5-3. ENTRY INTO RECAP
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-09-23 · United States
A. Above-Market Projects: Prior to Sunset, an owner of an eligible project may request:
- Option 3A (Lite): A renewal of the contract without debt restructuring, with the rents reduced to comparable market rents. Use the Interim (Lite) Mark-to-Market Renewal Contract (HUD-9641), for entry into Recap as a Lite. An Interim (Lite) Mark-to-Market Renewal Contract has a term determined by Recap, not to exceed
Chapter Five – Published March 2023
2
12 months. Rent adjustments are prohibited during the term of the Interim (Lite) Mark-to-Market Renewal Contract.
- Option 3B (Full): A debt restructuring and contract renewal (with a term of up to 20 years), with the rents reduced to comparable market rents. Use the Interim (Full) Mark-to-Market Renewal Contract, for entry into Recap as a Full. Rent adjustments are prohibited during the term of the Interim (Full) Mark-to-Market Renewal Contract.
Note: If HUD determines that contract rents exceed comparable market rents and the project is otherwise eligible for referral to Recap for debt restructuring and/or rent reduction, the AE must forward the project to Recap for processing.
Get a plain-English answer with a citation back to this text.
Ask AI about this code