be accounted for, as applicable.
The selection and modification of ground motions (acceleration time series) should be consistent with recommendations found in the applicable codes and standards.
The subsequent sections address ground-motion characterization at the surface and at depth.
10.2.1 Ground-Motion Characterization at Surface
For Site Classes A, B, and C, the ground-motion development may be based on Vs30 measured from the ground surface using ground motion models (GMMs). The resulting ground-surface acceleration response spectra (MCER and DE) should be checked against minimum code requirements.
For Site Class D determined based on Vs30 measured from the ground surface, the ground motion may be developed using site response analyses
or GMM’s, as determined by the GEOR and approved by the geotechnical members of the EDRT. The resulting acceleration response spectra should be checked against the minimum code requirements. Consideration of site response analysis is warranted because of the breadth of the Vs30 values defining Site Class D soil profiles (i.e., Vs30 of 600 to 1,200 ft/sec) and the range in anticipated ground-surface motions for the wide variety of soil conditions represented by Site Class D sites.
Other factors influencing the decision to perform a site response analysis include: (1) depth to material with shear wave velocity equal to or greater than 1,200 ft/s, (2) depth to bedrock defined as the Site Class B/C boundary (2,500 ft/sec), and (3) the trend of site-specific Vs with depth (i.e., the site period).
- For Site Classes E and F, site response analysis using methods suitably calibrated by the GEOR should be performed and the design spectrum calculated at the ground surface should be in conformance with the applicable Building Code requirements. For sites where (1) surficial soil (e.g., liquefiable fill and soft Bay mud) are removed through basement excavation and foundation installation or (2) ground improvement is used to bypass liquefiable or soft soil, the GEOR should evaluate whether the site could be reclassified as site class D with concurrence with the geotechnical members of the EDRT.
th the applicable Building Code requirements. For sites where (1) surficial soil (e.g., liquefiable fill and soft Bay mud) are removed through basement excavation and foundation installation or (2) ground improvement is used to bypass liquefiable or soft soil, the GEOR should evaluate whether the site could be reclassified as site class D with concurrence with the geotechnical members of the EDRT.
The number and characteristics of ground motions, variation in shear-wave velocity profile, and variation in soil shear modulus reduction and material damping curves used in site response analysis should be adequate to capture the potential variation in surface ground motion in a realistic and defensible manner.
The following procedure is suggested for consideration by the GEOR:
After a thorough review of site-specific geotechnical and geophysical data, evaluate the applicability of GMMs (i.e., Vs30-based estimation) for approximating the dynamic response of the soil profile.
If site-specific aspects of the soil profile are not reasonably approximated by the “average, characteristic Vs profile” implied by the GMMs, ground response analysis should be considered. The ground-surface motions developed through ground response analysis should be checked against minimum code requirements.
Ground Motion Characterization Commentary: The level of analysis required for establishing surface, or near-surface, ground motions should reflect site-specific factors such as stratigraphy, geotechnical characteristics and properties of the soils, depth to bedrock, the trend of Vs from the ground surface to competent bedrock, and the amplitude of the bedrock motions (e.g., MCER, DE). Methods of analysis can be generalized as consisting of (1) numerical dynamic site response analyses, (2) estimation using current GMMs that include regression terms for Vs30 (e.g., NGA-West2 GMMs), and (3) simplified, code-based site class designation and site coefficients (Fpga, Fa, and Fv), which are required as a check on the ground motions developed using methods 1 or 2. The applicability and suitability of site response analysis and GMMs for the development of design-level ground surface motions should be evaluated prior to adoption on a project-specific basis for all Class D sites. The potential range of representative ground-surface motions anticipated at Class D sites due to the inherent variability of subsurface conditions and dynamic response of soil profiles falling under this general Vs30based classification in the San Francisco Bay Area necessitates critical evaluation of the procedures applied for developing design ground motions. It is suggested that the GEOR engage the geotechnical members of the EDRT as soon as practical after pertinent site-specific geotechnical and geophysical data have been collected to identify the appropriate method of developing ground-surface motions prior to analysis. The following suggestions are deemed pertinent to local practice and provided for demonstration and guidance. For sites containing soft-to-medium stiff fine-grained soils (e.g., BM), numerical ground response analysis is preferred and considered the primary method for developing ground-surface motions. This suggestion also applies to sites with lower Vs30 (600 ft/s to 900 ft/s). In this situation, methods 2 and 3 are performed as checks on the results of the numerical site response analyses. For stiffer soil profiles with Vs30 in the upper range of the Site Class D category (900 ft/s to 1,200 ft/s), methods 2 and 3 may be acceptable for characterizing ground motion. Many sites in the San Francisco Bay Area are underlain by dense sand and stiff clays that contribute to Vs30
values in the range of 1,000 to 1,200 ft/s. The development of ground motion for these sites may be based on site-specific Vs30 measured from the ground surface using GMMs.
