Chapter 12 — HYDRONICS

1220.4 Snow and Ice Melt Controls — 2025 California Mechanical Code

California Mechanical Code (Title 24, Part 4) · 2025 edition · updated 2026-10-19 · California

CBSC: official editions, supplements and errata

Italicized text is a California amendment to the model code, as printed in the official publication.

Cite as: 2025 California Mechanical Code (Title 24, Part 4) § 1220.4 · Effective January 1, 2026 · Official source: Building Standards Commission

An automatic operating control device that controls the supply hydronic fluid temperature to the snow and ice melt area shall be installed in the system. Snow and ice melt systems shall be protected from freezing with a mixture of propylene glycol or ethylene glycol, and water or other approved fluid. Automotive antifreeze shall not be used.

1220.4.1 Tube Placement. Snow and ice melt tubing shall be installed in accordance with the manufacturer’s installation instructions and with the tube layout and spacing in accordance with the system design. Except for distribution mains, tube spacing and the individual loop lengths shall be installed with a variance of not more than ±10 percent from the design.

«

«

«

1220.4.2 Tube Length. The maximum loop length of continuous tubing from a supply-and-return manifold arrangement shall not exceed the lengths specified by the manufacturer or, in the absence of manufacturer’s specifications, the lengths specified in Table 1220.4.2. Actual loop lengths shall be determined by spacing, flow rate, and pressure drop in accordance with the system design.

1220.4.3 Multizone Systems. In multizone systems, each zone shall have a tag or label securely affixed to the manifold to indicate the length of the loops and the area(s) served.

TABLE 1220.4.2

MAXIMUM LOOP LENGTHS FOR SNOW

AND ICE MELT SYSTEMS [1,2]

NOMINAL TUBE SIZE
(inches)
MAXIMUM ACTIVE
LOOP LENGTH (feet)
TOTAL LOOP LENGTH
(feet)


PE-RT and PEX Tubing


PE-RT and PEX Tubing


PE-RT and PEX Tubing

1_/_2
130 150

5/8
225 250

3_/_4
300 325

1
450 475


Copper Tubing3


Copper Tubing3


Copper Tubing3


1_/_2
– 140


3_/_4
– 280

For SI units: 1 inch = 25.4 mm, 1 foot = 304.8 mm

The total PE-RT and PEX loop lengths consist of two separate sections, the active loop, and the leader length. The active loop is installed within the heated slab. The leader length is the total distance to and from the manifold and heated slab, including any vertical distances. The manifolds shall be installed as close to the snow melt area as possible. In concrete use minimum Type L copper water tubing. In bituminous pavement use a Type K copper water tubing.

1220.4.4 Poured Structural Concrete Slab Sys- tems. Where tubes are embedded in a structural concrete slab, such tubes shall not be larger in outside dimension than one-third of the overall thickness of the slab and shall be spaced not less than three diameters on center except within 10 feet (3048 mm) of the distribution manifold. The top of the tubing shall be embedded in the slab not less than 2 inches (51 mm) below the surface of the finished concrete slab.

1220.4.5 Slab Penetration Tube and Joint Protec-

tion. Where embedded in or installed under a concrete slab, tubing shall be protected from damage at penetrations of the slab with protective sleeving approved by the tubing manufacturer. The space between the tubing and sleeve shall be sealed with an approved sealant compatible with the tubing. The tubing at the location of an expansion joint in a concrete slab shall be encased in a protective pipe sleeve that covers the tubing not less than 12 inches (305 mm) on either side of the joint or the tubing shall be installed below the slab. 1220.4.6 Concrete Slab Preparation. A solid foundation shall be prepared before the tubing is installed. Compaction shall be used for slabs, sidewalks, and driveways.

Notes: 1 The total PE-RT and PEX loop lengths consist of two separate sections, the active loop, and the leader length. The active loop is installed within the heated slab. The leader length is the total distance to and from the manifold and heated slab, including any vertical distances. 2 The manifolds shall be installed as close to the snow melt area as possible. 3 In concrete use minimum Type L copper water tubing. In bituminous pavement use a Type K copper water tubing. 1220.4.7 Insulation. Where a poured concrete snow melt system is installed in contact with the soil, insulation recommended by the manufacturer for such application and with a minimum R-value of 5 shall be placed between the concrete and the compacted grade; and be extended as close as practicable to the outside edges of the concrete.

1220.4.7.1 California Energy Code Insulation Requirements for Heated Slab Floors. See California Energy Code Section 110.8(g) and Table 110.8-A for additional insulation requirements for heated slab floors – a higher level of insulation is required for Climate Zone 16, and more detailed requirements for installing insulation are specified in all climate zones.

1220.4.8 Testing and Flushing. Testing of snow and ice melt systems shall be in accordance with Section 1205.2 and flushing shall be in accordance with Section 1205.3.

Explained in plain English

Guides that cite this section.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Mechanical Code (Title 24, Part 4)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.