Chapter 17.450 — DESIGN REVIEW PROCEDURE
Sebastopol Zoning Code · 2026-06 edition · updated 2026-07-07 · Sebastopol
17.450.010 Purpose - Applicability. ¶
A. The purpose of these provisions is to prescribe the procedure for the review of the design and appearance of new development within the City. A design review permit shall be required for all new development or expansions to existing development as follows:
New residential developments of three or more contiguous lots in any district and a total of three or more new residential units;
New single-family residences in new residential subdivisions of three or more units; and
Proposed buildings or substantial additions or other substantial exterior modifications to existing buildings for which a building permit is required in districts other than single-family or duplex districts;
B. The following shall be exempt from the requirement for a design review permit:
- Rooftop photovoltaic installations shall not require design review unless the Planning Director determines that review is appropriate due to unusual characteristics of the installation or building.
17.450.020 Application. ¶
Application for design review shall be made as described at SMC 17.400.030. Applications for design review shall be accompanied by such information including, but not necessarily limited to, architectural drawings showing all the elevations of the proposed building(s) or structure(s), the relationship of the proposed building(s) or structure(s) to surrounding buildings, and the proposed landscaping or other treatment of the ground around such building or structure, including building placement, off-street parking and preliminary grading plans as may be required to allow applicable design review criteria to be applied to the proposal. All drawings shall be prepared by licensed design professionals, as may be required by State law.
17.450.030 Procedure for consideration. ¶
A. The Design Review Board may delegate to the Planning Director the authority to approve applications for design review for minor exterior alteration of any building or structure in any district requiring design review, or to approve any other application for design review which has been approved in concept by the Design Review Board.
B. In considering an application for design review, the Design Review Board, or the Planning Director, as the case may be, shall determine whether:
The design of the proposal would be compatible with the neighborhood and with the general visual character of Sebastopol;
The design provides appropriate transitions and relationships to adjacent properties and the public right-of-way;
It would not impair the desirability of investment or occupation in the neighborhood;
The design is internally consistent and harmonious;
Page 243
Draft Title 17: Zoning Code
- The design is in conformity with any guidelines and standards adopted pursuant to this chapter.
C. The Design Review Board, or the Planning Director, as the case may be, shall render approval only in conformity with subsection (B)(2) of this section, and such other resolutions and actions of the Design Review Board establishing standards and guidelines.
D. The Design Review Board, or the Planning Director, as the case may be, may designate such condition(s) in connection with the design review application it deems necessary to secure the purposes of this code, and may require such guarantee and evidence that such conditions are being, or will be, complied with.
17.450.040 Decision-making authority and public notice, public comment, and public hearing requirements. ¶
Refer to Table 17.400-1 for identification of the decision-making authority for approvals and appeals and to Table 17.400-2 for public notice, public comment, and public hearing requirements.
Page 244
Draft Title 17: Zoning Code
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Sebastopol Zoning Code
- Chapter 17.04 — ZONING CODE
- Chapter 17.08 — DEFINITIONS
- Chapter 17.10 — ZONING DISTRICTS
- Chapter 17.20 — RESIDENTIAL DISTRICTS
- Chapter 17.25 — COMMERCIAL, OFFICE, AND INDUSTRIAL DISTRICTS
- Chapter 17.30 — COMMUNITY FACILITIES DISTRICT
- Chapter 17.32 — OS - OPEN SPACE DISTRICT
- Chapter 17.40 — PC - PLANNED COMMUNITY DISTRICT
- Chapter 17.44 — WETLANDS DISTRICTS (W, WS COMBINING, WF COMBIN…
- Chapter 17.46 — ESOS - ENVIRONMENTAL AND SCENIC OPEN SPACE COM…
- Chapter 17.48 — RECOVERY (REC) COMBINING DISTRICT
- Chapter 17.100 — GENERAL HEIGHT, YARD ENCROACHMENT, CREEK SETB…
- Chapter 17.110 — OFF-STREET PARKING REGULATIONS
- Chapter 17.120 — SIGN REGULATIONS
- Chapter 17.130 — GENERAL PROVISIONS RELATING TO TELECOMMUNICAT…
- Chapter 17.140 — WIND TURBINE TOWERS
- Chapter 17.150 — CULTURAL HERITAGE
- Chapter 17.160 — NONCONFORMING USES
- Chapter 17.200 — RESIDENTIAL DENSITY ALLOWANCES
- Chapter 17.210 — MANUFACTURED HOMES
- Chapter 17.220 — ACCESSORY DWELLING UNITS
- Chapter 17.225 — TEMPORARY CARE UNIT
- Chapter 17.230 — SMALL LOT SUBDIVISIONS
- Chapter 17.240 — CONDOMINIUM CONVERSION
- Chapter 17.250 — INCLUSIONARY HOUSING REQUIREMENTS
- Chapter 17.255 — AFFORDABLE HOUSING DENSITY BONUS
- Chapter 17.260 — HOME-BASED BUSINESSES
- Chapter 17.280 — PARK AND RECREATION LAND DEDICATION AND FEES
- Chapter 17.290 — PROHIBITION ON RENTAL HOUSING PRICE GOUGING A…
- Chapter 17.295 — DISASTER RECOVERY HOUSING PROVISIONS
- Chapter 17.300 — OUTDOOR USES
- Chapter 17.310 — PUBLIC ART - REQUIRING PUBLIC ART AS PART OF …
- Chapter 17.320 — TRANSITIONAL SITES
- Chapter 17.330 — OUTDOOR MUSIC AND NOISE IN THE DOWNTOWN
- Chapter 17.340 — FORMULA BUSINESS REGULATIONS
- Chapter 17.345 — SERVICE STATIONS AND CAR WASHES
- Chapter 17.350 — ALCOHOL USE PERMIT CRITERIA
- Chapter 17.355 — MOBILE FOOD TRUCK REGULATIONS
- Chapter 17.360 — COMPREHENSIVE CANNABIS REGULATIONS
- Chapter 17.400 — PROCEDURES AND ADMINISTRATION - GENERAL PROVI…
- Chapter 17.405 — ADMINISTRATIVE PERMIT
- Chapter 17.410 — ADJUSTMENT PROCEDURE
- Chapter 17.415 — CONDITIONAL USE PERMIT PROCEDURE
- Chapter 17.420 — VARIANCE PROCEDURE
- Chapter 17.425 — REASONABLE ACCOMMODATION UNDER THE FAIR HOUSI…
- Chapter 17.430 — TEMPORARY USE PERMITS
- Chapter 17.435 — DOWNTOWN NOISE PERMITS
- Chapter 17.440 — DEVELOPMENT AGREEMENTS
- Chapter 17.445 — GENERAL PLAN AND ZONING AMENDMENT PROCEDURE
- Chapter 17.450 — DESIGN REVIEW PROCEDURE
- Chapter 17.455 — APPEAL PROCEDURE
- Chapter 17.460 — PUBLIC HEARING PROCEDURE
- Chapter 17.470 — ENFORCEMENT/PENALTIES
- Chapter 17.500 — CITY GROWTH MANAGEMENT PROGRAM