Ground Response Commentary: Dynamic ground response analyses are routinely performed in practice using equivalent-linear and nonlinear models. The strengths and limitations of both methods of analysis have been addressed in the technical literature, and one of the primary differences in the two approaches is simulation of moderate- to large-strain behavior in cyclic loading. The combination of soft or medium stiff soil (i.e. BM or other marine deposits) and liquefiable sands that are prevalent in San Francisco, and the
nonlinear models. The strengths and limitations of both methods of analysis have been addressed in the technical literature, and one of the primary differences in the two approaches is simulation of moderate- to large-strain behavior in cyclic loading. The combination of soft or medium stiff soil (i.e. BM or other marine deposits) and liquefiable sands that are prevalent in San Francisco, and the
strength of design-level cyclic loading leads to highly nonlinear soil behavior. Therefore, nonlinear models that have been suitably calibrated are preferred over the equivalent linear model; however, equivalent linear site response analysis results are often used for comparison with nonlinear site response analysis results. Numerous computer programs have been used to perform nonlinear site response analysis on local projects. The GEOR may select the preferred model for the project. It is suggested that the GEOR provide documentation supporting calibration of the proposed model for analysis of similar soil profiles subjected to ground motions that are similar in nature to the design-level motions required for the project. Irrespective of the model used on the project, the results of the dynamic response analysis should be reviewed by the geotechnical members of the EDRT. The slope of bedrock in the vicinity of the site should be evaluated and the GEOR, with approval from geotechnical members of the EDRT, should determine whether a two-dimensional site response analysis is required.
For sites at which lateral and vertical variability of the soil profile and depth to bedrock is significant enough to result in dual Site Class designations, two-dimensional or three-dimensional site response analysis may be required to develop an appropriate ground motions for design. The required check against code-based ground motions should be provided for both Site Classes, and the proposed design motions presented to the geotechnical members of the EDRT for review.
10.2.2 Site Response and Ground Motion Characterization at Depth of Interest
Time series selected and modified by the GEOR for use in structural dynamic analyses by the structural engineer of record (SEOR) should be representative of the ground motions at the depth of interest for the structural model. The depth of interest is a function of the modeling approach implemented by the SEOR. Primary considerations for the ground motions used in dynamic structural analyses are well presented in numerous documents (e.g., NEHRP 2015, NIST 2011, NIST 2012). In most cases, ground surface motions should not be used in structural models for buildings with multiple basement levels. Therefore, the acceleration response spectrum used as the basis for modification of time series should be developed using either (1) calibrated ground response analysis allowing development of the acceleration response spectrum at the appropriate depth, or (2) validated simplified methods that account for foundation embedment effects. The latter would be required, for example, on projects for which the ground surface motions were developed using GMM’s and trends in the motions with depth are not provided.
loped using either (1) calibrated ground response analysis allowing development of the acceleration response spectrum at the appropriate depth, or (2) validated simplified methods that account for foundation embedment effects. The latter would be required, for example, on projects for which the ground surface motions were developed using GMM’s and trends in the motions with depth are not provided.
The design team, with review by the geotechnical members of the EDRT, should determine whether ground response analysis should be performed using ground motions corresponding to MCER, DE (or both), and possibly the Serviceability Level earthquake (SLE).
For sites where (1) surficial soils (e.g., liquefiable fill and BM) are removed through basement excavation or foundation installation, or (2) ground improvement is used to bypass liquefiable and soft soil, the GEOR, with concurrence of the geotechnical members of the EDRT, should evaluate whether the site could be reclassified for the sake of ground-motion comparison to code-based requirements based on a representative 30 m (100 ft) time-averaged interval velocity that is computed using site-specific Vs data over a depth range deemed appropriate for configuration of the basement, foundation, or ground treatment.
Ground Motion Characterization Commentary: For a surface foundation, the energy transmitted to the structure is applied through soil in contact with the base of the foundation. For embedded structures, the basement walls may be in contact with liquefiable soil or soft clayey soil over a certain depth and then in contact with competent soil down to the lowest elevation of the basement walls. In this case, the presence of soft or liquefiable soil may be ignored and Vs30 could be evaluated from the surface of competent soils. The rationale behind this is; while ground motion within soft or liquefiable soil may be higher than ground motion within the competent soils, the energy transmitted to the structure from these layers is relatively small due to their low stiffness (i.e., the product of ground-motion intensity and soil stiffness controls the amount of energy transmitted to the structure from each layer). However, seismic earth pressures should consider the effects of soft soil against basement walls.
