Skip to content

Section 110A — SCHEDULE OF FEE TABLES

San Francisco Building Inspection Commission Codes · 2022 edition · updated 2026-07-25 · San Francisco

1A-A Building Permit Fees

1A-B Other Building Permit and Plan Review Fees

1A-C Plumbing/Mechanical Permit Issuance and Inspection Fees

1A-D Standard Hourly Rates

1A-E Electrical Permit Issuance and Inspection Fee Schedule

1A-F Reserved

1A-G Inspections, Surveys and Reports

  1. Standard Inspection Fee

  2. Off-Hours Inspection

  3. Pre-Application Inspection

  4. Reinspection Fee

  5. Report of Residential Records (3R)

  6. Survey of Nonresidential Buildings

  7. Survey of Residential Buildings for any Purpose or Condominium Conversion

  8. Temporary Certificate of Occupancy

1A-H Reserved

1A-I Reserved

1A-J Miscellaneous Fees

  1. Central Permit Bureau Processing Fee

  2. Building Numbers

  3. Extension of Time: Application Cancellation and Permit Expiration

  4. Product Approvals

  5. California Building Standards Commission Fee

  6. Vacant Building

1A-K Penalties, Hearings, Code Enforcement Assessments

  1. Abatement Appeals Board Hearing, Filing Fee

  2. Board of Examiners Filing Fees

  3. Building Official's Abatement Orders

  4. Emergency Order

  5. Exceeding the Scope of the Approved Permit

  6. Access Appeals Commission Filing Fee

  7. Lien Recordation Charges

  8. Work without Permit: Investigation Fee; Penalty

  9. Building Commission Hearing Fees

  10. Additional Hearings Required by Code

  11. Violation Monitoring

  12. Failure to Register Vacant Storefront

1A-L Public Information

  1. Public Notification and Record Keeping Fees

  2. Demolition

  3. Notices

  4. Reproduction and Dissemination of Public Information

  5. Replacement of Approved Plans/Specifications

  6. Records Retention Fee

1A-M Reserved

1A-N Energy Conservation

1A-O Reserved

1A-P Residential Code Enforcement and License Fees

1A-Q Hotel Conversion Ordinance Fees

1A-R Refunds

1A-S Unreinforced Masonry Building Retrofit

TABLE 1A-A – BUILDING PERMIT FEES

1, 3
NEW CONSTRUCTION
1, 2, 3
ALTERATIONS
1, 2, 3
NO PLANS
TOTAL VALUATION PLAN REVIEW FEE PERMIT ISSUANCE
FEE
PLAN REVIEW FEE PERMIT ISSUANCE
FEE
PERMIT ISSUANCE
FEE
$1 to $2,000 $182 for the first $500
plus $10 for each
additional $100 or fraction
thereof, to and including
$2,000
$161 for the first $500
plus $5.13 for each
additional $100 or fraction
thereof, to and including
$2,000
$182 for the first $500
plus $9.47 for each
additional $100 or fraction
thereof, to and including
$2,000
$169 for the first $500
plus $3.67 for each
additional $100 or fraction
thereof, to and including
$2,000
$195 for the first $500
plus $6.47 for each
additional $100 or fraction
thereof, to and including
$2,000
$2,001 to $50,000 $332 for the first $2,000
plus $20.46 for each
additional $1,000 or
fraction thereof, to and
including $50,000
$238 for the first $2,000
plus $6.54 for each
additional $1,000 or
fraction thereof, to and
including $50,000
$324 for the first $2,000
plus $27.83 for each
additional $1,000 or
fraction thereof, to and
including $50,000
$224 for the first $2,000
plus $6.83 for each
additional $1,000 or
fraction thereof, to and
including $50,000
$292 for the first $2,000
plus $9.40 for each
additional $1,000 or
fraction thereof, to and
including $50,000
$50,001 to $200,000 $1,314 for the first
$50,000 plus $13.15 for
each additional $1,000 or
fraction thereof, to and
including $200,000
$552 for the first $50,000
plus $5.88 for each
additional $1,000 or
fraction thereof, to and
including $200,000
$1,660 for the first
$50,000 plus $16.31 for
each additional $1,000 or
fraction thereof, to and
including $200,000
$552 for the first $50,000
plus $5.88 for each
additional $1,000 or
fraction thereof, to and
including $200,000
$743 for the first $50,000
plus $4.61 for each
additional $1,000 or
fraction thereof, to and
including $200,000
$200,001 to $500,000 $3,286 for the first
$200,000 plus $8.12 for
each additional $1,000 or
fraction thereof, to and
including $500,000
$1,434 for the first
$200,000 plus $4.55 for
each additional $1,000 or
fraction thereof, to and
including $500,000
$4,106 for the first
$200,000 plus $13.53 for
each additional $1,000 or
fraction thereof, to and
including $500,000
$1,434 for the first
$200,000 plus $4.55 for
each additional $1,000 or
fraction thereof, to and
including $500,000
$1,434 for the first
$200,000 plus 4.55 for
each additional $1,000 or
fraction thereof, to and
including $500,000
$500,001 to $1,000,000 $5,721 for the first
$500,000 plus $8.51 for
each additional $1,000 or
fraction thereof, to and
including $1,000,000
$2,798 for the first
$500,000 plus $3.46 for
each additional $1,000 or
fraction thereof, to and
including $1,000,000
$8,165 for the first
$500,000 plus $9.67 for
each additional $1,000 or
fraction thereof, to and
including $1,000,000
$2,798 for the first
$500,000 plus $3.46 for
each additional $1,000 or
fraction thereof, to and
including $1,000,000
$2,798 for the first
$500,000 plus $3.46 for
each additional $1,000 or
fraction thereof, to and
including $1,000,000

NEW CONSTRUCTION [1, 3] ALTERATIONS [1, 2, 3] NO PLANS [1, 2, 3]

