Skip to content

Chapter 17.140 — WIND TURBINE TOWERS

Sebastopol Zoning Code · 2026-06 edition · updated 2026-07-07 · Sebastopol

17.140.010 Purpose – Applicability.

The purpose of these special permit criteria is to set forth guidelines and criteria by which specific applications for wind turbine towers are to be evaluated, in addition to the general conditional use permit criteria of the SMC.

17.140.020 Wind turbine tower criteria.

The following criteria shall be applied to wind energy conversion systems consisting of a wind turbine, a tower, and associated control or conversion electronics which will be used primarily to reduce or offset on-site consumption of utility power:

A. Tower height shall be calculated from height above grade of the fixed portion of the tower, excluding the wind turbine.

B. A conditional use permit shall be required for all wind turbine towers.

C. Applications shall include a site plan and elevations including certification thereof by a Statelicensed professional mechanical, structural, or civil engineer.

D. All structural, electrical and mechanical components of the system shall conform to relevant and applicable local, State and national codes.

E. Applications shall include information demonstrating that the system will be used primarily to reduce or offset on-site consumption of electricity.

F. Applications shall include information demonstrating that the provider of electric utility service to the site has been informed of the applicant’s intent to install an interconnected customer-owned electricity generator, unless the applicant intends, and so states in the application, that the system will not be connected to the electricity grid.

G. Applications shall include information analyzing potential shadow flicker effects on neighboring properties.

H. Applications shall include information certifying that the facility will not cause any disruption or loss of radio, television, telephone or similar signals to neighboring properties.

I. A small wind turbine tower system shall only be located on a parcel that is a minimum of one acre in size.

J. A tower shall not be located closer to a property line than one and one-half times the height of the tower.

K. Tower height shall not exceed a maximum height of 55 feet in residential districts, and 65 feet in nonresidential districts, and shall comply with any applicable Federal Aviation Administration (FAA) requirements.

L. Towers and associated equipment shall be of a nonobtrusive color, and towers shall not be lighted unless required by the FAA or other agency.

Page 120

Draft Title 17: Zoning Code

M. Except during short-term events including utility outages and severe wind storms, the system shall be designed, installed, and operated so that noise generated by the system does not exceed 55 dBA, as measured at the closest neighboring inhabited dwelling.

N. If electricity generated is terminated for 12 months or longer, the tower and all equipment associated with the system shall be removed.

O. In considering a conditional use permit, the Planning Commission shall have the authority to modify these standards based on specific characteristics of the property or the proposed installation, provided the Commission finds that such modifications are consistent with the intent of these regulations and of this title to promote harmonious land uses and minimization of adverse effects.

Page 121

Draft Title 17: Zoning Code

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Sebastopol Zoning Code
Sebastopol Zoning Code
  1. Chapter 17.04 — ZONING CODE
  2. Chapter 17.08 — DEFINITIONS
  3. Chapter 17.10 — ZONING DISTRICTS
  4. Chapter 17.20 — RESIDENTIAL DISTRICTS
  5. Chapter 17.25 — COMMERCIAL, OFFICE, AND INDUSTRIAL DISTRICTS
  6. Chapter 17.30 — COMMUNITY FACILITIES DISTRICT
  7. Chapter 17.32 — OS - OPEN SPACE DISTRICT
  8. Chapter 17.40 — PC - PLANNED COMMUNITY DISTRICT
  9. Chapter 17.44 — WETLANDS DISTRICTS (W, WS COMBINING, WF COMBIN…
  10. Chapter 17.46 — ESOS - ENVIRONMENTAL AND SCENIC OPEN SPACE COM…
  11. Chapter 17.48 — RECOVERY (REC) COMBINING DISTRICT
  12. Chapter 17.100 — GENERAL HEIGHT, YARD ENCROACHMENT, CREEK SETB…
  13. Chapter 17.110 — OFF-STREET PARKING REGULATIONS
  14. Chapter 17.120 — SIGN REGULATIONS
  15. Chapter 17.130 — GENERAL PROVISIONS RELATING TO TELECOMMUNICAT…
  16. Chapter 17.140 — WIND TURBINE TOWERS
  17. Chapter 17.150 — CULTURAL HERITAGE
  18. Chapter 17.160 — NONCONFORMING USES
  19. Chapter 17.200 — RESIDENTIAL DENSITY ALLOWANCES
  20. Chapter 17.210 — MANUFACTURED HOMES
  21. Chapter 17.220 — ACCESSORY DWELLING UNITS
  22. Chapter 17.225 — TEMPORARY CARE UNIT
  23. Chapter 17.230 — SMALL LOT SUBDIVISIONS
  24. Chapter 17.240 — CONDOMINIUM CONVERSION
  25. Chapter 17.250 — INCLUSIONARY HOUSING REQUIREMENTS
  26. Chapter 17.255 — AFFORDABLE HOUSING DENSITY BONUS
  27. Chapter 17.260 — HOME-BASED BUSINESSES
  28. Chapter 17.280 — PARK AND RECREATION LAND DEDICATION AND FEES
  29. Chapter 17.290 — PROHIBITION ON RENTAL HOUSING PRICE GOUGING A…
  30. Chapter 17.295 — DISASTER RECOVERY HOUSING PROVISIONS
  31. Chapter 17.300 — OUTDOOR USES
  32. Chapter 17.310 — PUBLIC ART - REQUIRING PUBLIC ART AS PART OF …
  33. Chapter 17.320 — TRANSITIONAL SITES
  34. Chapter 17.330 — OUTDOOR MUSIC AND NOISE IN THE DOWNTOWN
  35. Chapter 17.340 — FORMULA BUSINESS REGULATIONS
  36. Chapter 17.345 — SERVICE STATIONS AND CAR WASHES
  37. Chapter 17.350 — ALCOHOL USE PERMIT CRITERIA
  38. Chapter 17.355 — MOBILE FOOD TRUCK REGULATIONS
  39. Chapter 17.360 — COMPREHENSIVE CANNABIS REGULATIONS
  40. Chapter 17.400 — PROCEDURES AND ADMINISTRATION - GENERAL PROVI…
  41. Chapter 17.405 — ADMINISTRATIVE PERMIT
  42. Chapter 17.410 — ADJUSTMENT PROCEDURE
  43. Chapter 17.415 — CONDITIONAL USE PERMIT PROCEDURE
  44. Chapter 17.420 — VARIANCE PROCEDURE
  45. Chapter 17.425 — REASONABLE ACCOMMODATION UNDER THE FAIR HOUSI…
  46. Chapter 17.430 — TEMPORARY USE PERMITS
  47. Chapter 17.435 — DOWNTOWN NOISE PERMITS
  48. Chapter 17.440 — DEVELOPMENT AGREEMENTS
  49. Chapter 17.445 — GENERAL PLAN AND ZONING AMENDMENT PROCEDURE
  50. Chapter 17.450 — DESIGN REVIEW PROCEDURE
  51. Chapter 17.455 — APPEAL PROCEDURE
  52. Chapter 17.460 — PUBLIC HEARING PROCEDURE
  53. Chapter 17.470 — ENFORCEMENT/PENALTIES
  54. Chapter 17.500 — CITY GROWTH MANAGEMENT PROGRAM

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.