10.2.3 Kinematic Soil-Structure Interaction (KSSI)
KSSI analysis may be performed using (1) simplified methods accounting for base averaging and embedment effects (e.g., NIST 2012), or (2) finite element or finite difference kinematic SSI analysis. It should be noted that the provisions of ASCE 7-16 (Chapter 19) provide a maximum allowable reduction of ground motion due to combined (base averaging and embedment) kinematic SSI effects when performing nonlinear response history analyses. Per ASCE 7-16 Section (19.2.3), the site-specific response spectrum modified for kinematic SSI shall not be less than 70% of Sa as determined from the design response spectrum and MCER response spectrum motions developed using the code-based approaches. When using the simplified method (Chapter 19, ASCE7-16) for evaluation of ground motion with embedment effects, the Vs30 computed from the ground surface (as opposed to from the bottom of the basement) should be used. To compute the ground motion reduction due to embedment effects, the average shear wave velocity over the height of the basement should be used.
If finite element or finite difference kinematic SSI analysis is performed (1) the ground motion near the boundary of the model should be similar to those obtained from one dimensional site response analysis, and (2) kinematic ground motion should meet ASCE 7 requirements.
Commentary: If soil conditions at the boundary of the FEM model vary from those at the site, the ground motion calculated at the boundary may be compared with results of one-dimensional finite element or finite difference site response analysis using soil profile at the boundary.
10.2.4 Development of Ground Motion Time Series
If ground acceleration time series are used (i.e., performance-based design approach), seed motions should be selected based on the controlling earthquake scenarios (e.g., magnitude, site-to-source distance, significant duration (D5-75, D5-95), Arias Intensity, peak ground velocity (PGV), and period of pulse for forward-directivity motions), and the Vs30 at the recording station. The percentage of seed motions that have near-source (directivity) characteristics can be defined from deaggregation of the regional seismic hazard (PSHA) for the 2,475-year average return period and across the structural period range of interest, identification of the primary seismic hazards, and the amplitude of the motions from the predominate seismic sources relative to the uniform hazard (NEHRP 2015, NIST 2011).
If spectral matching of seed motions is performed, care should be exercised not to eliminate or unreasonably elongate the pulse period.
Ground motions with velocity pulse characteristics should be rotated and oriented along fault normal (FN) and fault parallel (FP) directions. Furthermore, the modified motions in FN and FP directions should be rotated again based on the orientation of the building axis relative to the causative fault. Seed motions that do not exhibit near-fault effects (i.e., without the forward-directivity or fling step) may be used in a random orientation.
stics should be rotated and oriented along fault normal (FN) and fault parallel (FP) directions. Furthermore, the modified motions in FN and FP directions should be rotated again based on the orientation of the building axis relative to the causative fault. Seed motions that do not exhibit near-fault effects (i.e., without the forward-directivity or fling step) may be used in a random orientation.
Commentary: Applying seed motions that do not exhibit near-source effects in a random orientation deviates from ASCE 7 requirements but is judged to be appropriate. However, care should be taken that the mean spectra for each direction of response meets ASCE limits so as to avoid design that do not meet minimum strength criteria in any direction.
It is recommended that orbit plots at structural periods of interest be made before and after spectral matching and before and after rotation of ground motion along the building axis to confirm that the appropriate orientation of ground motion is used in the structural dynamic analysis.
For structures on continuous foundations with plan dimensions of greater than 400 feet, effects of wave passage and incoherency of ground motion on design ground motions should be evaluated and addressed.
10.2.5 Seismic Slope Stability and Soil Liquefaction Hazards
The potential for and consequences of liquefaction or cyclic degradation of soils should be evaluated using current and widely adopted methods of analysis. The evaluation of liquefaction hazard should be based on standard semi-empirical methods.
If potentially liquefiable soil layers are present below the foundation level, the effects of soil liquefaction (strength loss, settlement and down-drag loads acting on deep foundations) and potential for lateral spreading should be evaluated. The GEOR should review published maps and reports regarding potential for soil-liquefaction-induced ground settlement and lateral spreading at the site and in its vicinity.
Commentary: Existing reports include Lawson Report on the 1906 Great San Francisco Earthquake (1908), Harding Lawson Associates, City and County of San Francisco Soil Liquefaction Report (1992), GHD-GTC Port of San Francisco Seawall Stability Report (2016), and Port of San Francisco, Seawall Resiliency Study currently underway.