TOTAL VALUATION PLAN REVIEW FEE PERMIT ISSUANCE
FEE
PLAN REVIEW FEE PERMIT ISSUANCE
FEE
PERMIT ISSUANCE
FEE
$1,000,001 to $5,000,000 $9,976 for the first
$1,000,000 plus $6.29 for
each additional $1,000 or
fraction thereof, to and
including $5,000,000
$4,527 for the first
$1,000,000 plus $2.87 for
each additional $1,000 or
fraction thereof, to and
including $5,000,000
$12,998 for the first
$1,000,000 plus $8.38 for
each additional $1,000 or
fraction thereof, to and
including $5,000,000
$4,527 for the first
$1,000,000 plus $2.87 for
each additional $1,000 or
fraction thereof, to and
including $5,000,000
$4,527 for the first
$1,000,000 plus $2.87 for
each additional $1,000 or
fraction thereof, to and
including $5,000,000
$5,000,001.00 (5M) to
$50,000,000
$35,117 for the first
$5,000,000 plus $2.66 for
each additional $1,000 or
fraction thereof
$16,000 for the first
$5,000,000 plus $1.49 for
each additional $1,000 or
fraction thereof
$46,532 for the first
$5,000,000 plus $2.57 for
each additional $1,000 or
fraction thereof
$16,000 for the first
$5,000,000 plus $1.49 for
each additional $1,000 or
fraction thereof
$16,000 for the first
$5,000,000 plus $1.49 for
each additional $1,000 or
fraction thereof
$50,000,001 to
$100,000,000
$154,996 for the first
$50,000,000 plus $2.17 for
each additional $1,000 or
fraction thereof
$83,121 for the first
$50,000,000 plus $1.71 for
each additional $1,000 or
fraction thereof
$162,132 for the first
$50,000,000 plus $2.84 for
each additional $1,000 or
fraction thereof
$83,121 for the first
$50,000,000 plus $1.71 for
each additional $1,000 or
fraction thereof
$83,121 for the first
$50,000,000 plus $1.71 for
each additional $1,000 or
fraction thereof
$100,000,001 to
$200,000,000
$263,263 for the first
$100,000,000 plus $2.68
for each additional $1,000
or fraction thereof
$168,553 for the first
$100,000,000 plus $2.69
for each additional $1,000
or fraction thereof
$304,022 for the first
$100,000,000 plus $2.87
for each additional $1,000
or fraction thereof
$168,553 for the first
$100,000,000 plus $2.69
for each additional $1,000
or fraction thereof
$168,553 for the first
$100,000,000 plus $2.69
for each additional $1,000
or fraction thereof
$200,000,001 and up $531,050 for the first
$200,000,000 plus $2.68
for each additional $1,000
or fraction thereof
$437,894 for the first
$200,000,000 plus $2.69
for each additional $1,000
or fraction thereof
$90,988 for the first
$200,000,000 plus $2.87
for each additional $1,000
or fraction thereof
$437,894 for the first
$200,000,000 plus $2.69
for each additional $1,000
or fraction thereof
$437,894 for the first
$200,000,000 plus $2.69
for each additional $1,000
or fraction thereof

NOTES:

  1. These permit fees do not include other fees that may be required by other Departments: Public Works, Planning, Fire, Public Health, etc., nor do they include plumbing, electrical, or mechanical permit fees unless so stated in the other fee tables.

  2. A surcharge of $5.00 shall be added to those alteration permits sought for buildings classified as R3 (one/two-family dwelling) and E3 (licensed day care) that were constructed prior to 1979 to implement the interior lead safe work practices provisions of Section 327 et seq. of this Code.

  3. All permit fees, including inspection fees, related to reviewing the structural integrity of awning replacements for permits submitted “over the counter” at the Central Permit Bureau are hereby waived for any Small Business that applies for a permit for such activities during the month of May. For purposes of this Section, a Small Business shall be a business with a total workforce of 100 or fewer fulltime employees. To the extent this provision for Small Business Month Fee Waivers differs from the description in subsection (f) on page 43 of Ordinance No. 149-16, this provision governs.

(Amended by Ord. 103-23, File No. 230212, App. 6/2/2023, Eff. 7/3/2023, Retro. 5/1/2023; Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 189-23, File No. 230559, App. 9/15/2023, Eff. 10/16/2023, Retro. 5/1/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

Editor's Notes:

Ordinance 92-20, File No. 200113, approved 6/26/2020, effective 7/27/2020, and retroactive to 1/1/2020, provides, in part:

“Notwithstanding any provision of the Building Code, including the fee schedules of Tables 1A-A and 1A-E, the Plan Review Fee related to reviewing permit applications, or a portion of a permit application, seeking to legalize existing dwelling units that were constructed without the required permits is hereby waived for any permit issued for such activities between January 1, 2020 and December 31, 2024, inclusive; provided that other fees, including but not limited to fees for applications to undertake structural work or excavation activities or any fees required by State law, shall not be waived.”

See Section 2(b) of the ordinance.

Ordinance 146-15 provides in part as follows:

Notwithstanding any provision of the Building Code, including the fee schedules of Tables 1A-A and 1A-E, the Plan Review Fee related to reviewing permit applications, or a portion of a permit application, seeking to legalize existing dwelling units that were constructed without the required permits is hereby waived for any permit issued for such activities prior to January 1, 2020; provided that other fees, including but not limited to fees for applications to undertake structural work or excavation [activities] or any fees required by State law, shall not be waived.

TABLE 1A-B – OTHER BUILDING PERMIT AND PLAN REVIEW FEES

1. Plan Review Fees Not Covered in Table 1A-A: $399 per hour (Minimum One Hour)
2.   Back Check Fee: $399 per hour (Minimum One Hour)
3.   Pre-application Plan Review Fee: $368 per hour - Minimum Four Hours Per Project
4.   Reduced Plan Review Fee: 50% of the Plan Review Fee
5.   Sign Plan Review Fee: See Table 1A-A – Building Permit Fees
6.   Site Permit Fee: 25% of Plan Review Fee based on Table 1A-A . Minimum fee $500
7.   Premium Plan Review Fee– Submitted application: 50% of Plan Review Fee plus $1,000
8.   Third-Party Experts and Other Permit Related Actions Fee: Actual costs that the Department incurs in administering and processing the action or
procedure on a time and materials basis.

NOTES:

  1. See Table 1A-D – Standard Hourly Rates.

  2. “Back check” is defined as: (1) that time spent reviewing applicant-initiated revisions to plans that do not affect the valuation, scope or size of

the project; or (2) any additional plan review performed on required corrections to plans beyond the standard review process, as determined by the Building Official. Plan review required for applicant-initiated revisions affecting valuation, scope, or size of project may be assessed a new plan review fee in addition to the initial plan review fee as determined by the Building Official.

(Amended by Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-C – PLUMBING/MECHANICAL PERMIT ISSUANCE AND INSPECTION FEES

A. Permit applicants shall show a complete itemization of the proposed scope of work and select the appropriate fee category.

B. A separate permit is required for each structure, condominium unit, existing apartment unit, high-rise office floor, suite, or tenant space.

C. Hourly issuance/inspection rates of $405 per hour for regular inspections and $477 per hour (minimum two hours) for off-hour inspections will

apply for installations not covered by the fee categories below.

D. Fees shall be paid in full prior to approval for occupancy, job card signature, gas tags, or final signoff, as applicable.

E. See Table 1A-R for refund policy.

Permit Issuance Fees by Category:

CATEGORY 1P Single Residential Unit – water service, sewer replacement, single plumbing fixture installation, shower pan
installation, or kitchen or bathroom remodels
$276
CATEGORY 1M Single Residential Unit – mechanical gas appliance (furnace, hydronic heat, heat pump) $267
CATEGORY 2PA Plumbing installation for residential construction with 6 or less dwelling units or guest rooms; without underground
plumbing installation (includes water, gas, waste, and vent)
$483
CATEGORY 2PB Plumbing installation for residential construction with 6 dwelling units or guest rooms or less; with underground
plumbing installation (includes water, gas, waste, and vent)
$701
CATEGORY 2M Mechanical gas appliances for residential construction with 6 dwelling units or guest rooms or less $400
CATEGORY 3PA 7 – 12 Dwelling Units $991
CATEGORY 3PB 13 – 36 Dwelling Units $1,982
CATEGORY 3PC Over 36 Dwelling Units $7,989
CATEGORY 3MA 7 – 12 Dwelling Units $996
CATEGORY 3MB 13 – 36 Dwelling Units $1,980
CATEGORY 3MC Over 36 Dwelling Units $8,403
CATEGORY 4PA Fire sprinklers – one and two family dwelling units $267
CATEGORY 4PB Fire sprinklers – 3 or more dwelling units or guest rooms, commercial and office – per floor $348
CATEGORY 5P/5M Office, mercantile & retail buildings: New or Tenant Improvements; heating/cooling equipment to piping connected
thereto – per tenant or per floor, whichever is less
$582
CATEGORY 6PA Restaurants (new and remodel) fee includes 5 or less drainage and or gas outlets – no fees required for public or
private restroom
$543
CATEGORY 6PB Restaurants (new and remodel) fee includes 6 or more drainage and/or gas outlets – no fees required for public or
private restroom
$1,525
CATEGORY 8 New boiler installations over 200 kbtu $484
CATEGORY 9P/M Surveys $507
CATEGORY 10P/M Condominium conversions $617
CATEGORY 11P/M Miscellaneous $310
Boiler Maintenance Program
Permit to operate or renew
(certificate issued) – Online
$122
Permit to operate or renew
(certificate issued) – In-House
$208
Connection to utility company-provided steam (includes permit to operate) Connection to utility company-provided steam (includes permit to operate) $208 per hour
(Minimum One-Half
Hour)
Renewal required: Renewal required:
1.   Low-pressure boilers every 12 months. (See definition of low-pressure boilers in Chapter 2.)
2.   Water heaters when alteration or replacement permits are issued.

