12.3.3.1 Assignment

HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021) · 2026 edition · updated 2026-10-05 · United States

A. HUD CA will assign a third-party inspector to conduct inspections for the project. Upon assignment, the CA will issue the following to the inspector:

  1. Set No. 3 of the contract drawings and specifications. This set will be HUD’s “As-Built” document for the inspector to redline throughout construction to conform it to the contractor's "Record Set."

  2. Copy of the Construction Contract, form HUD-92442M for insured advances projects and other acceptable construction contract for Insurance Upon Completion projects (see Chapter 5, Section 5.5) or AIA A104 when applicable for certain refinance or acquisition transactions.

  3. Owner-Architect Agreement (AIA Document B108 or B104) when an Architect is required to administer the construction contract (see Chapter 5, Section 5.2.3.3).

  4. Contractor's and/or Borrower's cost breakdown. Schedule of Values, form HUD-2328 when insured advances are involved or list of repairs and alterations with costs summary as applicable for certain refinance or acquisition transactions.

  5. Drawings and specifications pertaining to off-site improvements.

  6. Agreements or contracts providing for off-site construction.

  7. Construction Schedule.

  8. Other construction-related documents such as repairs lists, relocation plans, etc.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — HUD Multifamily Accelerated Processing (MAP) Guide, HUD Handbook 4430.G (2020 ed., rev. Mar. 19, 2021)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.