For sites underlain by BM, the potential for seismically induced slope deformation should be evaluated, and mitigation measures should be identified.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Francisco Building Inspection Commission Codes
- Section 101A — TITLE, SCOPE AND GENERAL
- Section 102A — UNSAFE BUILDINGS, STRUCTURES OR PROPERTY
- Section 103A — VIOLATIONS
- Section 104A — ORGANIZATION AND ENFORCEMENT
- Section 105A — BOARDS, COMMISSIONS, AND COMMITTEES
- Section 106A — PERMITS
- Section 107A — FEES
- Section 108A — INSPECTIONS
- Section 109A — CERTIFICATE OF OCCUPANCY; AMENDED CERTIFICATE O…
- Section 110A — SCHEDULE OF FEE TABLES
- Section 111A — ADAPTIVE REUSE
- Section 202 — DEFINITIONS
- Section 406 — MOTOR-VEHICLE-RELATED OCCUPANCIES
- Section 435 — SPECIAL PROVISIONS FOR LICENSED 24-HOUR CARE FAC…
- Section 456 — FENCES
- Section 707 — FIRE BARRIERS
- Section 901 — GENERAL
- Section 903 — AUTOMATIC SPRINKLER SYSTEMS
- Section 905 — STANDPIPE SYSTEMS
- Section 907 — FIRE ALARM AND DETECTION SYSTEMS
- Section 912 — FIRE DEPARTMENT CONNECTIONS
- Section 1010 — DOORS, GATES AND TURNSTILES
- Section 1011 — STAIRWAYS
- Section 1012 — RAMPS
- Section 1013 — EXIT SIGNS
- Section 1015 — GUARDS
- Section 1016 — EXIT ACCESS
- Section 1001A — SCOPE
- Section 1002A — DEFINITIONS
- Section 1003A — GENERAL REQUIREMENTS FOR SECURITY
- Section 1004A — SPECIAL HOTEL AND MOTEL SECURITY REQUIREMENTS
- Section 1005A — SPECIAL APARTMENT HOUSE AND CONDOMINIUM SECURITY
- Section 1101D — SCOPE
- Section 1102D — DEFINITIONS
- Section 1103D — DEPARTMENT COORDINATION
- Section 1104D — DISABILITY ACCESS COMPLIANCE UNIT
- Section 1105D — REPORTS TO THE MAYOR’S OFFICE ON DISABILITY AN…
- Section 1106D — NOTICE
- Section 1107D — [REPEALED]
- Section 1108D — [REPEALED]
- Section 1109D — [REPEALED]
- Section 1110D — [REPEALED]
- Section 1111D — [REPEALED]
- Section 1112D — [REPEALED]
- Section 1113D — [REPEALED]
- Section 1114D — [REPEALED]
- Section 1202 — VENTILATION
- Section 1204 — LIGHTING
- Section 1206 — SOUND TRANSMISSION
- 1208.4 Revise paragraph 1 of this section and add paragraphs 5…
- Section 1210 — [ ← ] TOILET, BATHROOM AND LACTATION ROOM REQUI…
- Section 1301A — TITLE
- Section 1302A — INTENT
- Section 1303A — DEFINITIONS
- Section 1304A — RULES AND GUIDELINES
- Section 1305A — CIVIL REMEDIES
- Section 1306A — REQUIREMENTS
- Section 1307A — INFORMATIONAL BROCHURE
- Section 1308A — POSTPONEMENTS OF REQUIREMENTS
- Section 1309A — EARLY COMPLIANCE WITH WATER CONSERVATION MEASU…
- Section 1310A — WATER CONSERVATION INSPECTIONS
- Section 1311A — PROOF OF COMPLIANCE WITH WATER CONSERVATION ME…
- Section 1312A — APPEALS FROM RESULTS OF A WATER CONSERVATION I…
- Section 1313A — REQUIRED WATER CONSERVATION MEASURES
- Section 1314A — WATER CONSERVATION INSPECTIONS
- Section 1301B — TITLE
- Section 1302B — RECOVERY OF CONSTRUCTION AND DEMOLITION DEBRIS
- Section 1303B — DEFINITIONS
- Section 1304B — PERMIT CONDITION
- Section 1305B — PERMIT NOTIFICATION
- Section 1301D — TITLE
- Section 1302D — PURPOSE
- Section 1303D — SCOPE
- Section 1304D — DEFINITIONS
- Section 1305D — COMPLIANCE REQUIREMENTS
- Section 1306D — LIGHTING EFFICIENCY MEASURES
- Section 1307D — ENFORCEMENT
- Section 1308D — RULES
- Section 1309D — UNDERTAKING FOR THE GENERAL WELFARE
- Section 1310D — PREEMPTION
- Section 1311D — SEVERABILITY
- Section 1402 — PERFORMANCE REQUIREMENTS
- Section 1501 — GENERAL
- Section 1502 — ROOF DRAINAGE
- Section 1505 — FIRE CLASSIFICATION
- Section 1511 — ROOF TOP STRUCTURES
- Section 1604 — GENERAL DESIGN REQUIREMENTS
- Section 1607 — LIVE LOADS
- Section 1704 — SPECIAL INSPECTIONS AND TESTS, CONTRACTOR RESPO…
- Section 1705 — REQUIRED SPECIAL INSPECTIONS AND TESTS
- Section 2304 — GENERAL CONSTRUCTION REQUIREMENTS
- Section 2405 — SLOPED GLAZING AND SKYLIGHTS
- Section 2603 — FOAM PLASTIC INSULATION
- Section 3010 — PRIVATE RESIDENCE ELEVATORS
- Section 3103 — TEMPORARY STRUCTURES
- Section 3107 — SIGNS
- Section 3116 — WOODBURNING APPLIANCES
- Section 3201 — GENERAL
- Section 3202 — ENCROACHMENTS
- Section 3203 — SIDEWALK CONSTRUCTION
- Section 3302 — CONSTRUCTION SAFEGUARDS
- Section 3303 — DEMOLITION
- Section 3304 — SITE WORK
- Section 3306 — PROTECTION OF PEDESTRIANS
- Section 3307 — PROTECTION OF ADJOINING PROPERTY
- Section 3311 — STANDPIPES
- Section J103 — PERMITS REQUIRED
- Section J104 — PERMIT APPLICATION AND SUBMITTALS
- Section J106 — EXCAVATIONS
- Section J109 — DRAINAGE AND TERRACING
- Section J112G — RADING FEES
- Section P101 — GENERAL
- Section P103 — EMERGENCY HOUSING
- Section P110 — EMERGENCY HOUSING FACILITIES SANITATION REQUIRE…
- Section P111 — EMERGENCY HOUSING FIRE AND LIFE SAFETY REQUIREM…
- Section P112 — ALTERNATIVES AND MODIFICATIONS
- 1604.4 Analysis. Any system or method of construction to be us…
- A401.1 Purpose
- A401.2 Scope. Omit.