A permit may include more than one category, and each category will be charged separately.

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-D – STANDARD HOURLY RATES

  1. Plan Review $481 per hour

  2. Inspection $571 per hour, $742 per hour for off-hour inspection

  3. Administration $298 per hour

  4. Housing Inspection $596 per hour

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff.

9/1/2025)

TABLE 1A-E – ELECTRICAL PERMIT ISSUANCE AND INSPECTION FEE SCHEDULE

A. Permit applicants are required to itemize the proposed scope of work and select the appropriate category and fee amount.

B. Separate permits are required for each structure, condominium unit, existing dwelling unit (except in R3 occupancies), common area, commercial office floor or

individual tenant space.

C. Hourly permit issuance/inspection rates of $405 per hour for regular inspections and $477 per hour (minimum two hours) for off-hour

inspections shall apply for installations not covered by this fee schedule.

D. Fees shall be paid in full prior to obtaining: occupancy approval, job card signature, permission to energize, or final signoff, as applicable.

E. For the purpose of fee calculation: appliances and utilization equipment each count as one outlet or device in addition to receptacles, switches, and light outlets.

F. All permit fees, including inspection fees, related to reviewing the installation of pedestrian level lighting are hereby waived for any Small

Business that applies for a permit for such activities during the month of May. For purposes of this Section, a Small Business shall be a business with a total workforce of 100 or fewer fulltime employees. To the extent this provision for Small Business Month Fee Waivers differs from the description in subsection (f) on page 43 of Ordinance No. 149-16, this provision governs.

See Table 1A-R for refund policy.

See Table 1A-J for permit extensions.

Category 1

General Wiring: Residential Buildings up to 10,000 sq. ft.

Up to 10 outlets and/or devices $273
11 to 20 outlets and/or devices $426
Up to 40 outlets and/or devices, includes up to 200 Amp service upgrade $534
* More than 40 outlets and/or devices $734
* Buildings of 5,000 to 10,000 sq. ft. $1,066

Category 2

General Wiring: Nonresidential Buildings & Residential Buildings over 10,000 sq. ft.

Up to 5 outlets and/or devices $410
6 to 20 outlets and/or devices $630
* Areas up to 2,500 sq. ft. $855
* 2,501 to 5,000 sq. ft. $1,251
* 5,001 to 10,000 sq. ft. $2,119
* 10,001 to 30,000 sq. ft. $4,177
* 30,001 to 50,000 sq. ft. $8,528
* 50,001 to 100,000 sq. ft. $12,669
* 100,001 to 500,000 sq. ft. $25,683
* 500,001 to 1,000,000 sq. ft. $57,026
* More than 1,000,000 sq. ft. $113,993
* Includes Category 3 & 4 installations in new buildings or major remodel work

Category 3

Service Distribution and Utilization Equipment

Includes: Generators, UPS, Transformers and Fire Pumps

(Use Category 3 for installations separate from the scope of work in Categories 1 or 2)

225 amps rating or less $397
250 to 500 amps $609
600 to 1000 amps $822
1,200 to 2,000 amps $1,248
More than 2,000 amps $1,619
600 volts or more $1,672
150 kva or less $398
151 kva or more $609
Fire Pump installations $824

Category 4

Installations of Fire Warning and Controlled Devices

(Use Category 4 for installations separate from the scope of work in Categories 1 or 2)

Up to 2,500 sq. ft. $461
2,501 to 5,000 sq. ft. $680
5,001 to 10,000 sq. ft. $1,251
10,001 to 30,000 sq. ft. $2,067
30,001 to 50,000 sq. ft. $4,212
50,001 to 100,000 sq. ft. $8,319
100,001 to 500,000 sq. ft. $12,211
500,001 to 1,000,000 sq. ft. $27,749
More than 1,000,000 sq. ft. $55,697

Fire Warning and Controlled Devices (Retrofit Systems)

Buildings of not more than 6 dwelling units $624
Buildings of not more than 12 dwelling units $842
Buildings with more than 12 dwelling units and non-residential occupancy
Building up to 3 floors $1,226
4–9 floors $2,497
10–20 floors $4,203
21–30 floors $8,319
More than 30 floors $12,211

Category 5

Miscellaneous Installations

Equipment.
Remodel/Upgrade of Existing Hotel Guest/SRO Rooms
Up to 6 rooms $525
Each additional group of 3 rooms $264
Data, Communications, and Wireless System
10 cables or less Exempt
11 to 500 cables $283
Each additional group of 100 cables $68
Security Systems, 10 components or less $283
Each additional group of 10 components $43
Includes installations and devices that interface with life safety systems; excludes installations in R3
Occupancies
Office Workstations, 5 or less $283
Each additional group of 10 workstations $97
Temporary Exhibition Wiring, 1 to 100 booths (1 inspection) $411
Each additional group of 10 booths $68
Exterior Electrical Sign $283
Interior Electrical Sign $283
Each Additional Sign, at the same address $86
Garage Door Operator (Requiring receptacle installation) $284
Quarterly Permits $650
Maximum five outlets in any one location
Survey, per hour or fraction thereof $284
Survey, Research, and Report preparation, per hour or fraction thereof $536
Witness Testing: life safety, fire warning, emergency, and energy management systems
Hourly Rate $430
Off-hour inspections hourly rate: (two hour minimum) $477
Energy Management, HVAC Controls, and Low-Voltage Wiring Systems
1–10 floors (3 inspections) $860
Each additional floor $97
Solar Photovoltaic Systems
10 KW rating or less $283
Each additional 10 KW rating $238

(Amended by Ord. 103-23, File No. 230212, App. 6/2/2023, Eff. 7/3/2023, Retro. 5/1/2023; Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 189-23, File No. 230559, App. 9/15/2023, Eff. 10/16/2023, Retro. 5/1/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

Editor's Notes

Ordinance 92-20, File No. 200113, approved 6/26/2020, effective 7/27/2020, and retroactive to 1/1/2020, provides, in part:

“Notwithstanding any provision of the Building Code, including the fee schedules of Tables 1A-A and 1A-E, the Plan Review Fee related to reviewing permit applications, or a portion of a permit application, seeking to legalize existing dwelling units that were constructed without the required permits is hereby waived for any permit issued for such activities between January 1, 2020 and December 31, 2024, inclusive; provided that other fees, including but not limited to fees for applications to undertake structural work or excavation activities or any fees required by State law, shall not be waived.”

