1.3.4 Construction Responsibilities
HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States
A. Under MAP, HUD must approve the initial and final draws.
B. HUD will contract, or perform or otherwise provide, for inspection duties and will provide copies of the Trip Report to the MAP Lender. Generally, HUD will rely on one inspection per month; however, the Multifamily Regional Director has discretion to require additional inspections based on fact specific circumstances.
C. The MAP Lender will prepare and approve the interim draws during construction.
D. HUD must approve the construction amount for each item in the initial and final advance, and for each Change Order during construction.