- A403.1 General. All modifications required ... the building co…
- A403.2 Scope of analysis. This chapter requires the alteration…
- A403.3 Design base shear and design parameters. ... Despite an…
- A403.8 Horizontal diaphragms. The diaphragm immediately above …
- A405.1 New materials. New materials shall meet the requirement…
- 329.1 General.
- 329.2 Scope and Criteria
- 329.5 Voluntary Minimum Life-Safety Retrofit
- 10.1 Code-Based Site Classification
- 10.2 Ground Motion and Seismic Ground Deformation Characteriza…
- 10.3 Settlement Analysis
- 10.4 Sea Level Rise
- 10.5 Static and Seismic Design of Basement Walls
- 11.1 Driven Concrete and Steel Piles
- 11.2 Augered Cast-in-Place Piles
- 11.3 Drilled Shafts
- 13.1 Selection of Instrumentation and Monitoring Requirements
- 13.2 Pre-Construction Monitoring
- 13.3 Reporting
- 89.115 Add the following section:
- 89.115 Suppression. This code shall supersede all previous Ele…
- 89.116 Add the following section:
- 89.116 Maintenance. All electrical equipment, wiring and syste…
- 89.117 Add the following section:
- 89.117 Alternate Materials, Design and Methods of Construction.
- 89.118 Add the following section:
- 89.118 Change in Occupancy. Electrical equipment, wiring and s…
- 89.119 Add the following section:
- 89.119 Modifications. When there are practical difficulties in…
- 89.120 Add the following section:
- 89.120 Permits Required.
- 89.121 Add the following section:
- 89.121 Work Exempt from Permits. Electrical permits and fees s…
- 89.122 Add the following section:
- 89.122 Permit Issuance.
- 89.123 Add the following section:
- 89.123 Fees.
- 89.124 Add the following new section:
- 89.124 Powers and Duties of the Building Official.
- 89.125 Add the following section:
- 89.125 Violation. Any person, the owner or the owner’s authori…
- 89.126 Add the following section:
- 89.126 Unsafe Buildings or Structures. Any buildings, structur…
- 89.127 Add the following section:
- 89.127 Inspection.
- 89.128 Add the following section:
- 89.128 Survey. An electrical survey may be requested when an e…
- 89.129 Add the following section:
- 89.129 Board of Examiners. Application may be made to the Boar…
- 110.15 Revise this section as follows:
- 110.15 High-Leg Marking. On a 4-wire, delta-connected system w…
- 230.43 Revise this section as follows:
- 230.43 Wiring Methods for 1000 Volts, Nominal, or Less.
- 230.56 Revise this section as follows:
- 230.56 Service Conductor with the Higher Voltage to Ground. On…
- 230.71 Maximum Number of Disconnects.
- 250.50 Revise the first paragraph of this section as follows:
- 250.50 Grounding Electrode System. All grounding electrodes as…
- 300.37 Revise this section as follows:
- 300.37 Aboveground Wiring Methods. Aboveground conductors, 12K…
- 320.108 Revise this section as follows:
- 320.108 Equipment Grounding Conductor. Type AC cable shall pro…
- 330.12 Revise item (1) as follows:
- 330.12 Uses Not Permitted. Type MC cable shall not be used und…
- 330.108 Revise this section as follows:
- 330.108 Equipment Grounding Conductor. Where Type MC cable is …
- 334.10 Revise Item (2) as follows:
- 334.10 Uses permitted.
- 334.12 Add Items (11), (12) and (13) as follows:
- 334.12 Uses Not Permitted.