See Section 2(b) of the ordinance.

TABLE 1A-F – RESERVED

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; removed by Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-G – INSPECTIONS, SURVEYS AND REPORTS

1. Hourly Rate $405 per hour
2.    Off-hours inspection $477 per hour - Minimum Two Hours plus permit fee
3.    Survey inspection $405 per hour - Minimum Two Hours
4.    Re-inspection fee $405 per hour
5.   Survey of nonresidential buildings: $405 per hour - Minimum Two Hours
6.    Survey of residential buildings for any purpose or Condo
Conversions:
Single unit $3,700
Two to four units $4,738
Five + units $5,159 plus Standard Hourly Inspection Rate
Hotels:
Includes 10 guestrooms $3,541
11 + guestrooms $4,068 plus $114 per guestroom over 10
7.    Temporary Certificate of Occupancy $670
8.   Demolition Permit Fee $646
9.   House Moving Permit Fee $405 per hour (Three Hour Minimum)
10.   Grading Permit Fee See Table 1A-A for New Construction fees
11.   Re-roofing Permit Fee
Single-Family Homes and Duplexes $309
For all others $509
12. Construction of impervious surface in the required front and
setback area
$229
13.   Night Noise Permit $670

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-H – RESERVED

(Removed by Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024)

TABLE 1A-I – RESERVED

TABLE 1A-J – MISCELLANEOUS FEES

1. General Administrative Fees Not Covered in Section 110A $226 per hour - Minimum One-Half Hour
2.    Building numbers (each entrance) $317 New addresses
$506 Change of existing addresses or lot numbers
3.    Extension of time for application cancellation and permit
expiration:
Each application extension (in plan review) $526 each plus 20% of Plan Review Fees
Each permit extension $452 each plus 10% of Building Permit Inspection Fees
4.   California Building Standards Commission Fee Pursuant to the provisions of California Health and Safety Code
Sections 18930.5, 18931.6, 18931.7 and 18938.39, $4 per $100,000 in
valuation, as determined by the Building Official, with appropriate
fractions thereof, but not less than $1.
5.   Strong Motion Instrumentation Program Fee
Group R Occupancies of 3 stories or less, except hotels and motels 0.00013 times the valuation
Hotels and motels, all buildings greater than 3 stories, all occupancies
other than Group R
0.00024 times the valuation
Minimum fee $1.60
6.   Subdivision $692
7.   Slope and Seismic Hazard Zone Protection Act $2,888
8.   Local Equivalency Fee $481 per hour (Minimum Quarter Hour)

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-K – PENALTIES, HEARINGS, CODE ENFORCEMENT ASSESSMENTS

1. Abatement Appeals Board hearing, filing fee $534 per case
2.    Board of Examiners filing fees:
Each appeal for variance from interpretation of code requirements $372 per hour Minimum Four Hours
Each appeal for approval of substitute materials or methods of
construction
$372 per hour Minimum Four Hours
3.    Building Official’s abatement order hearing $372 per hour Minimum Four Hours
4.    Emergency order $497 per hour Minimum Two Hours
5.    Exceeding the scope of the approved permit 2 times the Permit Issuance Fee
6.    Access Appeals Commission:
Filing fee $471 per hour - Minimum Two Hours per appeal
Request for a rehearing $471 per hour - Minimum Two Hours
7. Lien recordation charges $372 or 10% of the amount of the unpaid balance, including interest,
whichever is greater
8.    Work without permit: investigation fee:
Building, Electrical, Plumbing or Mechanical Code violations 9 times the Permit Issuance Fee plus the original permit fee
9.    Building Inspection Commission hearing fees:
Notice of appeal $471 per hour - Minimum Four Hours
Request for jurisdiction $471 per hour - Minimum Four Hours
Request for rehearing $471 per hour - Minimum Two Hours
10.    Additional hearings required by Code $471 per hour - Minimum Two Hours
11.    Violation monitoring fee (in-house) $149 each per month
12.   Failure to register vacant commercial storefront 4 times the registration fee
13.   Subordination $894
14.   Vacant building – initial and annual registration fee $1,850

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-L – PUBLIC INFORMATION

1.    Public notification and record keeping fees:
Structural addition notice $257 per hour - Minimum Three-Quarter Hour
Posting of notices (change of use) $257 per hour - Minimum Three-Quarter Hour
Requesting notice of permit issuance (each address) per year $257 per hour - Minimum Three-Quarter Hour
30-inch by 30-inch (762 mm by 762 mm) sign $64
2.    Demolition:
Notice of application and permit issuance by area/interested parties:
1 area (1 area = 2 blocks) $205 yearly fee for each area
3.    Demolition Notices:
300-foot (91.44 m) notification letters $184 per hour – Minimum Three Hours
Residential tenant notification $184 per hour – Minimum One-Half Hour
4.    Reproduction and dissemination of public information:
Certification of copies:
Each 10 pages or fraction thereof $33
Hard copy prints: $0.10
5.   Records Retention Fee
Each 20 pages or fraction thereof of plans or supporting
documentation (e.g. soil reports, structural calculations,
acoustical reports, energy calculations, etc.)
$74
6.   Report of residential records (3R) $286
7.   Duplication of Plans Administration Fee $113

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-M – RESERVED

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; removed by Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-N – ENERGY CONSERVATION

INITIAL INSPECTION COMPLIANCE INSPECTION
INITIAL INSPECTION COMPLIANCE INSPECTION
Single-family dwellings and two-family dwellings $448 $200
Apartment houses and residential hotels:
Up to 20 rooms $603 $299
Each additional 10 rooms or portion thereof $200 $155
Energy reports and certificates: $113
Filing fee for appeals: $226
Certification of qualified energy inspector: $450

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-O – RESERVED

TABLE 1A-P – RESIDENTIAL CODE ENFORCEMENT AND LICENSE FEES

1. One- and Two-family dwelling unit fees: $140 per rental unit
2.    Apartment house license fees:
Apartment houses of 3 to 12 units $542 per year
Apartment houses of 13 to 30 units $863 per year
Apartment houses of more than 30 units $1,066 and $156 for each additional 10 units or portion thereof
3.    Hotel license fees:
Hotels of 6 to 29 rooms $639 per year
Hotels of 30 to 59 rooms $956 per year
Hotels of 60 to 149 rooms $1,154 per year
Hotels of 150 to 200 rooms $1,454 per year
Hotels of more than 200 rooms $1,849 and $156 for each additional 25 rooms or portion thereof

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-Q – HOTEL CONVERSION ORDINANCE FEES

1. Annual unit usage report $228
2.   Appeal of initial or annual status determination: $405 per hour pursuant to Section 110A of this Code shall apply for
Department Inspector’s work on such request plus fees for Hearing
Officer
3.   Challenge to claims of exemption:
Usage report $113
Claim of exemption based on low-income housing $799
Claim of exemption based on partially completed conversion $1,199
4.   Complaint of unlawful conversion $113
Determination by Department of Real Estate and cost of independent
appraisals
Actual costs
5.   Initial unit usage report $799
6.   Permit to convert $1,317
7.   Request for hearing to exceed 25% tourist season rental limit:
Inspection staff review $405 per hour
Statement of exemption - Hearing Officer fee $797
8.   Unsuccessful challenge:

Usage report:

Inspection staff review $405 per hour
Statement of exemption - Hearing Officer fee $799
Request for winter rental:
Standard hourly inspection fee $405 per hour

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-R – REFUNDS

Partial or complete refunds of only those fees contained herein will be given, provided the applicant meets the refund requirements of the applicable section of this Code. No other fees are refundable, except as follows:

1. Application or Permit Issuance Fee:

Building, plumbing, electrical or mechanical permit issuance fee Amount paid less $357 or actual costs, whichever is greater. No refunds
given after work started.
Plan Review Fees (each) Amount determined by the Building Official less $357
Plan Review Fees (each) No Refund due after application deemed acceptable for Department of
Building Inspection Plan Review
2.    Miscellaneous Fees: Amount paid less $357
2.    Miscellaneous Fees: No refunds less than $357
2.    Miscellaneous Fees: No refunds given after work started.