- 340.10 Revise Item (1) as follows:
- 340.10 Uses Permitted. Type UF cable shall be permitted as fol…
- 348.10 Revise this section as follows:
- 348.10 Uses Permitted. FMC shall be permitted to be used in [ …
- 350.10 Revise the first sentence as follows:
- 350.10 Uses Permitted. LFMC shall be permitted to be used [ ← …
- 352.10 Revise Item (A) as follows:
- 352.10 Uses Permitted. The use of PVC conduit shall be permitt…
- 355.10 Revise Item (A) as follows:
- 355.10 Uses Permitted. The use of RTRC shall be permitted in a…
- 356.10 Revise the first sentence of this section and item (5) …
- 356.10 Uses Permitted. LFNC shall be permitted to be used in e…
- 358.12 Add Item (3) as follows:
- 358.12 Uses Not Permitted. EMT shall not be used under the fol…
- 362.10 Revise Item 6 and delete Items 1, 2, 4, 5, 7, 8 and 9 a…
- 362.10 Uses Permitted. For the purpose of this article, the fi…
- 378.12 Add Item (6) as follows:
- 378.12 Uses Not Permitted. Nonmetallic wireways shall not be u…
- 411.5 Revise Section 411.5(A) as follows:
- 411.5 Specific Location Requirements.
- 760.46 Revise this section as follows:
- 760.46 NPLFA Circuit Wiring. Installation of non-power-limited…
- 760.180 Add the following new section:
- 760.180 System Requirements.
- Section 304 — STRUCTURAL DESIGN LOADS AND EVALUATION AND DESIGN
- Section 314 — EXISTING HIGH-RISE BUILDINGS [SFM]
- Section 324 — RESERVED
- Section 325 — RESERVED
- Section 326 — EXISTING BUILDINGS OR OTHER STRUCTURES LOCATED O…
- Section 327 — WORK PRACTICES FOR LEAD-BASED PAINT ON PRE-1979 …
- Section 328 — ASBESTOS INFORMATION AND NOTICE
- Section 329 — EARTHQUAKE EVALUATION OF PRIVATE SCHOOL STRUCTURES
- 405.2 Revise this section as follows:
- 405.2 Repairs to damaged buildings. Repairs to damaged buildin…
- Section 501 — GENERAL
- Section 502 — ADDITIONS
- Section 503 — ALTERATIONS
- Section 506 — CHANGE OF OCCUPANCY
- Section 508 — MOVED STRUCTURES
- Section 501B — PURPOSE
- Section 502B — SCOPE
- Section 503B — DEFINITIONS
- Section 504B — COMPLIANCE REQUIREMENTS
- Section 505B — ADMINISTRATION
- Section 506B — EXISTING UTILITY, FIRE PROTECTION, LIFE-SAFETY …
- Section 507B — ENERGY CONSERVATION
- Section 501C — PURPOSE
- Section 502C — SCOPE
- Section 503C — DEFINITIONS
- Section 504C — SYMBOLS AND NOTATIONS
- Section 505C — GENERAL REQUIREMENTS
- Section 506C — MATERIALS REQUIREMENTS
- Section 507C — QUALITY CONTROL
- Section 508C — ALLOWABLE DESIGN VALUES
- Section 509C — SELECTION OF PROCEDURE
- Section 510C — GENERAL PROCEDURE
- Section 511C — SPECIAL PROCEDURE
- Section 512C — ANALYSIS AND DESIGN
- Section 513C — DETAILED SYSTEM DESIGN REQUIREMENTS
- Section 514C — IN-PLACE MASONRY SHEAR TESTS
- Section 515C — TEST OF ANCHORS IN UNREINFORCED MASONRY WALLS
- Section 516C — POINTING OF UNREINFORCED MASONRY WALLS
- Section 501D — GENERAL
- Section 502D — CORRECTION OF HAZARDOUS PARAPETS AND APPENDAGES
- Section 503D — VARIANCE PROCEDURE
- Section 504D — UNREINFORCED MASONRY PARAPETS AND APPENDAGES
- Section 501E — PURPOSE AND INTENT
- Section 502E — SCOPE
- Section 503E — DEFINITIONS
- Section 504E — COMPLIANCE REQUIREMENTS
- Section 505E — PROGRAM IMPLEMENTATION AND ADMINISTRATION; FEE
- Section 506E — ENGINEERING CRITERIA FOR EVALUATION AND RETROFIT.
- Section 501F — GENERAL REQUIREMENTS AND SCOPE
- Section 502F — DEFINITIONS
- Section 503F — INSPECTION SCHEDULE
- Section 504F — FACADE INSPECTION AND MAINTENANCE CRITERIA AND …
- Section 505F — INSPECTION REPORTS.
- Section 506F — FEES
- Section 507F — COMPLIANCE, ENFORCEMENT AND ABATEMENT.
- 501G.1 Intent. This Chapter 5G is intended to advance public s…
- 501G.2 Definitions. In addition to the definitions in San Fran…
- 501G.3 Subject Buildings. The building inventory assessment re…
- 501G.4 Exemptions for Certain Concrete Buildings. Concrete Bui…
- 502G.1 Screening Process. The owner of each subject building s…
- 502G.2 Screening Form. Within six months of the effective date…
- 502G.3 Concrete Building Website. The Department shall maintai…
- Section 101 — GENERAL
- Section 202 — DEFINITIONS
- Section 301 — GENERAL
- Section 302 — MIXED OCCUPANCY BUILDINGS
- Section 303 — PHASED PROJECTS
- Section 304 — VOLUNTARY TIERS
- Section 305 — [OSHPD 1] – CALGREEN TIER 1 AND CALGREEN TIER 2
- Section 306 — [ ← ] – VOLUNTARY MEASURES
- Section 4.101 — GENERAL
- 4101.1 Revise the section as follows:
- Section 4.104 — [ ← ] HISTORIC PRESERVATION
- Section 4.105 — [ ← ] DEMOLITION OF EXISTING STRUCTURES
- Section 4.106 — SITE DEVELOPMENT
- Section 4.201 — GENERAL
- Section 5.101 — GENERAL
- Section 5.103 — [ ← ] – REQUIREMENTS FOR GROUP A, B, I, E and …
- Section 5.104 — [ ← ] – HISTORIC PRESERVATION
- Section 5.105 — [ ← ] DEMOLITION OF EXISTING STRUCTURES
- Section 5.106 — SITE DEVELOPMENT
- Section 5.201 — GENERAL
- Section 701 — GENERAL
- Section 702 — QUALIFICATIONS
- 703.1 Modify the section as follows:
- 703.1 Documentation. Documentation used to show compliance wit…
- Section 101.0 — TITLE
- 101.1 Revise this section as follows:
- 101.1 Title. This document shall be known as the [ ← ] 2022 Sa…
- Section 103.0 — DUTIES AND POWERS OF THE AUTHORITY HAVING JURI…
- 103.1 Revise the first paragraph as follows:
- 103.1 General. The Authority Having Jurisdiction shall be the …
- 103.4 Revise the first paragraph as follows:
- 103.4 Right of Entry. [ ← ] When it is necessary to make an in…
- 103.5 Add the following section:
- 103.5 Authority Having Jurisdiction May Adopt Rules and Regula…
- 103.6 Add the following section:
- 103.6 Code Revisions. The Authority Having Jurisdiction shall …
- Section 104.0 — PERMITS
- 104.2 Add item (6) as follows:
- 104.3 Replace this section as follows:
- 104.3 Application for Permit. [ ← ] Applications for permits t…
- 104.4 Replace this section as follows:
- 104.4 Permit Issuance. [ ← ] Permit processing and issuance fo…
- 104.5 Replace this entire section including subsections with t…
- Section 106.0 — VIOLATIONS AND PENALTIES
- 106.0 Add the following three sections:
- 106.7 Violations. Any person, the owner or the owner’s authori…
- 106.8 Any person, the owner or the owner’s authorized agent, w…
- 106.9 It shall be unlawful for any person to interfere with th…
- Section 107.0 — BOARD OF APPEALS
- 107.0 Replace this title and entire section as follows:
- 107.0 [ ← ] Board of Examiners. Applicants may appeal decision…
- Section 302.2 — ALTERNATE MATERIALS AND METHODS OF CONSTRUCTION
- Section 504.3 — DOMESTIC RANGE
- 504.3 Add a second paragraph as follows:
- Section 802.2 — CONNECTION TO VENTING SYSTEMS
- Section 802.6 — GAS VENTS
- Section 802.8 — THROUGH-THE-WALL VENT TERMINATIONS
- 802.8 Revise the first sentence of this section and add an exc…
- 802.8 Through-the-Wall Vent Termination. A mechanical draft ve…
- Section 925.0 — INCINERATORS AND CREMATORIES
- 925.1 Add the following sentence as a second paragraph:
- Section 1013.0 — INSPECTIONS AND TESTS
- 1013.1 Revise this section as follows:
- 1013.1 General. An installation for which a permit is required…
- 1013.2 Revise this section as follows:
- 1013.2 Operating Permit.