No existing permittee who paid a fee under the fee schedules in effect at the time the fee was paid shall be eligible for a refund or subject to a fee reassessment as a result of an amendment to the fee schedules. If the Building Official determines that an error has been made in the assessment of fees, a refund for the portion determined to be in error may be made upon written request by the applicant.

(Amended by Ord. 174-23, File No. 230658, App. 7/28/2023, Eff. 8/28/2023; Ord. 115-24, File No. 240457, App. 6/18/2024, Eff. 7/19/2024; Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

TABLE 1A-S – UNREINFORCED MASONRY BEARING WALL BUILDING RETROFIT

Review of Inventory Form (Section 1604B.2.1) $372 per hour - Minimum Two Hours
Review of the summary of the engineering report (Section 1604B.2.3) $372 per hour - Minimum Two Hours
Board of Examiners filing fees (Section 105A7.4):
Each appeal for a variance from or interpretation of code requirements $372 per hour - Minimum Two Hours
Each appeal for the approval of substitute materials or methods of
design or construction (Section 105A.7.3)
$372 per hour - Minimum Four Hours

(Amended by Ord. 126-25, File No. 250592, App. 8/1/2025, Eff. 9/1/2025)

FIGURE 1A-I – 1851 HIGH-TIDE LINE MAP

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — San Francisco Building Inspection Commission Codes
San Francisco Building Inspection Commission Codes
  1. Section 101A — TITLE, SCOPE AND GENERAL
  2. Section 102A — UNSAFE BUILDINGS, STRUCTURES OR PROPERTY
  3. Section 103A — VIOLATIONS
  4. Section 104A — ORGANIZATION AND ENFORCEMENT
  5. Section 105A — BOARDS, COMMISSIONS, AND COMMITTEES
  6. Section 106A — PERMITS
  7. Section 107A — FEES
  8. Section 108A — INSPECTIONS
  9. Section 109A — CERTIFICATE OF OCCUPANCY; AMENDED CERTIFICATE O…
  10. Section 110A — SCHEDULE OF FEE TABLES
  11. Section 111A — ADAPTIVE REUSE
  12. Section 202 — DEFINITIONS
  13. Section 406 — MOTOR-VEHICLE-RELATED OCCUPANCIES
  14. Section 435 — SPECIAL PROVISIONS FOR LICENSED 24-HOUR CARE FAC…
  15. Section 456 — FENCES
  16. Section 707 — FIRE BARRIERS
  17. Section 901 — GENERAL
  18. Section 903 — AUTOMATIC SPRINKLER SYSTEMS
  19. Section 905 — STANDPIPE SYSTEMS
  20. Section 907 — FIRE ALARM AND DETECTION SYSTEMS
  21. Section 912 — FIRE DEPARTMENT CONNECTIONS
  22. Section 1010 — DOORS, GATES AND TURNSTILES
  23. Section 1011 — STAIRWAYS
  24. Section 1012 — RAMPS
  25. Section 1013 — EXIT SIGNS
  26. Section 1015 — GUARDS
  27. Section 1016 — EXIT ACCESS
  28. Section 1001A — SCOPE
  29. Section 1002A — DEFINITIONS
  30. Section 1003A — GENERAL REQUIREMENTS FOR SECURITY
  31. Section 1004A — SPECIAL HOTEL AND MOTEL SECURITY REQUIREMENTS
  32. Section 1005A — SPECIAL APARTMENT HOUSE AND CONDOMINIUM SECURITY
  33. Section 1101D — SCOPE
  34. Section 1102D — DEFINITIONS
  35. Section 1103D — DEPARTMENT COORDINATION
  36. Section 1104D — DISABILITY ACCESS COMPLIANCE UNIT
  37. Section 1105D — REPORTS TO THE MAYOR’S OFFICE ON DISABILITY AN…
  38. Section 1106D — NOTICE
  39. Section 1107D — [REPEALED]
  40. Section 1108D — [REPEALED]
  41. Section 1109D — [REPEALED]
  42. Section 1110D — [REPEALED]
  43. Section 1111D — [REPEALED]
  44. Section 1112D — [REPEALED]
  45. Section 1113D — [REPEALED]
  46. Section 1114D — [REPEALED]
  47. Section 1202 — VENTILATION
  48. Section 1204 — LIGHTING
  49. Section 1206 — SOUND TRANSMISSION
  50. 1208.4 Revise paragraph 1 of this section and add paragraphs 5…
  51. Section 1210 — [ ← ] TOILET, BATHROOM AND LACTATION ROOM REQUI…
  52. Section 1301A — TITLE
  53. Section 1302A — INTENT
  54. Section 1303A — DEFINITIONS
  55. Section 1304A — RULES AND GUIDELINES
  56. Section 1305A — CIVIL REMEDIES
  57. Section 1306A — REQUIREMENTS
  58. Section 1307A — INFORMATIONAL BROCHURE
  59. Section 1308A — POSTPONEMENTS OF REQUIREMENTS
  60. Section 1309A — EARLY COMPLIANCE WITH WATER CONSERVATION MEASU…
  61. Section 1310A — WATER CONSERVATION INSPECTIONS
  62. Section 1311A — PROOF OF COMPLIANCE WITH WATER CONSERVATION ME…
  63. Section 1312A — APPEALS FROM RESULTS OF A WATER CONSERVATION I…
  64. Section 1313A — REQUIRED WATER CONSERVATION MEASURES
  65. Section 1314A — WATER CONSERVATION INSPECTIONS
  66. Section 1301B — TITLE
  67. Section 1302B — RECOVERY OF CONSTRUCTION AND DEMOLITION DEBRIS
  68. Section 1303B — DEFINITIONS
  69. Section 1304B — PERMIT CONDITION
  70. Section 1305B — PERMIT NOTIFICATION
  71. Section 1301D — TITLE
  72. Section 1302D — PURPOSE
  73. Section 1303D — SCOPE
  74. Section 1304D — DEFINITIONS
  75. Section 1305D — COMPLIANCE REQUIREMENTS
  76. Section 1306D — LIGHTING EFFICIENCY MEASURES
  77. Section 1307D — ENFORCEMENT
  78. Section 1308D — RULES
  79. Section 1309D — UNDERTAKING FOR THE GENERAL WELFARE
  80. Section 1310D — PREEMPTION
  81. Section 1311D — SEVERABILITY
  82. Section 1402 — PERFORMANCE REQUIREMENTS
  83. Section 1501 — GENERAL
  84. Section 1502 — ROOF DRAINAGE
  85. Section 1505 — FIRE CLASSIFICATION
  86. Section 1511 — ROOF TOP STRUCTURES
  87. Section 1604 — GENERAL DESIGN REQUIREMENTS
  88. Section 1607 — LIVE LOADS
  89. Section 1704 — SPECIAL INSPECTIONS AND TESTS, CONTRACTOR RESPO…
  90. Section 1705 — REQUIRED SPECIAL INSPECTIONS AND TESTS
  91. Section 2304 — GENERAL CONSTRUCTION REQUIREMENTS
  92. Section 2405 — SLOPED GLAZING AND SKYLIGHTS
  93. Section 2603 — FOAM PLASTIC INSULATION
  94. Section 3010 — PRIVATE RESIDENCE ELEVATORS
  95. Section 3103 — TEMPORARY STRUCTURES
  96. Section 3107 — SIGNS
  97. Section 3116 — WOODBURNING APPLIANCES
  98. Section 3201 — GENERAL
  99. Section 3202 — ENCROACHMENTS
  100. Section 3203 — SIDEWALK CONSTRUCTION
  101. Section 3302 — CONSTRUCTION SAFEGUARDS
  102. Section 3303 — DEMOLITION
  103. Section 3304 — SITE WORK
  104. Section 3306 — PROTECTION OF PEDESTRIANS
  105. Section 3307 — PROTECTION OF ADJOINING PROPERTY
  106. Section 3311 — STANDPIPES
  107. Section J103 — PERMITS REQUIRED
  108. Section J104 — PERMIT APPLICATION AND SUBMITTALS
  109. Section J106 — EXCAVATIONS
  110. Section J109 — DRAINAGE AND TERRACING
  111. Section J112G — RADING FEES
  112. Section P101 — GENERAL
  113. Section P103 — EMERGENCY HOUSING
  114. Section P110 — EMERGENCY HOUSING FACILITIES SANITATION REQUIRE…
  115. Section P111 — EMERGENCY HOUSING FIRE AND LIFE SAFETY REQUIREM…
  116. Section P112 — ALTERNATIVES AND MODIFICATIONS
  117. 1604.4 Analysis. Any system or method of construction to be us…
  118. A401.1 Purpose
  119. A401.2 Scope. Omit.
  120. A403.1 General. All modifications required ... the building co…
  121. A403.2 Scope of analysis. This chapter requires the alteration…
  122. A403.3 Design base shear and design parameters. ... Despite an…
  123. A403.8 Horizontal diaphragms. The diaphragm immediately above …
  124. A405.1 New materials. New materials shall meet the requirement…
  125. 329.1 General.
  126. 329.2 Scope and Criteria
  127. 329.5 Voluntary Minimum Life-Safety Retrofit
  128. 10.1 Code-Based Site Classification
  129. 10.2 Ground Motion and Seismic Ground Deformation Characteriza…
  130. 10.3 Settlement Analysis
  131. 10.4 Sea Level Rise
  132. 10.5 Static and Seismic Design of Basement Walls
  133. 11.1 Driven Concrete and Steel Piles
  134. 11.2 Augered Cast-in-Place Piles
  135. 11.3 Drilled Shafts
  136. 13.1 Selection of Instrumentation and Monitoring Requirements
  137. 13.2 Pre-Construction Monitoring
  138. 13.3 Reporting
  139. 89.115 Add the following section:
  140. 89.115 Suppression. This code shall supersede all previous Ele…
  141. 89.116 Add the following section:
  142. 89.116 Maintenance. All electrical equipment, wiring and syste…
  143. 89.117 Add the following section:
  144. 89.117 Alternate Materials, Design and Methods of Construction.
  145. 89.118 Add the following section:
  146. 89.118 Change in Occupancy. Electrical equipment, wiring and s…
  147. 89.119 Add the following section:
  148. 89.119 Modifications. When there are practical difficulties in…
  149. 89.120 Add the following section:
  150. 89.120 Permits Required.
  151. 89.121 Add the following section:
  152. 89.121 Work Exempt from Permits. Electrical permits and fees s…
  153. 89.122 Add the following section:
  154. 89.122 Permit Issuance.
  155. 89.123 Add the following section:
  156. 89.123 Fees.
  157. 89.124 Add the following new section:
  158. 89.124 Powers and Duties of the Building Official.
  159. 89.125 Add the following section:
  160. 89.125 Violation. Any person, the owner or the owner’s authori…
  161. 89.126 Add the following section:
  162. 89.126 Unsafe Buildings or Structures. Any buildings, structur…
  163. 89.127 Add the following section:
  164. 89.127 Inspection.
  165. 89.128 Add the following section:
  166. 89.128 Survey. An electrical survey may be requested when an e…
  167. 89.129 Add the following section:
  168. 89.129 Board of Examiners. Application may be made to the Boar…
  169. 110.15 Revise this section as follows:
  170. 110.15 High-Leg Marking. On a 4-wire, delta-connected system w…
  171. 230.43 Revise this section as follows:
  172. 230.43 Wiring Methods for 1000 Volts, Nominal, or Less.
  173. 230.56 Revise this section as follows:
  174. 230.56 Service Conductor with the Higher Voltage to Ground. On…
  175. 230.71 Maximum Number of Disconnects.
  176. 250.50 Revise the first paragraph of this section as follows:
  177. 250.50 Grounding Electrode System. All grounding electrodes as…
  178. 300.37 Revise this section as follows:
  179. 300.37 Aboveground Wiring Methods. Aboveground conductors, 12K…
  180. 320.108 Revise this section as follows:
  181. 320.108 Equipment Grounding Conductor. Type AC cable shall pro…
  182. 330.12 Revise item (1) as follows:
  183. 330.12 Uses Not Permitted. Type MC cable shall not be used und…
  184. 330.108 Revise this section as follows:
  185. 330.108 Equipment Grounding Conductor. Where Type MC cable is …
  186. 334.10 Revise Item (2) as follows:
  187. 334.10 Uses permitted.
  188. 334.12 Add Items (11), (12) and (13) as follows:
  189. 334.12 Uses Not Permitted.
  190. 340.10 Revise Item (1) as follows:
  191. 340.10 Uses Permitted. Type UF cable shall be permitted as fol…
  192. 348.10 Revise this section as follows:
  193. 348.10 Uses Permitted. FMC shall be permitted to be used in [ …
  194. 350.10 Revise the first sentence as follows:
  195. 350.10 Uses Permitted. LFMC shall be permitted to be used [ ← …
  196. 352.10 Revise Item (A) as follows:
  197. 352.10 Uses Permitted. The use of PVC conduit shall be permitt…
  198. 355.10 Revise Item (A) as follows:
  199. 355.10 Uses Permitted. The use of RTRC shall be permitted in a…
  200. 356.10 Revise the first sentence of this section and item (5) …
  201. 356.10 Uses Permitted. LFNC shall be permitted to be used in e…
  202. 358.12 Add Item (3) as follows:
  203. 358.12 Uses Not Permitted. EMT shall not be used under the fol…
  204. 362.10 Revise Item 6 and delete Items 1, 2, 4, 5, 7, 8 and 9 a…
  205. 362.10 Uses Permitted. For the purpose of this article, the fi…
  206. 378.12 Add Item (6) as follows:
  207. 378.12 Uses Not Permitted. Nonmetallic wireways shall not be u…
  208. 411.5 Revise Section 411.5(A) as follows:
  209. 411.5 Specific Location Requirements.
  210. 760.46 Revise this section as follows:
  211. 760.46 NPLFA Circuit Wiring. Installation of non-power-limited…
  212. 760.180 Add the following new section:
  213. 760.180 System Requirements.
  214. Section 304 — STRUCTURAL DESIGN LOADS AND EVALUATION AND DESIGN
  215. Section 314 — EXISTING HIGH-RISE BUILDINGS [SFM]
  216. Section 324 — RESERVED
  217. Section 325 — RESERVED