- 1013.3 Revise this section as follows:
- 1013.3 Maintenance Inspection. The Authority Having Jurisdicti…
- 1013.7 Revise the second paragraph as follows:
- Section 101.0 — GENERAL
- 101.1 Revise this section as follows:
- 101.1 Title. This document shall be known as the “ [ ← ] 2022 …
- Section 103.0 — DUTIES AND POWERS OF THE AUTHORITY HAVING JURI…
- 103.1 Replace the third paragraph with the following:
- 103.4 Revise the first paragraph of this section as follows:
- 103.4 Right of Entry. Where it is necessary to make an inspect…
- 103.5 Add the following section:
- 103.5 Rules and Regulations. The Authority Having Jurisdiction…
- 103.6 Add the following section:
- 103.6 Code Revisions. The Authority Having Jurisdiction shall …
- 103.7 Add the following section:
- 103.7 Modifications. When there are practical difficulties inv…
- Section 104.0 — PERMITS
- 104.1 Add the following as the second paragraph of this section:
- 104.2 Replace Section 104.2(1) and the first paragraph of Sect…
- 104.2 Exempt Work. A permit shall not be required for the foll…
- 104.3 Replace this section as follows:
- 104.3 Application for Permit. [ ← ] Permit applicants shall fi…
- 104.4 Add a new second paragraph to this section as follows:
- 104.5 Replace this section as follows:
- 104.5 Permit Fees. [ ← ] Before any permit is issued, the appl…
- Section 105.0 — INSPECTIONS AND TESTING
- Section 106.0 — VIOLATIONS AND PENALTIES
- 106.3 Replace this section as follows:
- 106.3 Penalties. [ ← ] Any person, the owner or the owner’s au…
- 106.5 Revise this section as follows:
- 106.5 Authority to Disconnect Utilities in Emergencies. The Au…
- Section 107.0 — BOARD OF APPEALS
- 107.0 Replace this title and the entire section as follows:
- Section 108.0 — ABATEMENT OF PUBLIC NUISANCE
- 108.0 Abatement of Public Nuisance. In order to abate a nuisan…
- Section 109.0 — REPAIRS TO DEFECTIVE BUILDING SEWERS
- 109.0 Repairs to Defective Building Sewers
- 109.1 General. Any defective building sewer found to be a nuis…
- 109.2 Cost of Repairs by City and County of San Francisco. Whe…
- 109.3 Plumbing Building Sewer Revolving Fund. A special revolv…
- 109.4 Assessment for Costs. The Authority Having Jurisdiction …
- Section 201.0 — GENERAL
- 201.1 Add the following to the end of the first sentence:
- Section 204.0 — B
- 204.0 Add the following definition:
- Section 208.0 — F
- 208.0 Add the following definition:
- Section 216.0 — N
- Section 218.0 — P
- 218.0 Revise this definition as follows:
- Section 221.0 — S
- 221.0 Add the following definition:
- Section 313.0 — HANGERS AND SUPPORTS
- 313.9 Add the following section:
- 313.9 Materials.
- Section 405 — PROHIBITED FIXTURES
- Section 415.0 — DRINKING FOUNTAINS
- 415.2 Add the following section:
- Section 504.0 — WATER HEATER REQUIREMENTS
- 504.1 Add the following as the first paragraph of this section:
- 504.1 Location. Water Heaters mounted on the exterior of a bui…
- Section 603.0 — CROSS-CONNECTION CONTROL
- 603.1 Add a third paragraph to this section as follows:
- 603.2 Revise Table 603.2 as follows:
- Section 604.0 — MATERIALS
- 604.1 Add the following sentence to the end of the second para…
- Section 606.0 — VALVES
- 606.2 Revise this section as follows:
- 606.2 Fullway Valve. A fullway valve controlling outlets shall…
- 606.3 Revise this section as follows:
- 606.3 Multidwelling Units. In multidwelling units, one or more…
- 606.5 Revise this section as follows:
- 606.5 Control Valve. A control valve shall be installed immedi…
- 606.11 Add the following section:
- 606.11 Backflow Assembly. All buildings four stories or more i…
- Section 609.0 — INSTALLATION, TESTING, UNIONS AND LOCATION
- Section 701.0 — GENERAL
- Section 706.0 — CHANGES IN DIRECTION OF DRAINAGE FLOW
- 706.4 Revise this section as follows:
- 706.4 Vertical to Horizontal. Vertical drainage lines connecti…
- Section 710.0 — DRAINAGE OF FIXTURES LOCATED BELOW THE NEXT UP…
- Section 901.0 — GENERAL
- 901.1 Add the following second paragraph to this section:
- Section 907.0 — VENT STACKS AND RELIEF VENTS
- 907.1 Revise the first sentence of this section as follows:
- 907.1 Drainage Stack. Each drainage stack that extends [ ← ] s…
- 907.3 Add the following section:
- 907.3 Vent Stacks and Relief Vents. Every building in which pl…
- Section 911.0 — CIRCUIT VENTING
- 911.0 Revise this section as follows:
- 911.0 Circuit Venting. Circuit venting is not permitted unless…
- 1001.3 Add the following section:
- 1001.3 Placement and Minimum Size of Building Traps. The build…
- Section 1008.0 — BUILDING TRAPS
- 1008.1 Revise this section as follows:
- 1008.1 General. Building traps shall not be installed except w…
- Section 1016.0 — SAND INTERCEPTORS
- 1016.3 Add the following section:
- Section 1101.0 — GENERAL
- Section 1208.0 — GAS PIPING SYSTEM DESIGN, MATERIALS, AND COMP…