  218. Section 326 — EXISTING BUILDINGS OR OTHER STRUCTURES LOCATED O…
  219. Section 327 — WORK PRACTICES FOR LEAD-BASED PAINT ON PRE-1979 …
  220. Section 328 — ASBESTOS INFORMATION AND NOTICE
  221. Section 329 — EARTHQUAKE EVALUATION OF PRIVATE SCHOOL STRUCTURES
  222. 405.2 Revise this section as follows:
  223. 405.2 Repairs to damaged buildings. Repairs to damaged buildin…
  224. Section 501 — GENERAL
  225. Section 502 — ADDITIONS
  226. Section 503 — ALTERATIONS
  227. Section 506 — CHANGE OF OCCUPANCY
  228. Section 508 — MOVED STRUCTURES
  229. Section 501B — PURPOSE
  230. Section 502B — SCOPE
  231. Section 503B — DEFINITIONS
  232. Section 504B — COMPLIANCE REQUIREMENTS
  233. Section 505B — ADMINISTRATION
  234. Section 506B — EXISTING UTILITY, FIRE PROTECTION, LIFE-SAFETY …
  235. Section 507B — ENERGY CONSERVATION
  236. Section 501C — PURPOSE
  237. Section 502C — SCOPE
  238. Section 503C — DEFINITIONS
  239. Section 504C — SYMBOLS AND NOTATIONS
  240. Section 505C — GENERAL REQUIREMENTS
  241. Section 506C — MATERIALS REQUIREMENTS
  242. Section 507C — QUALITY CONTROL
  243. Section 508C — ALLOWABLE DESIGN VALUES
  244. Section 509C — SELECTION OF PROCEDURE
  245. Section 510C — GENERAL PROCEDURE
  246. Section 511C — SPECIAL PROCEDURE
  247. Section 512C — ANALYSIS AND DESIGN
  248. Section 513C — DETAILED SYSTEM DESIGN REQUIREMENTS
  249. Section 514C — IN-PLACE MASONRY SHEAR TESTS
  250. Section 515C — TEST OF ANCHORS IN UNREINFORCED MASONRY WALLS
  251. Section 516C — POINTING OF UNREINFORCED MASONRY WALLS
  252. Section 501D — GENERAL
  253. Section 502D — CORRECTION OF HAZARDOUS PARAPETS AND APPENDAGES
  254. Section 503D — VARIANCE PROCEDURE
  255. Section 504D — UNREINFORCED MASONRY PARAPETS AND APPENDAGES
  256. Section 501E — PURPOSE AND INTENT
  257. Section 502E — SCOPE
  258. Section 503E — DEFINITIONS
  259. Section 504E — COMPLIANCE REQUIREMENTS
  260. Section 505E — PROGRAM IMPLEMENTATION AND ADMINISTRATION; FEE
  261. Section 506E — ENGINEERING CRITERIA FOR EVALUATION AND RETROFIT.
  262. Section 501F — GENERAL REQUIREMENTS AND SCOPE
  263. Section 502F — DEFINITIONS
  264. Section 503F — INSPECTION SCHEDULE
  265. Section 504F — FACADE INSPECTION AND MAINTENANCE CRITERIA AND …
  266. Section 505F — INSPECTION REPORTS.
  267. Section 506F — FEES
  268. Section 507F — COMPLIANCE, ENFORCEMENT AND ABATEMENT.
  269. 501G.1 Intent. This Chapter 5G is intended to advance public s…
  270. 501G.2 Definitions. In addition to the definitions in San Fran…
  271. 501G.3 Subject Buildings. The building inventory assessment re…
  272. 501G.4 Exemptions for Certain Concrete Buildings. Concrete Bui…
  273. 502G.1 Screening Process. The owner of each subject building s…
  274. 502G.2 Screening Form. Within six months of the effective date…
  275. 502G.3 Concrete Building Website. The Department shall maintai…
  276. Section 101 — GENERAL
  277. Section 202 — DEFINITIONS
  278. Section 301 — GENERAL
  279. Section 302 — MIXED OCCUPANCY BUILDINGS
  280. Section 303 — PHASED PROJECTS
  281. Section 304 — VOLUNTARY TIERS
  282. Section 305 — [OSHPD 1] – CALGREEN TIER 1 AND CALGREEN TIER 2
  283. Section 306 — [ ← ] – VOLUNTARY MEASURES
  284. Section 4.101 — GENERAL
  285. 4101.1 Revise the section as follows:
  286. Section 4.104 — [ ← ] HISTORIC PRESERVATION
  287. Section 4.105 — [ ← ] DEMOLITION OF EXISTING STRUCTURES
  288. Section 4.106 — SITE DEVELOPMENT
  289. Section 4.201 — GENERAL
  290. Section 5.101 — GENERAL
  291. Section 5.103 — [ ← ] – REQUIREMENTS FOR GROUP A, B, I, E and …
  292. Section 5.104 — [ ← ] – HISTORIC PRESERVATION
  293. Section 5.105 — [ ← ] DEMOLITION OF EXISTING STRUCTURES
  294. Section 5.106 — SITE DEVELOPMENT
  295. Section 5.201 — GENERAL
  296. Section 701 — GENERAL
  297. Section 702 — QUALIFICATIONS
  298. 703.1 Modify the section as follows:
  299. 703.1 Documentation. Documentation used to show compliance wit…
  300. Section 101.0 — TITLE
  301. 101.1 Revise this section as follows:
  302. 101.1 Title. This document shall be known as the [ ← ] 2022 Sa…
  303. Section 103.0 — DUTIES AND POWERS OF THE AUTHORITY HAVING JURI…
  304. 103.1 Revise the first paragraph as follows:
  305. 103.1 General. The Authority Having Jurisdiction shall be the …
  306. 103.4 Revise the first paragraph as follows:
  307. 103.4 Right of Entry. [ ← ] When it is necessary to make an in…
  308. 103.5 Add the following section:
  309. 103.5 Authority Having Jurisdiction May Adopt Rules and Regula…
  310. 103.6 Add the following section:
  311. 103.6 Code Revisions. The Authority Having Jurisdiction shall …
  312. Section 104.0 — PERMITS
  313. 104.2 Add item (6) as follows:
  314. 104.3 Replace this section as follows:
  315. 104.3 Application for Permit. [ ← ] Applications for permits t…
  316. 104.4 Replace this section as follows:
  317. 104.4 Permit Issuance. [ ← ] Permit processing and issuance fo…
  318. 104.5 Replace this entire section including subsections with t…
  319. Section 106.0 — VIOLATIONS AND PENALTIES
  320. 106.0 Add the following three sections:
  321. 106.7 Violations. Any person, the owner or the owner’s authori…
  322. 106.8 Any person, the owner or the owner’s authorized agent, w…
  323. 106.9 It shall be unlawful for any person to interfere with th…
  324. Section 107.0 — BOARD OF APPEALS
  325. 107.0 Replace this title and entire section as follows:
  326. 107.0 [ ← ] Board of Examiners. Applicants may appeal decision…
  327. Section 302.2 — ALTERNATE MATERIALS AND METHODS OF CONSTRUCTION
  328. Section 504.3 — DOMESTIC RANGE
  329. 504.3 Add a second paragraph as follows:
  330. Section 802.2 — CONNECTION TO VENTING SYSTEMS
  331. Section 802.6 — GAS VENTS
  332. Section 802.8 — THROUGH-THE-WALL VENT TERMINATIONS
  333. 802.8 Revise the first sentence of this section and add an exc…
  334. 802.8 Through-the-Wall Vent Termination. A mechanical draft ve…
  335. Section 925.0 — INCINERATORS AND CREMATORIES
  336. 925.1 Add the following sentence as a second paragraph:
  337. Section 1013.0 — INSPECTIONS AND TESTS
  338. 1013.1 Revise this section as follows:
  339. 1013.1 General. An installation for which a permit is required…
  340. 1013.2 Revise this section as follows:
  341. 1013.2 Operating Permit.
  342. 1013.3 Revise this section as follows:
  343. 1013.3 Maintenance Inspection. The Authority Having Jurisdicti…
  344. 1013.7 Revise the second paragraph as follows:
  345. Section 101.0 — GENERAL
  346. 101.1 Revise this section as follows:
  347. 101.1 Title. This document shall be known as the “ [ ← ] 2022 …
  348. Section 103.0 — DUTIES AND POWERS OF THE AUTHORITY HAVING JURI…
  349. 103.1 Replace the third paragraph with the following:
  350. 103.4 Revise the first paragraph of this section as follows:
  351. 103.4 Right of Entry. Where it is necessary to make an inspect…
  352. 103.5 Add the following section:
  353. 103.5 Rules and Regulations. The Authority Having Jurisdiction…
  354. 103.6 Add the following section:
  355. 103.6 Code Revisions. The Authority Having Jurisdiction shall …
  356. 103.7 Add the following section:
  357. 103.7 Modifications. When there are practical difficulties inv…
  358. Section 104.0 — PERMITS
  359. 104.1 Add the following as the second paragraph of this section:
  360. 104.2 Replace Section 104.2(1) and the first paragraph of Sect…
  361. 104.2 Exempt Work. A permit shall not be required for the foll…
  362. 104.3 Replace this section as follows:
  363. 104.3 Application for Permit. [ ← ] Permit applicants shall fi…
  364. 104.4 Add a new second paragraph to this section as follows:
  365. 104.5 Replace this section as follows:
  366. 104.5 Permit Fees. [ ← ] Before any permit is issued, the appl…
  367. Section 105.0 — INSPECTIONS AND TESTING
  368. Section 106.0 — VIOLATIONS AND PENALTIES
  369. 106.3 Replace this section as follows:
  370. 106.3 Penalties. [ ← ] Any person, the owner or the owner’s au…
  371. 106.5 Revise this section as follows:
  372. 106.5 Authority to Disconnect Utilities in Emergencies. The Au…
  373. Section 107.0 — BOARD OF APPEALS
  374. 107.0 Replace this title and the entire section as follows:
  375. Section 108.0 — ABATEMENT OF PUBLIC NUISANCE
  376. 108.0 Abatement of Public Nuisance. In order to abate a nuisan…
  377. Section 109.0 — REPAIRS TO DEFECTIVE BUILDING SEWERS
  378. 109.0 Repairs to Defective Building Sewers
  379. 109.1 General. Any defective building sewer found to be a nuis…
  380. 109.2 Cost of Repairs by City and County of San Francisco. Whe…
  381. 109.3 Plumbing Building Sewer Revolving Fund. A special revolv…
  382. 109.4 Assessment for Costs. The Authority Having Jurisdiction …
  383. Section 201.0 — GENERAL
  384. 201.1 Add the following to the end of the first sentence:
  385. Section 204.0 — B
  386. 204.0 Add the following definition:
  387. Section 208.0 — F
  388. 208.0 Add the following definition:
  389. Section 216.0 — N
  390. Section 218.0 — P
  391. 218.0 Revise this definition as follows:
  392. Section 221.0 — S
  393. 221.0 Add the following definition:
  394. Section 313.0 — HANGERS AND SUPPORTS
  395. 313.9 Add the following section:
  396. 313.9 Materials.
  397. Section 405 — PROHIBITED FIXTURES
  398. Section 415.0 — DRINKING FOUNTAINS
  399. 415.2 Add the following section:
  400. Section 504.0 — WATER HEATER REQUIREMENTS
  401. 504.1 Add the following as the first paragraph of this section:
  402. 504.1 Location. Water Heaters mounted on the exterior of a bui…
  403. Section 603.0 — CROSS-CONNECTION CONTROL
  404. 603.1 Add a third paragraph to this section as follows:
  405. 603.2 Revise Table 603.2 as follows:
  406. Section 604.0 — MATERIALS
  407. 604.1 Add the following sentence to the end of the second para…
  408. Section 606.0 — VALVES
  409. 606.2 Revise this section as follows:
  410. 606.2 Fullway Valve. A fullway valve controlling outlets shall…
  411. 606.3 Revise this section as follows:
  412. 606.3 Multidwelling Units. In multidwelling units, one or more…
  413. 606.5 Revise this section as follows:
  414. 606.5 Control Valve. A control valve shall be installed immedi…
  415. 606.11 Add the following section:
  416. 606.11 Backflow Assembly. All buildings four stories or more i…
  417. Section 609.0 — INSTALLATION, TESTING, UNIONS AND LOCATION
  418. Section 701.0 — GENERAL
  419. Section 706.0 — CHANGES IN DIRECTION OF DRAINAGE FLOW
  420. 706.4 Revise this section as follows:
  421. 706.4 Vertical to Horizontal. Vertical drainage lines connecti…
  422. Section 710.0 — DRAINAGE OF FIXTURES LOCATED BELOW THE NEXT UP…
  423. Section 901.0 — GENERAL
  424. 901.1 Add the following second paragraph to this section:
  425. Section 907.0 — VENT STACKS AND RELIEF VENTS
  426. 907.1 Revise the first sentence of this section as follows:
  427. 907.1 Drainage Stack. Each drainage stack that extends [ ← ] s…
  428. 907.3 Add the following section:
  429. 907.3 Vent Stacks and Relief Vents. Every building in which pl…
  430. Section 911.0 — CIRCUIT VENTING
  431. 911.0 Revise this section as follows:
  432. 911.0 Circuit Venting. Circuit venting is not permitted unless…
  433. 1001.3 Add the following section:
  434. 1001.3 Placement and Minimum Size of Building Traps. The build…
  435. Section 1008.0 — BUILDING TRAPS
  436. 1008.1 Revise this section as follows:
  437. 1008.1 General. Building traps shall not be installed except w…
  438. Section 1016.0 — SAND INTERCEPTORS
  439. 1016.3 Add the following section:
  440. Section 1101.0 — GENERAL
  441. Section 1208.0 — GAS PIPING SYSTEM DESIGN, MATERIALS, AND COMP…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.